EROSION/SEDIMENTATION CONTROL NOTES
1. CONTRACTOR SHALL SUBMIT A STORMWATER POLLUTION PREVENTION PLAN (SWPP PLAN) PER THE CONTRACT
SPECIFICATIONS.
2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION SHALL BE OBSERVED DURING CONSTRUCTION.
3. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES SHALL BE IN OPERATION PRIOR TO LAND CLEARING AND/OR
OTHER CONSTRUCTION TO ENSURE THAT SEDIMENT LADEN WATER DOES; NOT ENTER THE NATURAL DRAINAGE SYSTEM.
ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT
CLEARING AND /OR CONSTRUCTION IS COMPLETED AND THE POTENTIAL_ FOR ON —SITE EROSION HAS PASSED. THE
IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR.
4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM
REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND AS UNEXPECTED OR
SEASONAL CONDITIONS DICTATE, THE CONTRACTOR SHOULD ANTICIPATE THAT MORE EROSION AND SEDIMENTATION
CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING
THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS
ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND
ABOVE THE MINIMUM REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES AND THE WATER QUALITY
OF THE RECEIVING DRAINAGE SYSTEM.
5. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND DISPOSING OF THE SEDIMENT. ALL CATCH BASINS,
CONVEYANCE LINES AND DITCHES SHALL BE CLEANED PRIOR TO PAVING.
6. THE CONTRACTOR SHALL REMOVE MATERIAL DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO THE CITY
RIGHT—OF—WAY OR INTO THE EXISTING STORM DRAINAGE SYSTEM. DEBRIS SHALL NOT BE WASHED INTO THE STORM
DRAINAGE SYSTEM.
7. TEMPORARY EROSION CONTROL FACILITIES SHALL BE INSPECTED WEEKLY AND MAINTAINED WITHIN 24 HOURS FOLLOWING
A STORM EVENT. SEDIMENT SHALL BE REMOVED TO INSURE THE FACILITIES WILL FUNCTION PROPERLY. THE FACILITIES
SHALL BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON —SITE EROSION
HAS PASSED.
8. DURING CONSTRUCTION, STORM DRAIN INLETS SHALL BE PROTECTED SO THAT STORMWATER RUNOFF SHALL NOT ENTER
THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT.
9. FROM APRIL 1 TO SEPTEMBER 30, NO DISTURBED SOIL SHALL REMAIN UNSTABILIZED FOR MORE THAN SEVEN DAYS.
FROM OCTOBER 1 TO MARCH 31, NO DISTURBED SOIL SHALL REMAIN UNSTABILIZED FOR MORE THAN TWO DAYS.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING FILL AND TOPSOIL MATERIAL FROM RAINFALL. FAILURE TO DO
THIS MAY RESULT IN REMOVAL AND REPLACEMENT OF SATURATED MATERIAL AT NO COST TO THE OWNER. ANY COST
ASSOCIATED WITH DELAY IN WORK CAUSED BY SUCH REMOVAL AND RE -PLACEMENT SHALL BE AT NO COST TO THE OWNER.
48"
c0
M
NOTES:
1. REMOVE CATCH BASIN GRATING.
2. CLEAN DIRT AND DEBRIS FROM
GRATING LEDGE.
3. LAY THE CATCH BASIN INSERT
INSIDE THE BASIN
4, REPLACE THE GRATING,
PINCHING THE INSERT FABRIC
BETWEEN THE GRATING AND
THE CATCH BASIN FRAME.
5. CUT OFF THE EXCESS FABRIC
OFF WITH A BLADE KNIFE. A
3 TO 5 INCH WIDE STRIP OF
FABRIC SHOULD BE LEFT
AROUND THE OUTSIDE OF THE
GRATING IF THE INSERT IS TO
BE USED MORE THAN ONCE.
R 7**--
'Os " 0rlV"
0
21oae o w'�
`SIQNAL
PLAN z
FILTER FABRIC RETRIEVAL Q
STRAP cn
Cll
FILTERED OVERFLOW TO BYPASS
WATE PEAK STORM VOLUMES
PROFILE
FILTER FABRIC CATCH BASIN INSERT
FOR SEDIMENT ONLY
NOT TO SCALE
X F',
cl_n `L
S . 7TH ST
STATIONING LINE
PROPOSED I
36" STORM I I
CURB
PIPE I I CONCRETE
I
-,- i 48" DIA. MANHOLE
CATCH BASIN PER RENTON
TYPE 1 L _ STANDARD DETAIL
4 B027.
I LAWA
CATCH BASIN
TYPE 2 WITH
FLAT TOP
CENTER R STRUCTURE
FROM CURB: ROUND LID SHALL BE LOCATED OUTSIDE OF
� THE VEHICULAR WHEEL PATH WHERE FEASIBLE
CENTER OF GRATE OR ROUND LID STRUCTURE SET AT CURB:
VANED GRATE SHALL BE SET FLUSH WITH CURB FLOWLINE.
