HomeMy WebLinkAboutWTR2702915.2LANDSCAPE IRRIGATION NOTES AAD DETAILS
Irrigation Notes REVISED 1 /98
1. GENERAL CONTRACTOR AND LANDSCAPE CONTRACTOR TO COORDINATE:
A. INSTALLATION OF 110V ELECTRICAL SERVICE FROM ELECTRICAL SOURCE TO
AUTOMATIC CONTROLLER, INCLUDING WIRE HOOK-UP INTO MOUNTED
CONTROLLER. IRRIGATION CONTRACTOR WILL MOUNT CONTROLLER PER DESIGN
AND COORDINATE WITH GENERAL CONTRACTOR.
B. INSTALLATION OF IRRIGATION/SERVICE METER AND STUB TO
IRRIGATION POINT OF CONNECTION, PER UTILITY PLAN(S).
PROVIDE STANDARD THREADED STUB -OUT WITH THREADED CAP ON DISCHARGE
SIDE OF METER. STUB -OUT TO BE INSTALLED APPROXIMATELY 18 INCHES BELOW
FINISHED GRADE.
C. VERIFICATION OF STATIC WATER PRESSURE AT POINT -OF -CONNECTION (P.O.C.)
CONTRACTOR SHALL NOTIFY OWNER AND BARGHAUSEN CONSULTING ENGINEERS,
INC., OF ANY VARIATION IN STATIC PRESSURE OVER 5 PSI GREATER/LESS THAN
DESIGN PRESSURE.
D. INSTALLATION OF SLEEVING.
2. SYSTEM HAS BEEN DESIGNED FOR 39.2 GPM AT 35 PSI. STATIC PRESSURE BY WATER
DEPARTMENT TEST/CALCULATION 80 PSI. CONTRACTOR SHALL PROVIDE PRESSURE REDUCING
VALVE SET TO PROVIDE OPERATING PRESSURE.
3. ALL WORK PER LOCAL CODE. INSTALLATION PER MANUFACTURER'S SPECIFICATIONS.
4. ALL VALVES TO BE PLACED IN "CARSON" GRADE LEVEL BOXES WITH BOLT -LOCK LIDS (OR
APPROVED EQUAL). SET BOXES 1 INCH HIGHER THAN FINISH GRADE FLUSH WITH
FINISHED GRADES.
5. MAINLINE PIPE TO BE BURIED 18 INCHES AND LATERALS 12 INCHES BELOW FINISH GRADE
NO ROCK OR DEBRIS TO BE BACKFILLED OVER PIPE.
6. HEAD AND LINE POSITIONING IS DIAGRAMMATIC ON PLAN. ADJUST IN FIELD AS
NECESSARY FOR ADEQUATE COVERAGE. VALVES SHALL BE POSITIONED ADJACENT TO
CURBS, IN SHRUB BEDS WHERE POSSIBLE.
7. PROVIDE OWNER WITH TWO (2) SETS "AS -BUILT" DRAWINGS AND OPERATOR'S MANUAL
UPON COMPLETION. INSTRUCT OWNER AS TO PROPER WINTERIZATION OF IRRIGATION
SYSTEM (BLOW OUT).
8. FAMILIARIZE FACILITY OPERATOR WITH IRRIGATION SYSTEM FUNCTION, CONTROLLER
PROGRAMMING, SYSTEM OPERATION AND MAINTENANCE REQUIREMENTS.
9. NO SPRINKLERS ON RISERS SHALL BE INSTALLED NEXT TO WALKS, STREET, AND/OR
PAVEMENT. SPRINKLERS IN HAZARDOUS LOCATIONS SHALL BE FLUSH MOUNTED, POP-UP
MODELS ONLY. IRRIGATION HEADS ON RISERS SHALL BE NOTED ON THE PLANS.
