Loading...
HomeMy WebLinkAboutWTR2702953.20 0 a 7 11 5 4 3 0 I IOCATION MAP 0 714 7/2 7 SCALE IN MILES f-405 LAKE WASHINGTON =' s e<V� PROJECT SITE w MAPLEWOOD Q WATER TREATMENT LIJ FACILITY ty50 RENTON Q BR�y O 169 FR I-405 VICINITY MAP bc15� .4st t Rentoi e Maplewood Golf Course %,y 169 SE s �C Renton Maple V°fle Y Rd aaa 0 ISSUED FOR BID NO. REVISION A i B RB 7/031 GP BY DATE APPR C r y 'LIST OF DRAW N (__3S J I/ COVER SHEET NETTING STRUCTURAL GENERAL N1 POLE/NETTING PLAN N2 NETTING ELEVATIONS & SECTIONS G i VICINITY MAP, LOCATION MAP AND DRAWING INDEX N3 DETAILS &NOTES G2 PROCESS FLOW SCHEMATIC N4 DE RAIL S CIVIL ARCHITECTURAL C1 STANDARD CIVIL LEGENDS Al GENERAL NOTES AND ABBREVIATIONS C2 SITE ORIENTATION PLAN A2 TREATMENT FACILITIY GROUND FLOOR PLAN C3 EXISTING SITE FEATURES A3 TREATMENT FACILITY EXTERIOR ELEVATIONS - SHEET 1 C4 FINISHED SITE FEATURES 1 OF 2 A4 TREATMENT FACILITY EXTERIOR ELEVATIONS - SHEET 2 C5 FINISHED SITE FEATURES 2 OF 2 A5 TREATMENT FACILITIY ENLARGED PLAN AND BUILDING SECTIONS C6 SITE ACCESS PLAN 1 OF 2 A6 TREATMENT FACILITIY WALL SECTIONS & DETAILS C7 SITE ACCESS PLAN 2 OF 2 A7 TREATMENT FACILITIY DOOR SCHEDULE, FINISH SCHEDULE & DOOR DETAILS C8 TEMPORARY EROSION AND SEDIMENT CONTROL A8 TREATMENT FACIL ITY ENLARGED ELEVA IIONS, & MISC. DETAILS C9 EROSION CONTROL NOTES A9 TREATMENT FACILITY MISC. DETAILS C10 EROSION CONTROL DETAILS 1 OF 2 A10 TREATMENT FACILITY WALL TYPES C11 EROSION CONTROL DETAILS 2 GF 2 C12 DEMOLITION PLAN 1 OF 2 STRUCTURAL C13 DEMOLITION PLAN 2 OF 2 C14 EXCAVATION PLAN 1 OF 4 Sl STRUCTURAL GENERAL NOTES, ABBREVIATIONS AND STANDARD DETAILS C 15 EXCAVATION PLAN 2 OF 4 S2 STRUCTURAL REINFORCED CONCRETE NOTES AND STANDARD DETAILS C16 PRE -LOAD EXCAVATION PLAN 3 OF 4 S3 STRUCTURAL REINFORCED CONCRETE MASONRY UNIT AND STANDARD DETAILS C17 EXCAVATION PLAN 4 OF 4 S4 STRUCTURAL FOUNDATION PLAN C18 EXCAVATION SECTIONS AND DETAILS S5 STRUCTURAL GROUND FLOOR PLAN AND SECTIONS C19 YARD PIPING OVERVIEW S6 STRUCTURAL ROOF FRAMING PLAN C20 UTILITY DETAILS 1 OF 2 S7 STRUCTURAL FOUNDATION SECTIONS C21 UTILITY DETAILS 2 OF 2 S8 STRUCTURAL FOUNDATION SECTIONS C22 STORM PIPING OVERVIEW S9 STRUCTURAL FOUNDATION SECTIONS AND DETAILS C23 STORM MANHOLE #1 - OUTFAL L S10 STRUCTURAL MASONRY SECTIONS AND DETAILS C24 AIR GAP #1 - STORM MANHOLE #3 Sll STRUCTURAL ROOF SECTIONS AND DETAILS C25 CB #5 - STORM VAULT 1, CB #6 - S12 STRUCTURAL PIPE SUPPORT RACK SECTIONS AND DETAILS STORM VAULT 11, CB #1 - STORM VAULT 1 S13 STRUCTURAL PIPE SUPPORTS PLAN, SECTIONS AND DETAILS C26 S T ORMWATER VAULT I AND II S14 STRUCTURAL MONORAIL AND PIPE SUPPORT PLAN, SECTIONS AND DETAILS C27 STORM VAULT DETAILS C28 STORM DETAILS 1 OF 2 MECHANICAL C29 STORM DETAILS 2 OF 2 _ -- - S , i NRY ��vvct� r L H�� {,d', tt:�ni i A,1, t �a, — rn .,��, ;, , �� AL S �' y°,3CL.,, `�C�� ADS ADD ,^,BBREVIATIONS C 