HomeMy WebLinkAboutSWP2702959.35N CL T 0 W z r m a cl 0 C, 0 LD N N O F_ 0 J EROSION/SEDIMENTATION CONTROL NOTES 1. CONTRACTOR SHALL SUBMIT A STORMWATER POLLUTION PREVENTION PLAN (SWPP PLAN) PER THE CONTRACT SPECIFICATIONS. 2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION SHALL BE OBSERVED DURING CONSTRUCTION. 3. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES SHALL BE IN OPERATION PRIOR TO LAND CLEARING AND/OR OTHER CONSTRUCTION TO ENSURE THAT SEDIMENT LADEN WATER DOES; NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND /OR CONSTRUCTION IS COMPLETED AND THE POTENTIAL_ FOR ON —SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND AS UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE CONTRACTOR SHOULD ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE THE MINIMUM REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES AND THE WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 5. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND DISPOSING OF THE SEDIMENT. ALL CATCH BASINS, CONVEYANCE LINES AND DITCHES SHALL BE CLEANED PRIOR TO PAVING. 6. THE CONTRACTOR SHALL REMOVE MATERIAL DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO THE CITY RIGHT—OF—WAY OR INTO THE EXISTING STORM DRAINAGE SYSTEM. DEBRIS SHALL NOT BE WASHED INTO THE STORM DRAINAGE SYSTEM. 7. TEMPORARY EROSION CONTROL FACILITIES SHALL BE INSPECTED WEEKLY AND MAINTAINED WITHIN 24 HOURS FOLLOWING A STORM EVENT. SEDIMENT SHALL BE REMOVED TO INSURE THE FACILITIES WILL FUNCTION PROPERLY. THE FACILITIES SHALL BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON —SITE EROSION HAS PASSED. 8. DURING CONSTRUCTION, STORM DRAIN INLETS SHALL BE PROTECTED SO THAT STORMWATER RUNOFF SHALL NOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 9. FROM APRIL 1 TO SEPTEMBER 30, NO DISTURBED SOIL SHALL REMAIN UNSTABILIZED FOR MORE THAN SEVEN DAYS. FROM OCTOBER 1 TO MARCH 31, NO DISTURBED SOIL SHALL REMAIN UNSTABILIZED FOR MORE THAN TWO DAYS. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING FILL AND TOPSOIL MATERIAL FROM RAINFALL. FAILURE TO DO THIS MAY RESULT IN REMOVAL AND REPLACEMENT OF SATURATED MATERIAL AT NO COST TO THE OWNER. ANY COST ASSOCIATED WITH DELAY IN WORK CAUSED BY SUCH REMOVAL AND RE -PLACEMENT SHALL BE AT NO COST TO THE OWNER. 48" c0 M NOTES: 1. REMOVE CATCH BASIN GRATING. 2. CLEAN DIRT AND DEBRIS FROM GRATING LEDGE. 3. LAY THE CATCH BASIN INSERT INSIDE THE BASIN 4, REPLACE THE GRATING, PINCHING THE INSERT FABRIC BETWEEN THE GRATING AND THE CATCH BASIN FRAME. 5. CUT OFF THE EXCESS FABRIC OFF WITH A BLADE KNIFE. A 3 TO 5 INCH WIDE STRIP OF FABRIC SHOULD BE LEFT AROUND THE OUTSIDE OF THE GRATING IF THE INSERT IS TO BE USED MORE THAN ONCE. R 7**-- 'Os " 0rlV" 0 21oae o w'� `SIQNAL PLAN z FILTER FABRIC RETRIEVAL Q STRAP cn Cll FILTERED OVERFLOW TO BYPASS WATE PEAK STORM VOLUMES PROFILE FILTER FABRIC CATCH BASIN INSERT FOR SEDIMENT ONLY NOT TO SCALE X F', cl_n `L S . 