HomeMy WebLinkAboutTRO4102893.1g
v
n
IJ
rt
r
ILI
I
ryV
_ww
Of ry
M U
O LLJ
7-
0
2
I
a0
00
�41
C
�'
O o
8E�
E-+ W
0:aD_
�C
�_ E
•_ E
OIN
C
C
a (D
a
a.
m
�m
I
:. w
V)
z
0
U
E z
0 0
0 V)
J of
m
I
Q
0
z
30, 0 30'
SCALE." 1" = 30'
SEC. 4, TWP. 23 N., RGE. 5 E, W.M.
FA F 1 0 F M IF A IF _' 4 _' .40 JF = i
'i
aka HONEY CREEK HILL
r J /
a �
0
/
f I�r
r;
I }� ..
+ i "q- /
CALL BEFORE YOU DIG
1— 800— 424— 5555
UTILITIES UNDERGROUND LOCATION CENTER SHALL
BE CONTACTED PRIOR TO CONSTRUCTION ACTIVITY
IN PROXIMITY OF THE PETROLEUM TRANSMISSION
PIPEL INE L OCA TED WES T OF REDMOND A ve NE
M
WM POPP ASSOCIATES
11399 �� �Q. Transportation Engineers / Planners
RFGIST5: ��� 14-400 BLDG * #206 * 14400 BEL-RED RD
FS�ONAL ENG BELLEVUE, WA. 98007 (425) 401-1030
EXPIRES 1 /2�
CONTACTOR CABINET
SERVICE
& CIRCUIT
NO.
MAIN
BREAKER
BRANCH
BREAKER
CONTACTOR
COMMENTS
SERVICE
100 AMPS
-
-
SERVICE CABINET
A-1/240V
—
15A
30A
#0060
I C (` C kin
�J
TYPE I JUNCTION BOX
LUMINAIRE (EXISTING OR BY OTHERS)
+--i
LUMINAIRE (NEW)
®
NEW SERVICE CABINET
— — —
CONDUIT (NEW)
WIRE NOTE
0
CONSTRUCTION NOTE
- -
R.O.W.
®
PSE TRANSFORMER
POLE SCHEDULE
POLE
NO.
POLE
I.D. #
POLE
STATION
(FEET)
POLE
OFFSET
(FEET)
POLE
HEIGHT
(FEET)
MAST
ARM
(FEET)
LUMINAIRE TYPE
CIRCUIT
NO.
COMMENTS
1
3835B
20+62
25 L
25
8
10OW, HPS, MC3
A-1
POLE ORIENTATION ANGLE 19'
CLOCKWISE FROM OFFSET LINE
2
3837B
22+77
30 L
25
8
10OW, HPS, MC3
A-1
SEE AS —BUILT NOTE 1U
3
3839B
24+45
28 L
25
8
104W, HPS, MC3
A-1
GENERAL NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH THE CITY OF RENTON
STANDARDS SPECIFICATIONS AND THESE PLANS.
2. THE LOCATIONS OF FEATURES SHOWN ARE APPROXIMATE AND SHALL
BE VERIFIED IN THE FIELD BY THE CONTRACTOR AS NECESSARY.
3. INSTALL ALL STREET LIGHTING MATERIALS SHOWN ON THE PLANS,
EXCEPT WHERE NOTED. ALL MATERIALS SHALL BE NEW AND OF
THE BEST AVAILABLE GRADE OR QUALITY, EXCEPT WHERE NOTED,
4. THE CONTRACTOR SHALL SUBMIT A REQUEST TO THE CITY OF RENTON
FOR MATERIALS APPROVAL AT THE EARLIEST POSSIBLE DATE.
5. ALL WORK SHALL BE CONSISTENT WITH UTILITY AGENCY REQUIREMENTS.
THE CONTRACTOR SHALL CONTACT ALL PERTINENT UTILITY AGENCIES
48 HOURS BEFORE COMMENCING WORK AND SHALL COORDINATE THE
WORK WITH THE UTILITIES THROUGHOUT THE PROJECT.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING
UTILITIES. THE CONTRACTOR SHALL NOTIFY THE AFFECTED UTILITY
COMPANY AND THE CITY IMMEDIATELY UPON DAMAGE.
7. THE CONTRACTOR SHALL NOTIFY THE CITY OF RENTON FIELD INSPECTION
DIVISION (430-7203) FOR INSPECTION PURPOSES, 24 HOURS BEFORE
COMMENCING WORK. NO WORK SHALL BE COVERED UNTIL IT HAS BEEN
EXAMINED BY THE ENGINEER.
8. ALL CONDUIT SHALL BE PVC SCHEDULE 40 UNLESS NOTED OTHERWISE.
9. ALL CONDUIT COVER SHALL BE 24 INCHES.
CONSTRUCTION NOTES
0 INSTALL NEW FLAT LENS COBRA HEAD 10OW HPS, 240V, MEDIUM CUTOFF
TYPE III DISTRIBUTION ON 25' DAVIT POLE WITH 8' ARM. ALSO INSTALL
WSDOT TYPE I JUNCTION BOX (SEE STANDARD PLAN JR-36) AND PAD
FOUNDATION. SEE POLE SCHEDULE.
O2 INSTALL PHOTOCELL ON LUMINAIRE NO. 2.
O3 COORDINATE WITH PSE FOR SERVICE TERMINI AT NEAREST PSE 120/240
SINGLE PHASE, POWER SOURCE. INSTALL CONDUIT (2" SCH 40) AND WIRE
(3 #2'S) FROM POWER SOURCE TO SERVICE CABINET.
0 INSTALL SERVICE CABINET (#0060) ON NE 14TH COURT AT STA 35+95, 13' L.
AS —BUILT NOTES
�1 THE 2#8's FROM SERVICE CABINET (RUNQ2 ; LIGHTING) CONTINUE FROM LIGHTING
PAD #2 JUNCTION BOX INTO POLE #2 HANDHOLE (NO SPLICES). TWO SPLICE
KITS AND TWO FUSE KITS ARE IN HANDHOLE. 2#8's FROM HANDHOLE RETURN
TO ADJACENT JUNCTION BOX IN SAME CONDUIT.
L J TWO SPLICE KITS IN JUNCTION BOX EXTEND LIGHTING CIRCUIT (2#8's) FROM POLE
#2 HANDHOLE TO POLES 1 AND 3.
WIRING SCHEDULE
RUN
CONDUIT
CONDUCTOR
COMMENTS
NO.
SIZE
2"
2— 8 AWG USE—XLP) Lighting
#
(Schedule 40)
1—#8 Ground Ground
2"
2—#8 AWG (USE—XLP)
Lighting
�2
(Schedule 40)
3—#10 AWG (USE—XLP)
Photocell
1—#8 Ground
Ground
2"
(Schedule 40)
1—#8
Ground
2"
4—#8 AWG (USE—XLP)
Lighting
(Schedule 40)
3—#10 AWG (USE—XLP)
Photocell
1—#8 Ground
Ground
2"
(Schedule 40)
Open
Spare
RECOMMENDED
FOR APPROVAL
BY
BY
BY
G1
r'p 0 . or/ - iRe j
/ 1t • -7 z d
SCANNED NOV - 7 2003