Loading...
HomeMy WebLinkAboutSWP2702862.4v C .N v C v C 0 v U w U T E 4-7 0 v v v C �3 c U O L c 0 C 0 a E L 0 C a� 0 C v 0 c 0 v L v Q N Z 0 L v D 3 U M yi L a v t U c v 0 r- 0 i N i t0 rn U a 3 3 U c v 0 U U v c C 0 1• U (D C .S? C v C N U O -a S) N LO N N 00 TF IF U Q NOTES: / I. PUGET SOUND EN GY OV RHEAD POWER LINES TO REMAIN, COORDINATE ELEVATION OF LINES AND SC C EARANCE REQUIREMENTS WITH PUGET SOUND ENERGY. NO OUTAGES ALL PERMITTED FOR TRANSMISSION LINES. / CONTACT: G RY M LLER (206) 521-5218 2. TEMPOR Y OU GES FOR TEMPORARY OVERHEAD FEEDER SHOWN ON PLAN WILL BE ' EDGE of wATE PERM I TED TH TWO WORKING DAYS NOTICE TO PUGET SOUND ENERGY. EDGE of WATER CON CT: I AN SWART (253) 395-6839 3. OR Cl Y OF RENTON SANITARY SEWER RELOCATION SEE DRAWING C45, 4, FO WATER LINE RELOCATION, SEE DRAWINGS C46—C48, i 5, URIED POWER, TELECOMMUNICATIONS, AND GAS RELOCATION BY OTHERS, CONTACTS: POWER; PUGET SOUND ENERGY, BRIAN SWART (253)395-6839 TELEPHONE; QWEST COMMUNICATIONS, DENNIS LIBADIA (206)345-4484 FIBER OPTICS; MCI—WORLDCOM (REPRESENTING SPRINT, BSNF, ATT, MCI AND WORLDCOM FOR JOINT RELOCATION PROJECT), MICHAEL FULMER (253)872-4005, LEVEL 3 COMMUNICATIONS, JERRY STORY (970)209-44 3 GAS; PUGET SOUND ENERGY, RANDY BUSCH (425 224-2163 HIGH PRESSURE FUEL; BP (OLYMPIC PIPELIN AND ES STREPO (425)235-7746 6, ALL 12" UNDERDRAIN PIPE SHALL BE PERFORATED CORRUGATED POLYETHYLENE (PE) WITH SMOOTH INNER WALL. ALL 6" UNDERDRAIN PIPE SHALL BE CMP, A i� 7. EXCEPT FOR UNDERDRAINS AND DETAIL ON C33, ALL DRAINAGE AND UTILITY TRENCHES — / INTO CDSM SHALL BE BACKFILL WITH CDF TO ORIGINAL LIMITS OF CDSM. EFE— PR6�-rL S ON DRAWINGS C34 TO C36 , D D P _— G -- G G G G W W W W 23+00 A — LINE U -S T G G- __________ T T T G S T 0 0 EXISTING UTILITY INFORMATION IS APPROXIMATE ONLY CALL TWO WORKING DAYS BEFORE YOU DIG 1-800-424-5555 W 24+00 G S S T D C W G- - T M — riv---- T — ®iv 0 o GRAVEL BACKFILL FOR DRAIN TOP OF CURB/SIDEWALK GUTTER FLOWLINE REQUIRED CDF BACKFILL ZONES CB STATION LEFT RIGHT CDF BACKFILL ZONES REQUIRED ZONE 1 ZONE 2 ZONE 3 ZONE 4 14+11 LEFT RIGHT X X X X X X X 15+70 LEFT X RIGHT X 18+07 LEFT X RIGHT X 19+51 LEFT X X X X RIGHT X X X r=� ZONE 2: BACKFILL CATCH BASIN EXCAVATION WITH CDF UP TO PREFABRICATED DRAINAGE MATERIAL 5'f ........................ ZONE 1: BACKFILL TRENCH AND CATCH BASIN EXCAVATIONS WITH CDF UP TO 0.1' PF!._OW PIPE PERFORATIONS --- PLAN Z N.T.S Q J W a W 0— I— m� U (n 0.5' MAX. (OMIT PERFORATIONS IN DRAIN PIPE) 4 W W Z V) 0 J J w Q J Q Q W � — � � NN Of W W OU ZW3::� O�UJ o i— �Q'Q :D m Z Q J (n V) � �JQ a- 4'0 .................... A SECTION N.T.S DN C. SLAB <FILL TRENCH PREFABRICATE DRAINAGE �MATERIAL STRUCTUAL CONC. SLAB 4 e e <4 "e v 4 Oe e a ZONE 3: BACKFILL FULL DEPTH OF TRENCH WITH CDF "A —GRAVEL BACKFILL 0.1' BELOW PIPE FOR DRAIN PERFORATIONS NOTE: CONTRACTOR SHALL CONSTRUCT FORMS AS NECESSARY TO PREVENT CDF FROM EXCEEDING LIMITS SHOWN. TYPICAL CDF BACKFILL FOR UNDERDRAIN TRENCH TRENCH AT LIMIT OF STRUCTURAL SLAB SCALE: N.T.S. 20 0 20 40 scale feet H U JAW I L,q IDIEIP`117. PT J13T W�RKSdrawn d' p ° s —ENGINEERING—STREETS—WATER—SEWER—PARKS—BUILDING— Z �s �O * * 1908 by date CONSULTANTS DRAINAGE AND UTILITY PLAN SHEET 2 ('� C33 sheet 35 of 144 designed MD 2/20/01 33301 9TH AVENUE SOUTH w 0-1 FEDERAL WAY, WASHINGTON BERGER/ABAM 98003-2600y EN:GI NEER$I Nc. VOICE: (206)431-2300 FAX: (206)431-2250 - BJA 2/20/0 1 checked GLP 2/20/01 SOUTH 180th STREET GRADE SEPARATION i 3/11/05 RECORD COPYproj job no A00084 eng CCW 2/20/01 proj dir GLP 2/20/01 2/17/ ADDENDUM NO. 3 scale '„=2°' date 20-Feb-2001 no date ----- revisions field bk no y x 00 0 bC n' O W to a 0 z 0 a Lost Saved on Wed May 19 2005 of 03.• 03PM by Hamilton File Nome.• 0.• 12000 IA000841 CAOD I dwgs I C-33. dwg Scale: 20