Loading...
HomeMy WebLinkAboutSWP2702850.4i 0 E 1t LO 0 0 N I N Ln V7 O tz w Z J 0 D1 REMOVE GRASS, SHRUBS AS NEEDED. =- rWORK AREA RESTORE WITH GRASS 000 - - - - -- - - _ �� LIMITS (MAX) �\ �2 c\I MAINLY GRASS ' --- ---- �� C1 ROCKERY EXISTING SLOPE, _ V) cn. . w. 1.. Ij —-- o --- >oLli LLJ C1. i----------- z ..... a---- - --- - vJi PLANTED SLOPE — , - a _ ...... . .— - .Y...... (� + Une - - -- a cn -- - CB P�OPe W REPLACE CONC DRIVEWA B1 G3 _ _ EX. FORETE9r BkCKBERRtES— w'RC G3 ------ .. . e' � � -�, � 1. _. _._ � ,, D1 REMOVE SHRUBS, TREES, 8�w p� 1 BLACKBERRIES AS NEEDED. CB—g / / / o , _ _ �1 ;-, .� i \ . ,n i RESTORE WITH GRASS. - — - CB-5 --' ,--- �� C4 REMOVE GRASS \ AVM _ �' J 4/ sI , -� ; coNc D IVE� - -SHRUBS I _ -/ - - _ — PWR� _ T_ —' — — — I _ AS NEEDED' _ l _vi - ` _ — N _ — — — -p I _ = � I ° I EX. HEAVY BLACKBERRY GROWTH o n w poi w - 3 — PWR? 'SIQPe to °I // / ON STEEP SLOPE ,\ o �C2 LOGS 0 3; I %'/ A2 GRIND AND OVERLAY - --t- PROTECT o �— i' TREES (4) E1 LIMITED CLEARING BY HAND . Ft C3, REM VI -LANDSCAPING J PRESERVE BERM Al �; '� i' i Extend NEEDED, RESTORE o FOR ABOVE GROUND PIPE G2 N4-�. Dn waysI- ' �; DRAINS 82 .4 G1 2415 PARK PL N ,y o 14 ro - �t 1 +010 WORK AREA _ I I = R11NG BY NPE LIMITS (MAX) ' — —`I jl 1M1iEo Cl"EAGRpuNO P h\ 250 7 v m -- — L FpR ABOVE ! Park PL N y' aLO 2 _-� -- —°- U J -� LJ i G _ I ° I\N P-11 LLJ 0 t— — — — — — — — — — — — — - z _1 CL 0 a RESTORATION REVISIONS 10-15-07 NOTE G G1 EXTEND CONCRETE DRIVEWAY 12 FEET FROM PANEL LINE AT END OF GARAGE. SQUARE SOUTH END AS SHOWN. G2 LOWER DRAIN RIMS BY 2 INCHES, SLOPE DRIVEWAY TO DRAIN. INSPECT DRAIN LINES, CLEAN, REPAIR AS NEEDED PER B2. G3 REMOVE PLANTS/GRASS ALONG EAST EDGE OF DRIVEWAY (APPX 1 TO 1.5 FT WIDE) RESTORE WITH IMPORT FILL APPX 2 INCH BELOW TOP OF DRIVEWAY AND PLACE 4 INCHES OF BEAUTY BARK. rra r c�G / APPX END ABOVE GROUND PIPE' J,� ppyE OEO RESTORE °DITCH F4 I F� RPS r1E� P I F2 ROCKS'' REMOVE VEG APPX 6' DOWN LOPE, _� ,,�, N G P PLACE BACKFILL, TOPSOI ABRIC, PLANTINGS i= I �� p(EG QAN c�GPQ SEE DETAIL v �. B-LINES REMOVE SHRUBS,,/"LANDSCAPING F1 AS NEEDED j = CID ,it low 'ow RONAW J. MAM ON:6/18/07 PE /29727 OMM 10/16/07 RECOMMENDED FOR APPROVAL BY Daniel Carey 6/18/0 BY Q� W RESTORATION — LATE FALL IF INCLEMENT WEATHER CONDITIONS PREVENT COMPLETING RESTORATION IN THE FALL THE CONTRACTOR WILL PLACE AN EROSION FABRIC OVER EXPOSED SLOPES, AND ANY OTHER AREAS IDENTIFIED BY THE CITY. ASPHALT PATCHES WILL BE