HomeMy WebLinkAboutSWP2702862.6TEMPORARY SHORING
v
C
-v
C
v
C
0
v
U
U
E
c
U
O
N
L
N
v
v
v'
C
�3
C
N
U
0
v
:c
C
0
C
0
v
E
0
4-
C
a�
s
0
C
v
4-
0
C
0
v
a>
v
-v
a�
N
.L
o
t
v
C
U
Q:
M
m
0
a
v
s
U
C
v
0
r-
0
1
r7
N
I
c0
U
a
C-
�3
U
C
v
v
0
U
U
v
C
v
U_
C
0
U
a�
0
C
C
a)
Q
v
L
C
N
U
O
-v
Ln
36"0 GAS CASING CHED)
GAS CARRIER PIPES (OTHERS
A STA 12+94, 8' LT
BEGIN CASING
APPROX LIMIT 30
`f1'-U t
A STA 13+39, 55' LT
END CASING
SOLDIER PILE
_ ER PILE
SOLDIER PILE
FASCIA PANEL
CDF BACKFILL
CDF BACKFILL, CDSM OVERLAP
I_ ---EDGE OF SEAL"
GAS CASING INSTALLATION WITHIN
SBALE 1•=20' LIMITS OF CDSM
GAS CASING PROFILE
SCALE: 1 "=20'
LOOKING NW
TEMPORARY SHORING
,"",.—PROPOSED BLOCK WALL EXISTING GRADE
z-- FINAL GRADE
EXCAVATE &
BACKFILL
W/CDF
EXCAVATE &
BACKFILL W/CDF
5' MIN
EXCAVATION LIMITS
GAS CARRIER PIPES (BY OTHERS)
GAS CASING
2'MIN OVERLAP 5' CDSM A SECTION A - A
MIN — SCALE: NTS
TEMPORARY SHORING
GAS CASING
r GAS CARRIER PIPES (BY OTHERS)
SOLDIER PILE WALL
`—FINAL GRADE
EXISTING GRADE
EXCAVATION B SECTION 13-13
LIMITS _ SCALE: NTS
:RLAP
V V VIVI
H
U
�y ip-tJ131LIEC: WC)IRIKS IE:)]E]Pr-]Ul •
s
o d —ENGINEERING—STREETS—WATER—SEWER—PARKS—BUILDING-
0
z
* *
1908
by
date
CONSULTANTS
DRAINAGE PROFILE
SHEET 2
C36
sheet 38 of144
job no A00084
designed
MD
2/20/01
33301 9TH AVENUE SOUTH
"`"
FEDERAL WAY, WASHINGTON
BERGERIABAM 98003-2600
E N ;G i N E E R S I N C. VOICE: (206)431-2300
FAX: (206)431-2250
drawn
BJA
2/20/01
checked
GLP
2/20/01
SOUTH 180th STREET GRADE SEPARATION
J3/11/05
RECORD COPY
proj eng
CCW
2/20/01
proj dir
GLP
2/20/01
2/17/
ADDENDUM NO. 3
scale 1 "=20'H, 1
n0
date
revisions
field bk no
date 20—Feb-21
"=5'V
)01 )
� 1
Lost Saved on Wed May 18 2005 at 03.•04W by Hamilton File Nome- 0.• 12000 IA00084 I CADD I dwgs I C-J6.dwg Scale.- 20