10. RADIUS REDUCTION SHALL BE MADE BY USE OF PRESSURE ADJUSTMENT, SCREENS,
AND/OR ALTERNATE NOZZLES. IN -NOZZLE ADJUSTMENT IS LIMITED TO 10 PERCENT FOR
SPRAY HEADS AND PER MANUFACTURER'S LIMITS FOR OTHER SPRINKLERS. SPRINKLER
SPACING SHALL NOT EXCEED 60% OF THE DIAMETER OF THE PUBLISHED DATA.
11. ALL CONTROL WIRE SPLICES SHALL BE MADE AT VALVE BOXES WITH WATER TIGHT
ELECTRICAL SPLICES, 3M, SCOTT'S LOCK SEAL TACK 3576-78, OR EQUAL.
12. EACH VALVE BOX TO CONTAIN A MINIMUM OF ONE (1) SPARE ORANGE CONTROL WIRE
FOR JACKETED WIRE. ROUTE ONE SPARE WIRE FROM THE CONTROLLER TO THE LAST
VALVE OF EACH MAINLINE BRANCH. COMMON WIRE SHALL BE WHITE. SINGLE STRAND
WIRE SHALL BE A MINIMUM OF 14 GAUGE WITH SPARE WIRE TO BE YELLOW.
13. ALL ELECTRICAL EQUIPMENT SHALL BE U.L. TESTED AND APPROVED, AND SHALL BEAR
THE U.L. LABEL.
14. PROVIDE MANUAL SHUT-OFF VALVE TO LINES ENTERING RIGHT-OF-WAY WHEN
ZONED IN COMMON WITH PRIVATE LINES. MINIMUM OF 24 INCHES INSIDE PROPERTY
LINE IN 6-INCH DIAMETER VALVE BOX.
15. CROSS CONNECTION PROTECTION INSPECTION REQUIRED. THE BACKFLOW DEVICE SHALL
BE TESTED UPON THE ORIGINAL INSTALLATION. THE TESTING SHALL BE PERFORMED BY
A PERSON HOLDING A CURRENT CERTIFICATE AS A BACKFLOW TESTER. THE TEST REPORT
SHALL BE SUBMITTED TO THE LOCAL WATER DISTRICT, OR PURVEYOR, AND OWNER
WITH COPY TO BARGHAUSEN CONSULTING ENGINEERS, INC. CONTRACTOR SHALL
INCLUDE TESTING IN THE SCOPE OF WORK. OWNER IS RESPONSIBLE FOR ANNUAL
INSPECTIONS AFTER THE INITIAL INSPECTION.
16. CONTRACTOR SHALL PROVIDE SYSTEM WINTERIZATION/SPRING SERVICE WHEN
INSTALLATION HAS BEEN COMPLETED WITHIN 90 DAYS OF NOVEMBER 1 FOR
WINTERIZATION, OR MAY 15 FOR SPRING SERVICE. SERVICE TO BE PERFORMED AS
NEAR AS PRACTICAL TO THE ABOVE DATES, OR AS FREEZE/PRECIPITATION CONDITIONS
DETERMINE SERVICE NEED.
17. IRRIGATION SCHEDULING:
THE IRRIGATION CONTROLLER CONTAINS A WATER BUDGET FEATURE. PERIODIC
(WEEKLY) ADJUSTMENT OF THE WATER SCHEDULE IS INTENDED TO BE MADE VIA
BUDGET ADJUSTMENT. RE -ADJUST WATERING DAYS AT 100 PERCENT BUDGET WHEN
ADJUSTMENT EXCEEDS 30%. SET CONTROLLER FOR HIGHEST ETo WATER SCHEDULE,
BASED ON PUBLISHED LOCAL EVAPOTRANSPIRATION DATA. SYSTEM HAS BEEN DESIGNED
FOR 50 TO 80 PERCENT DISTRIBUTION UNIFORMITY. TURF ZONES SHOULD BE SCHEDULED
FOR 100 PERCENT REPLACEMENT FACTOR ON A TYPICAL MINIMUM 3-DAY CYCLE. SHRUB
ZONES SHOULD BE PROGRAMMED AT 40 TO 70 PERCENT OF THE MONTHLY TURF WATER
REQUIREMENT ON A ONCE PER WEEK CYCLE. ALL WATERING IN EXCESS OF THE LOCAL
ETo ("FIELD RECHARGE") SHALL BE COMPLETED DURING THE CONSTRUCTION PHASE WHILE
THE CONTRACTOR IS ON THE JOB SITE. OVER WATERING OF LANDSCAPE DUE TO
CONTROLLER SCHEDULING SHALL BE GROUNDS FOR CONTRACTOR TO REPAIR ANY
RESULTANT DAMAGES AT HIS OWN EXPENSE.