3 1 SANITARY SEWER DETAILS M2 PIPE SCHEDULE C32 WATER PIPING OVERVIEW M3 PARTIAL PLAN @GREEN SAND FILTRATION C33 WELL 11 AND 17 SUPPLY PLAN M4 PARTIAL PLAN @ GAC FILTRATION C34 WELL 12 SUPPLY AND BCW PLAN M5 SECTION B LOOKING @ SOUTH WALL -FILTRATION BUILDING C35 LOCAL WATERMAIN UPGRADES M6 SECTION C LOOKING NORTH @ GAG/ GS VESSELS C36 565/196 ZONE PRV M7 SECTION D LOOKING EAST @ GS VESSEL PIPING C37 EXISTING OVERFLOW MODIFICATIONS M8 SECTION A LOOKING WEST @ GAC VESSEL PIPING C38 WATER DETAILS 1 OF 2 M9 SECTION F LOOKING @ WEST WALL - FILTRATION ROOM C39 WATER DETAILS 2 OF 2 M10 PARTIAL PLAN @ BACKWASH PUMPS C40 CHEMICAL CONVEYANCE/CONTAINMENT SYSTEM M11 SECTIONS E AND E1 @ BACKWASH PUMPING AREA C41 CHEMICAL CONTAINMENT DETAILS M12 PARTIAL PLAN AND SECTION @ GAC FILTRATION AND UTILITY ENTRY AREA C 4 2 ROAD/PARKING OVERVIEW M13 PARTIAL PLAN AND SECTION @ AIR SCOUR BLOWER, C43 RETAINING WALL PLAN ELECTRICAL AND CONTROL ROOMS C44 RETAINING WALL DETAILS M14 PARTIAL PLAN @ RAW WATER MANIFOLD AND LOW LIFT PUMP ROOM C45 ROAD ALIGNMENT PLAN AND PROFILE 0+00 - 14+20 M15 SECTIONS G AND H C46 ROAD ALIGNMENT PLAN AND PROFILE 14+20.00 - 18+57.50 M16 SECTIONS J AND K C47 ROAD SECTIONS/DETAILS M17 PARTIAL PLAN @ HYPOCHLORITE FEED AND WATER SUPPLY ROOMS C48 ROAD SECTIONS/DETAILS M18 SECTIONS M THROUGH CHEMICAL FEED ROOMS M18.1 SECTIONS L & N THROUGH HYPOCHLORITE FEED ROOM C49 MISCELLANEOUS IMPROVEMENTS M19 PAR I IAPLAN @ HYPOCHLORITE STORAGE TANK VAULTS C50 LANDSCAPING PLAN M20 SECTIONS P AND Q @ HYPOCHLORITE STORAGE VAULTS C-01 IRRIGATION RESTORATION M21 PARTIAL PLAN @ EXISTING BOOSTER BUILDING DISTRIBUTION HEADER ROOM C52 IRRIGATION DETAILS M22 SECTIONS R AND S C5 LANDSCAPE DETAILS M23 E EXISTING BOOSTER BUILDING - ACID/BASEQUIPMENT REMOVAL PLAN AND C54 MISCELLANEOUS DETAILS 1 OF 2 SECTION C55 MISCELLANEOUS DETAILS 2 OF 2 M24 EXISTING BOOSTER BUILDING - CHLORINATION EQUIPMENT MODIFICATION PLAN AND SECTIONS M25 FILTRATION BUILDING HVAC SCHEMATIC CONSTRUCTION RECORD DRAWING NOTICE These record drawings have been prepared based upon information contained in addenda, change orders, or other available construction information, and information provided by the Contractor, and by others. HDR has not verified the accuracy or completeness of the information provided to it and does not warrant the accuracy or completeness of these record drawings. Users of this information shall be solely responsible to verify any and all information represented herein prior to any such use of the information. SURVEYED: — SCALE: DESIGNED: A BRAWN: RE ONE INCH CHECKED: GP APPROVED: — AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY 9 VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATUM F M25.1 HVAC EQUIPMENT SCHEDULE M26 FILTRATION BUILDING HVAC PLAN M27 FILTRATION BUILDING WATER SUPPLY, WATER SYSTEM SCHEMATIC AND SAMPLE