PLACED IN PAVED AREAS. THE CONTRACTOR SHALL REMOVE ALL EQUIPMENT AND MATERIALS FROM THE SITE. THE CONTRACTOR SHALL RETURN IN THE SPRING OF 2007 TO COMPLETE THE REMAINING RESTORATION WORK. REV15ED 10/15/07 SCAL ADDED DRIVEWAY CHANGES NOTE G WC 10 1 5 07 DWC S� ROTH HILL ENGRS& VEffnNAw 19M DESFGNED: As Noted HORIZONTAL• W 19W/199' DWC DRAWN: DWC ONE INCH DATUM CHECKED: AT FULL SCALE DWC/RJS IF NOT ONE INCH N0. REVISION BY DATE APPRJ,�711w D: SCALE ACCORDINGLY RJS CLEARING AND RESTORATION NOTES CLEARING ALL CLEARED VEGETATION, WOOD DEBRIS, TREES SHALL BE DISPOSED OF OFF SITE. AREA A Al PRESERVE EXISTING ASPHALT BERM IN FRONT OF DRIVEWAY AS POSSIBLE. PLACE TEMP BERMS AS NEEDED TO DIVERT RUNOFF FROM RUNNING DOWN DRIVEWAY. SAWCUT STREET FOR NEW PIPES PER CITY PATCH AND OVERLAY DETAIL HR 05. AREA B SAWCUT DRIVEWAY FOR PIPE INSTALLATION PER CITY PATCH AND OVERLAY DETAIL HR-05. AREA C C1 REMOVE END OF ROCKERY AS NEEDED FOR CONSTRUCTION, STOCKPILE ROCKS FOR RESTORATION. C2 REMOVE LOG SECTIONS, STOCKPILE FOR RESTORATION. C3 REMOVED LANDSCAPING AS NEEDED FOR ACCESS AND CONSTRUCTION. PRESERVE SMALL TREES AND SHRUBS BY BAGGING ROOTBALL IN BURLAP AND WATERING DAILY. C4 REMOVE GRASS, SHRUBS, BLACKBERRIES AS NEEDED FOR CONSTRUCTION. AREA D D1 REMOVE GRASS, SHRUBS, BLACKBERRIES, AND TREES AS NEEDED FOR NEW STORM LINE CONSTRUCTION. THE CONTRACTOR SHALL CLEAR ONLY THE AREA NEEDED FOR CONSTRUCION. DO NOT GRUB. AREA E E1 LIMITED CLEARING BY HAND ON SLOPE. NO MACHINERY ALLOWED ON SLOPE. DO NOT GRUB. SURVEY AND STAKE B-LINE. REMOVE BLACKBERRIES FOR AT LEAST 3 FEET ON EACH SIDE OF B-LINE FOR PIPE INSTALLATION. DO NOT DISTURB TOPSOIL. DO NOT CUT TREES OR OTHER SHRUBS. IDENTIFY ANY TREES OR OTHER FEATURES THAT MAY INTERFERE WITH PIPE INSTALLATION. PIPE LOCATION MAY BE ADJUSTED BY CITY TO AVOID TREES IN CLEARED AREA. CONTRACTOR SHALL ALLOW CITY 3 DAYS TO REVIEW AND ADJUST PIPE LOCATION BEFORE PROCEEDING. TREES MAY ONLY BE REMOVED WITH WRITTEN APPROVAL BY THE CITY. REMOVE ANY LOGS, FALLEN LIMBS, ROCKS, AND FILL ANY LARGE DEPRESSIONS IN CLEARED AREA SO PIPE WILL REST ON EVEN GROUND. AREA F F1 REMOVE SHRUBS, AND LANDSCAPING AS NEEDED TO INSTALL NEW PIPE. SALVAGE SIGN. IDENTIFY ANY TREES OR OTHER FEATURES THAT MAY INTERFERE WITH PIPE INSTALLATION. CONTRACTOR SHALL ALLOW CITY 3 DAYS TO REVIEW AND ADJUST PIPE LOCATION BEFORE PROCEEDING. TREES MAY ONLY BE REMOVED WITH WRITTEN APPROVAL BY THE CITY. TREES B, C, D MAY BE REMOVED. SAVE TREES