18. SUBSTITUTION OF IRRIGATION MATERIAL/EQUIPMENT SHALL BE MADE ONLY UPON
WRITTEN APPROVAL OF OWNER'S REPRESENTATIVE.
19. ALL TURF ZONES SHALL PASS A MINIMUM DISTRIBUTION UNIFORMITY OF 62 PERCENT, AS
TESTED THROUGH AN IRRIGATION ASSOCIATION CERTIFIED WATER AUDIT.
wrR- sa-
w
z
z
d
z
0
a
2
SW 1/4 SECTION 18, TWP. 23 N., RGE. 5 E., W.M.
DOUBLE CARSON
GRADE LEVEL VALVE
BOXES
—WILKINS 600
PRIES. REDUCING VALVE
AS NECESSARY
T X S COUPLING:
CONTR. TO PROVIDE
THREADED FTG, AND CAP a
ON DISCHARGE SIDE OF <
METER.
U
/ V
SCH 80 /QUICK COUPLING
PVC UNION VALVE (BLOWOUT)
DOUBLE CHECK METER PER
VALVE PER DETAIL CITY STANDARDS
SCH 80 PVC UNION METER STOP
PVC PER CITY STDS.
• THE BACKFLOW DEVICE SHALL HAVE 6"
MINIMUM UNOBSTRUCTED CLEARANCE ON ALL SIDES
POINT OF CONNECTION (P.O.C.) DETAIL
NOT TO SCALE
6"/12" POP
AT SHRUBS
4" POP
AT TURF
SPRINKLER -
FLUSH AT LAWN
& FLUSH WITH
MULCH LINE
SPRINKLER -
SCH 80 PVC
NIPPLE
LATERAL
v a -�
'll -
--
6" CLR. OF
OBSTRUCTION
�
=
MANUFACTURER'S LIMITS PREVAIL FOR
INSTALLATION AND ADJUSTMENTS.
• PROVIDE SWING JOINT RISERS AT WALKS AND CURBS.
24" FLEXIBLE RISERS ACCEPTABLE ELSEWHERE.
POP-UP RISER ASSEMBLY
NOT TO SCALE
MULCH CONDITION
FINISH GRADE
ADJUST ANGLE AT
SLOPE COVERAGE
CONDITIONS. 50% OF
SLOPE ANGLE (TYP)
_MARLEX
90' ELBOW
MARLEX
90' ELBOW
SCH 40 PVC
TEE SxSxT
(SIDE INLET ONLY)
z
U
o Cyr o o TOPSOIL (FINISH / / �-
o o cp o GRADE)/
PAVING SECTION
PER CIVIL PLANS
v COMPACTED BACKFILL q_O �C
AT 90% DENSITY o( c
(TOPSOIL BACKFILL)
CV
AT 95% DENSITY
0 00 o0o°oOC� (STRUCTURAL)) ` -
�;
o E (� o n PVC LATERAL
6" OFFSET O SLEEVE(S) (�
00(_ ,00 ALT. WIRE SLEEVE o�c c
PVC MAINLINE
a VALVE WIRING O
o c
m PIPE BED MATERIAL E
TO BE CLEAN & FREE
OF ROCK LARGER
THAN 1 /2" _.
* SLEEVING MATERIAL SHALL BE PVC CLASS 160(SDR-26).
* DIMENSIONS ARE MIN. CLEARANCES.
