Loading...
HomeMy WebLinkAboutWTR2702953.84A B C D H KL M N 0co P 2 —VC 2 —VC 2 -VC PIPE PENETRATION PPE PENETRATION SEE ARCH. DETAILS SEE ARCH. DETAILS 10 cal 1 —NaOCL RETURN TO DAY TANK 9 1 —NaOCL 9 TRANSFER LINE / _ r s= 2 —NaOCL OVERFLOW NaOCL TRANSFER �---- ----� TO HYPOCHLORITE V-791 ; „_ STORAGE TANKS ,,.--- -----� 1 NaOCL RETURN TO DAY TANK V-793 8 _ 1 1 /2 TO EW 741 8 1 1/2"—CARRIER EXISTING. TK-751ITK-7521 WATER FROM - WINDOWS 0 565 ZONE DAY TANK DAY TANK LG751 SIGHT GLASS , V-737 0 L-J T BFP-79 2 2 1 1 NaOCL HOSE SUPPLY I BIBB LINE 48 „ 1 2 POLY BACK- / BOARD SIGHT GLASS TK-751 F U DAY T U ANK � U 4 - 6 - „ S GHT GLASS. EX. : FD � 2_ TEE WITH 2 x 1 1/2„ L 51 BUSHING G7 „ „ „ _ _ AND 1 1 2 PW LINE TO EW 741 AND A 2 x 1 �— / BUSHING AND 1 PW LINE. TO BFP-782 �1CATCHMENT PAN M17 3 40 e , i V-737 ; t U U 5 - 5 SECTION N TAP .FOR... 1 /4 18 NPT PROCESS SCALE: 3 4 — — 0 M17 CONNECTION TO PRESSURE 5 TRANSMITTER (TYP. BOTH TANKS) NOTES CATCHMENT PA N 1 PROVIDE ALL PIPING VALVES AND ACCESSORIES. AS SHOWN ON SHEETS 18 M17 & 19 4 4 I 1 —NaOCL FROM PROVI DE .CALIBRATION. CHAMBERS WITH SCREWED TOP CLOSURES. DAY TANK 3 NEW OPENING IN WALL BETWEEN _ HYPOCHLORITE FEED AND WATER SUPPLY 2 _ NaOCL OVERFLOW ROOMS. BACK TO HYPOCHLORITE GENERAL NOTES STORAGE TANK S M 1. CONTRACTOR SHALL CONFORM 10 PIP 4 METERING PUMP SUPPORT SHELF. SEE DETAIL 2 SHT. M17 E ROUTING 8e ARRANGEMENT AS , CLOSELY AS POSSIBL E. NOT ALL PIPING VALVES FITTINGS AND 5 CHEMICAL PIPIN ACCESSORIES ARE SHOWN. PROVIDE ALL .PIPE VALVES AND ACCESSORIES STORAGE VAULT G CONTAINMENT CONDUIT RUNNING TO HYPOCHLORITE 3 AS SHOWN ON INSTRUMENTATION DRAWINGS EVEN .THOUGH NOT .SHOWN ON LT AND TO FILTRATION BUILDING. 3 THIS DRAWING. 1 2„ —SA 4 TOTAL ) 2. NOT USED. 3 4„NaOCI TOTAL) U E 2 T TO NEW TREATMENT MENT BUILDING 3. NOT USED. SECTION SCALE: ` 3 4 = —�M`17)- 1 0�4. DISASSEMBLY JOINT S OR FLANGE COUPLING ADAPTORS WITH :LIMIT RODS MAY BE ADDED WHER E DESIRED TO FACILITATE PIPING ASSEMBLY. CONSTRUCTION RECORD DRAWING NOTICE 3 _ The r 2 se record drawings have .been r 9 prepared -based upon CONTRACTOR NTRACTO R 2 5. TO ASSURE RIGHT POINT VENTS 8c DRAINS FOR HYDROSTATIC information contained in addenda change orders or TEST o g , ES .ARE ADDED.. AS NEEDED DURING CONSTRUCTION.W � other available construction information and. information o provided b the Contractor, and b others. HDR has not •� 2953F5 P Y � Y s verified the accuracyf or completeness n p to ess o the information r vi o ded to �t and does not warrant the accuracy or P y completeness of these record drawings. Users of this P g information o oration shall be solely responsible to verify any and O all information a o matron represented herein nor to an .such .use.. o P P Y of the information. of I SURVEYED: — SCALE. 3/4 —1 —0, t"RCITY ®F RENTON D E DESIGNED. AF VERTICAL. NAVD 1988 OCTOBER, 2003 Planning/Building/Public Works De t. E ECONOMIC AND ENGINEERINGP DRAWN. RB ONE INCH HORIZONTAL. NAD 1983/1991Kennedy/Jenks PROJECT NO. �— SERVICES, INC. CHECKED: GP 3-01-358 MAPLEW LO AT FULL SCALE ro CanSultantS(1) OOD APPROVED: 10900 N E 4TH STREET SUITE 1110 WATER TREATMENT AND GOLF COURSE IMPROVEMENTS REvlsloN No. 32001 32nd Ave. S. Suite 100 2 0 2 _RECORD DRAWINGS RB 1 /06' GP DATUM BELLEVUE WASHINGTON 98004 IF NOT ON INCH E C _ Federal Wa Washington 98001 1 ISSUED FOR CONSTRUCTION Y� 9 SHT N0. SS ED 0 CO ST UCTION RB: 10 03 AF PORTLAND OR `BELLEVUE WA KENNEWICK WA Y SECTIONS L N .. / SCALE ACCORDINGLY / / / oL MPIA, WA , W a Z THROUGH HYPOCHLORITE w N0. REVISION - BY -_DATE. APPR FEED AND WATER SUPPLY ROOMS DWG No. J _M 1 8.1 A B K L M N W-12C31531AJA A3 SCANNEL K a