A, E, F, G, X. AREA MAY BE USED FOR EQUIPEMENT AND MATERIAL STORAGE. F2 ROCK AND LOG/BRUSH PILE. MOVE ROCKS AWAY FROM WORK AREA AS NEEDED. REMOVE LOG/BRUSH PILE AS NEEDED AND DISPOSE OF OFFSITE. F3 SAWCUT ASPHALT FOR NEW PIPE PER CITY PATCH AND OVERLAY DETAIL HR-05. RESTORATION D-285004 AREA A A2 REPLACE ANY DAMAGED CURBING. GRIND AND OVERLAY ENTIRE STREET PER CITY PATCH AND OVERLAY DETAIL HR-05 RESTORE ASPHALT BERM IN FRONT OF DRIVEWAY FOR 2415 PARK PL. AREA B 131 REMOVE REMAINING CONCRETE DRIVEWAY FROM STREET TO WITHIN 1 FOOT OF GARAGE. REPLACE WITH NEW CONCRETE DRIVEWAY WITH EXPOSED AGGREGATE FINISH TO MATCH EXISITNG. MATCH EXISTING PANEL LINES AND JOINTS. B2 PRESERVE DRIVEWAY DRAINS, INSPECT, CLEAN LINES, IDENTIFY AND REPAIR AS NEEDED. AREA C C1 REBUILD ROCKERY WITH ORIGINAL ROCKS TO MATCH EXISTING. C2 REPLACE LOGS TO ORIGINAL LOCATIONS, OR AS DIRECTED BY CITY. C3 RESTORE AREA BY GRADING SMOOTH TO ABOUT 3 INCHES BELOW ADJACENT SURFACES, PLACE IMPORTED FILL WHERE NEEDED AND APPROVED. PLACE ABOUT 4 INCHES OF BEAUTY BARK. REPLANT BAGGED TREES AND SHRUBS. REPLACE OTHER PLANT SPECIES WITH NEW PLANTS TO MATCH EXISITNG SPECIES TYPE AND SIZE. C4 RESTORE AREA BY GRADING SMOOTH, PLACE IMPORTED FILL WHERE NEEDED AND APPROVED. PLACE 3 TO 6 INCHES OF TOPSOIL, HYDROSEED AND MULCH (DOTTED AREA). AREA D D1 RESTORE AREA BY PLACING IMPORTED FILL WHERE NEEDED AND APPROVED TO RESTORE GRADE TO BLEND WITH SURROUNDING GROUND, GRADE SMOOTH. PLACE 3 TO 6 INCHES OF TOPSOIL WHERE NEEDED, HYDROSEED AND MULCH (DOTTED AREA). AREA E E1 RESTORE AREA BY HANDSEEDING WITH GRASS AND MULCH. AREA F F1 RESTORE DISTURBED FORESTED AND NATURAL AREA BY PLACING IMPORTED FILL WHERE NEEDED AND APPROVED TO RESTORE GRADE, GRADING SMOOTH TO MATCH EXISITNG, PLACE 3 TO 6 INCHES OF TOPSOIL WHERE NEEDED, HYDROSEED AND MULCH. F3 REPLACE ANY DAMAGED CURBING. GRIND AND OVERLAY ASPHALT PER CITY PATCH AND OVERLAY DETAIL HR-05 F4 RESTORE SHALLOW DITCH BY HAND DIGGING AS NEEDED TO ROUTE AROUND NEW PIPE. F5 RESTORE LANDSCAPED AREA BY PLACING IMPORTED FILL AS NEEDED AND GRADING GROUND SMOOTH TO 3 INCHES BELOW THE TOP OF CURB AND ADJACENT GROUND SURFACES. REPAIR IRRIGATION PIPING AS NEEDED. REPLACE SIGN. TOPSOIL AND LANDSCAPING WILL BE REPLACED BY OTHERS, UNLESS SPECIFIED OTHERWISE. CITY OF N 26TH ST / PARK PL N STORM SYSTEM PROJECT DAM PARK FIELDBOOK: RENTON FAGS CLEARING - RESTORATION DRAWING NO: Planning/Building/Public Works Dept. 4 SHEET: OF: 6 T1 N b � > m Cm N �z � V � � 0