* ALL IRRIGATION SLEEVING TRENCH BACKFILL MATERIAL SHALL
BE CLASS "B" OR BETTER (MAX. OF 10% PASSING NO.40 SCREEN) AND BE
COMPACTED TO MIN. 95% OPTIMUM DENSITY PER ASTM D-1557-70
(MODIFIED PROCTOR)
SLEEVE/TRENCHING DETAIL
NOT TO SCALE
a
ZD
FINISH
"'
GRADE
ZE
SCH 80 —
NIPPLE
SCH 80 SXT
100
90' ELBOW
o
SCH 80
NIPPLE
WIRE WITH WATERPROOF WIRE
CONNECTOR
__- PLASTIC CONTROL VALVE
BOX WITH COVER
(10" DIA.x12" MIN.)
PVC LATERAL
TO SPRINKLERS
� ` c` 'C 6 JO may_ PVC SCH 80 NIPPLE
O O E �O E O AND FEMALE ADAPTOR
o BOO o J` REMOTE CONTROL VALVE;
BODY CLEAR OF SUMP
v PVC MAINLINE 1 C.F. 7/8" GRAVEL SUMP
MAIN LINE FITTING
NOTES: SCH 40 SLIP TEE
-PROVIDE EXTRA COILS (18") OF EACH WIRE IN VALVE BOX
-TAPE WIRE TOGETHER EVERY 20 FT.
-MIN. 6" DEPTH, 7/8" WASHED GRAVEL UNDER EACH VALVE
-COMPACT SOIL AROUND VALVE BOX
-USE TEFLON OR FLOWABLE SEALANT IN ALL THREADED FITTINGS, PER
MANUFACTURES SPECS.
REMOTE CONTROL VALVE
NOT TO SCALE
EQ EQ
DOUBLE GRADE LEVEL BOXES
-- -- SIZE TO PERMIT 12" MIN. CLR.
LD FROM WALLS TO TEST COCKS;
j BOLT LOCK LID.
WATER SERVICE DOUBLE CHECK VALVE (STATE APPROVED
FROM METER ASSEMBLY) RESILIANT SEATED VALVES &
° TEST COCKS; INSTALL ASSEMBLY AS
o ° ° SHOWN OR THE TEST COCKS IN HORIZONTAL
IN ° POSITION, PER LOCAL REQUIREMENTS.
° OUT PVC MAINLINE PER PLAN
W
U
z
m
z
4
N
--
L�i
�,
SCH 80 NIPPLE & FEMALE
ADAPTER
UNION AT EACH SIDE OF VALVE
J
SCH 80 PVC
SCH 80 NIPPLE (TYP.)
o
o c
Z
BLOCK AS NECESSARY WITH BRICKS
�O JOB
PC
OR CONC. BLOCKS AT BASE OF VAULT
CV
O EO L
�O -�
GRAVEL SUMP-7/8" WASHED GRAVEL
O o O �� c O =1 !
n E` n r
III---
NOTE:
INSPECTION OF COMPLETED ASSEMBLY
- '' -�
BY CERTIFIED TESTER REQUIRED.
CHECK VALVE ASSEMBLY
NTS
z
m
N
FINISH GRADE
PLASTIC VALVE BOX
(10" DIA.)
QUICK COUPLING VALVE
1 C.U. FT. 7/8" GRAVEL
SUMP
MARLEX ELL (TYP.)
SCH 80 P.V.C. NIPPLE
SCH 40 PVC SXSXT TEE
QUICK COUPLING VALVE
NOT TO SCALE
pf TO?
r STATE OF
WASHINGTON
REGISTERED
7E-
3,RUCE ARCHITECT
McCRORY
TE NO. 504
(VALID ONLY WITH SIGNATU
CITY OF RENTON
[DEPARTMENT OF= PUBLIC WORKS
m
J
i
N
in
x
w
0
CA
n
V)
0
0
cv
Ln
N
E
v
c
0
01
01
v
rn
r
0
Of
a_
0
i
:W
me
s..
C
G�
O
m
r
Y n
e
y
N y
o
N
�
z
O
G�
�
`J 1