7TH ST STATIONING LINE PROPOSED I 36" STORM I I CURB PIPE I I CONCRETE I -,- i 48" DIA. MANHOLE CATCH BASIN PER RENTON TYPE 1 L _ STANDARD DETAIL 4 B027. I LAWA CATCH BASIN TYPE 2 WITH FLAT TOP CENTER R STRUCTURE FROM CURB: ROUND LID SHALL BE LOCATED OUTSIDE OF � THE VEHICULAR WHEEL PATH WHERE FEASIBLE CENTER OF GRATE OR ROUND LID STRUCTURE SET AT CURB: VANED GRATE SHALL BE SET FLUSH WITH CURB FLOWLINE. ROUND LID SHALL BE LOCATED OUTSIDE OF THE VEHICULAR WHEEL PATH WHERE FEASIBLE Y 1 FACE OF CURB (FOC MEASURED FROM : OFFSET SHOWN STATIONING LINE TO ON FACE PLAN AND OF EXIST. PROFILE SHEETS, CURB. I NOTE: WHERE TYPE 1 CATCH BASIN IS NOT LOCATED IN A CURB FLOWLINE PERPENDICULAR TO THE STATION LINE, THE OFFSET MEASURES TO THE CENTER OF THE STRUCTURE. CONTRACTOR SHALL FIELD LOCATE FRAME & GRATE IN CURB FLOWLINE CATCH BASIN OFFSET DETAIL NOT TO SCALE CLEAN AND TACK EDGE OF EXISTING PAVEMENT WITH CSS1 MATCH EXISTING PAVEMENT SEAL JOINT WITH HOT PAVING ASPHALT (AR 4000W) AND APPLY SAND BLANKET. NEW ASPHALT CONCRETE CL "B" c C'` 66, r { FIRM AND UNYIELDING SUBGRADE CRUSHED SURFACING TOP COURSE. BUTT JOINT DETAIL NOT TO SCALE NEW 12" DIA. CPEP SD INVERT ELEV. VARIES SEE PLANS REMOVE AND WASTEHAUL EXIST. PIPE 8" 20"x24" OR 24" DIA. 12" (TYP.) ter f ` ,A41 - NO CONNECTION ALLOWED `Ov BETWEEN SPRING LINE AND 6" ABOVE EPDXY AREA. IF NECESSARY, FIELD ADJUST LATERAL STORM PIPE CONNECTIONS ONCE TEE TOP SET. NOTES: 1. CLASS 5000 CONCRETE GRAFT INTERFACE AREA TO BE CLEANED AND TREATED WITH BONDING AGENT. 2. SEE RENTON STANDARD DETAIL B019 FOR FRAME AND GRATE OR 8074 FOR RING AND COVER ASSEMBLIES. 3. EQUIP ACCESS RISER WITH STEPS PER CITY STANDARD DETAIL B 035. LOWEST STEP SHALL BE LOCATED 6" ABOVE BOTTOM OF VERTICAL ACCESS RISER SECTION. 5' MIN. 24" SD 5' MIN., TYP. t -f 51 PROFILE 4—Iry vrNr\ PLAN `STANDARD FRAME AND GRATE OR RING AND COVER AS NOTED PER PLANS RISER AND ADJUSTMENT SECTION FLAT SLAB COVER STEPS, SEE NOTE 3 EPDXY AREA & GRAFT WITH GUNITE MIX 60" DIA. CONCRETE PIPE 3—#6 ® SPRING LINE FULL LENGTH BOTH SIDES .n 60" DIA. CONCRETE PIPE TYPICAL TEE TOP ACCESS RISER NOT TO SCALE STANDARD FRAME AND COVER PER CITY DETAIL 8074 STANDARD TYPE 2 CATCH BASIN (48" DIA. SHOWN) PER CITY DETAIL B027 5' MIN. 24" SD FERNCO COUPLING OR APPROVED EQUAL (CONC OR CPEP) BOTH SIDES OF MH n :=;ZL,) y; FLOW z -E,rP N BEDDING PER CITY DETAIL B074 1MIN. 7 f As -T &I PffR CA vT#LAcT0f?.'S .R.�C-09IN �oS BED COUPLING AND--/ NEW CONC PIPE WITH CDF TYP. TYPE 2 CUT -IN CATCH BASIN grAI F• 1 /9"=1'-n" RECOMMENDED FOR APPROVAL $y`-------- �- Date'_,'' 1� - y'-----;--- A . $ Date $y`---------------- Date, -------- $y`---------------- Dater ------- EXPIRES: 7-12-2004 D 2 9 5 1326 — ,,. T,�,.,� �J'i`I�1.� � 08�I"ri�, Inc. CONSULTING ENGINEERS 701 DEXTER AVENUE NORTH SURE 200 SEATTLE, WASHINGION 98109 C206) 2s4-0860 SuRVElf : S.T. SC&L* VERTICAL NAD ruw >>aee HORIZONTAL � ��� DATUM '� �-CITY OF RENTON Planning/building/Public Works Dept. S.W. 7TH STREET DRAINAGE IMPROVEMENT PROJECT PHASE 2 - LIND AVE. SW. TO MORRIS AVE. S. DETAILS - TEMPORARY EROSION AND SEDIMENT CONTROL, MISCELLANEOUS DETAILS DATE 2/20/04 °�°"� M.W. SaDw": P� DRAWN' J.N. ONE krCN AT FULL SCAIX VF NOT ONE INCH SCALE ACCORDMlOt.Y ��` MA oRAw�Nc No: N0. REVISION 8Y DATE APPRAND ��K.E• SEEM OF: 26 27 2 s �;3 5 SCANNED MAY 0 1 Z006