STATION DETAILS M28 FILTRATION BUILDING PLUMBING PLAN M29 PIPE SUPPORT DETAILS M30 FLOOR AND WALL PIPE PENETRATIONS M31 MECHANICAL DETAILS W=2953A3 W INSTRUMENTATION 11 P&ID LEGEND 12 WELL SUPPLY AND AERATION 13 GAC SYSTEM 14 MANGANESE FILTER SYSTEM 15 BACKWASH HANDLING SYSTEM, CHLORINE CONTACT CHAMBER 16 AERATION SYTEM, CLEARWELL AND HIGH LIFT PUMP SYSTEM 17 AIR SCOUR, FIRE ALARM, AND SECURITY ALARM SYSTEMS 18 HYPOCHLORITE STORAGE AND TRANSFER 19 HYPOCHLORITE METERING SYSTEM 110 FLUORIDE SYSTEM Ill POLYPHOSPHATE SYSTEM 112 WATER SAMPLE SYSTEM 113 SCADA BLOCK DIAGRAM 114 CONTROL PANEL 2 CABINET PRESENTATION 115 CONTROL PANEL 2 CABINET DETAILS 116 MODIFICATIONS TO EXISTING CONTROL PANEL 1 117 INSTRUMENTATION DETAILS ELECTRICAL E-1 ELECTRICAL ABBREVIATIONS AND SYMBOLS E-2 SINGLE LINE DIAGRAM L_-3 NEW TREATMENT FACILITY ELECTRICAL SITE PLAN E4 BUILDING POWER PLAN NO.1 E5 BUILDING POWER PLAN NO.2 E6 BUILDING LIGHTING PLAN NO.1 E7 BUILDING LIGHTING PLAN NO.2 E8 BUILDING SIGNAL PLAN NO.1 E9 BUILDING SIGNAL PLAN NO.2 E10 PANELBOARD SCHEDULES E11 FIXTURE, PANELBGARD AND CONDUIT/WIRE SCHEDULES Ell CONDUIT AND WIRE SCHEDULES E13 ELEMENTARY DIAGRAMS NO.1 El ELEMENTARY DIAGRAMS NO.2 El ELEMENTARY DIAGRAMS NO.3 E16 ELECTRICAL DETAILS NO. F17 ELECTRICAL DETAILS NO.2 E18 SWITCHBOARD-B AND MCC-NO.3 ELLEVATIONS E19 BOOSTER PUMP STATION - PARTIAL PLANS POWER AND SIGNAL E20 EXISTING SZ.5 SSRVS W/SAMMS WIRING DIAGRAM E21 EXISTING SZ.6 SSRVS -W/SAMMS WIRING DIAGRAM E22 EXISTING SZ.7 SSRVS W/SAMMS WIRING DIAGRAM E23 EXISTING SZ.8 SSRVS W/SAMMS WIRING DIAGRAM E24 WELL SECURITY SITE PLAN AND DETAILS a CONTACT PERSONNEL AGENCY NAME POSITION PHONE NO. CITY OF RENTON J.D. WILSON PROJECT MANAGER. (425)430-7245 CITY OF RENTON RAY SLED WATER MAINTENANCE SUPERVISOR (425)430-7400 CITY OF RENTON RON SHAFFER SEWER & STORM MAINTENANCE SUPERVISOR (425)430-7400 EES GREG PIERSON CONSULTANT PROJECT MANAGER (425)452-8100 KENNEDY/JENKS MILT LARSEN CONSULTANT PROJECT ENGINEER (253)874-0555 UTILITY CONTACT PERSONNEL UTILITY TYPE UTILITY NAME NAME PHONE NO. TELEPHONE QWEST FRANK FOREST (20c )345-2958 WATER CITY OF RENTON RAY SLED (425)430-7400 SEWER & STORM CITY OF RENTON RON SHAFFER (425)430-7400 ELECTRIC PUGET SOUND ENERGY MARK ENEBRAD (253)395-6954 GAS PUGET SOUND ENERGY DAVE JENESS (253)395-6858 F.ENTON FIRE DEPARTMENT 911 FIRST AID 911 F I Z_ Kennel /Jenks J Consultants(E 32001 32nd Ave. S., Suite 100 Federal Way, Washington 98001 ECONOMIC AND ENGINEERING SERVICES, INC.. 10900 NE 4TH STREET, SUITE 1110 BELLEVUE, WASHINGTON 98004 PORTLAND, OR / BELLEVUE, WA / KENNEWICK, WA / OLYMPIA, WA CITY OF RENTON Planning/Building/Public Works Dept. DATE: DULY, 2003 ROJECT N0. 8-01 -355 M AP LEWOOD WATER TREATMENT AND GOLF COURSE IMPROVEMENTS REVISION NO. 0 VICINITY MAP, LOCATION MAP AND DRAWING INDEX sHT N0. DWG NO. G 1 C H ► J K L M N W-2953AA