ROUND LID SHALL BE LOCATED OUTSIDE OF THE VEHICULAR
WHEEL PATH WHERE FEASIBLE
Y 1
FACE OF CURB (FOC
MEASURED FROM
: OFFSET SHOWN
STATIONING LINE TO
ON
FACE
PLAN AND
OF EXIST.
PROFILE SHEETS,
CURB.
I
NOTE:
WHERE TYPE 1 CATCH BASIN IS NOT LOCATED IN A CURB FLOWLINE
PERPENDICULAR TO THE STATION LINE, THE OFFSET MEASURES TO
THE CENTER OF THE STRUCTURE. CONTRACTOR SHALL FIELD LOCATE
FRAME & GRATE IN CURB FLOWLINE
CATCH BASIN OFFSET DETAIL
NOT TO SCALE
CLEAN AND TACK EDGE OF
EXISTING PAVEMENT WITH CSS1
MATCH EXISTING PAVEMENT
SEAL JOINT WITH HOT PAVING
ASPHALT (AR 4000W) AND
APPLY SAND BLANKET.
NEW ASPHALT CONCRETE CL "B"
c C'`
66, r {
FIRM AND UNYIELDING
SUBGRADE
CRUSHED SURFACING TOP COURSE.
BUTT JOINT DETAIL
NOT TO SCALE
NEW 12" DIA. CPEP SD
INVERT ELEV. VARIES
SEE PLANS
REMOVE AND
WASTEHAUL EXIST. PIPE
8"
20"x24" OR
24" DIA.
12" (TYP.)
ter f ` ,A41
-
NO CONNECTION ALLOWED `Ov
BETWEEN SPRING LINE
AND 6" ABOVE EPDXY
AREA. IF NECESSARY,
FIELD ADJUST LATERAL
STORM PIPE CONNECTIONS
ONCE TEE TOP SET.
NOTES:
1. CLASS 5000 CONCRETE
GRAFT INTERFACE AREA
TO BE CLEANED AND
TREATED WITH BONDING
AGENT.
2. SEE RENTON STANDARD
DETAIL B019 FOR FRAME
AND GRATE OR 8074 FOR
RING AND COVER
ASSEMBLIES.
3. EQUIP ACCESS RISER
WITH STEPS PER CITY
STANDARD DETAIL B 035.
LOWEST STEP SHALL BE
LOCATED 6" ABOVE
BOTTOM OF VERTICAL
ACCESS RISER SECTION.
5' MIN. 24" SD
5' MIN., TYP.
t -f
51
PROFILE
4—Iry vrNr\
PLAN
`STANDARD FRAME
AND GRATE OR RING
AND COVER AS
NOTED PER PLANS
RISER AND
ADJUSTMENT SECTION
FLAT SLAB COVER
STEPS, SEE NOTE 3
EPDXY AREA &
GRAFT WITH GUNITE
MIX
60" DIA. CONCRETE
PIPE
3—#6 ® SPRING LINE FULL
LENGTH BOTH SIDES
.n
60" DIA. CONCRETE
PIPE
TYPICAL TEE TOP ACCESS RISER
NOT TO SCALE
STANDARD FRAME AND COVER
PER CITY DETAIL 8074
STANDARD TYPE 2 CATCH
BASIN (48" DIA. SHOWN) PER
CITY DETAIL B027
5' MIN. 24" SD
FERNCO COUPLING OR APPROVED
EQUAL (CONC OR CPEP) BOTH SIDES
OF MH
n :=;ZL,) y;
FLOW
z
-E,rP N BEDDING PER CITY DETAIL B074
1MIN. 7 f As -T &I PffR CA vT#LAcT0f?.'S .R.�C-09IN �oS
BED COUPLING AND--/
NEW CONC PIPE WITH
CDF TYP. TYPE 2 CUT -IN CATCH BASIN
grAI F• 1 /9"=1'-n"
RECOMMENDED FOR APPROVAL
$y`-------- �- Date'_,'' 1� -
y'-----;--- A .
$ Date
$y`---------------- Date, --------
$y`---------------- Dater -------
EXPIRES: 7-12-2004
D
2
9
5
1326
—
,,.
T,�,.,�
�J'i`I�1.� � 08�I"ri�, Inc.
CONSULTING ENGINEERS
701 DEXTER AVENUE NORTH SURE 200
SEATTLE, WASHINGION 98109 C206) 2s4-0860
SuRVElf :
S.T.
SC&L*
VERTICAL
NAD ruw >>aee
HORIZONTAL � ���
DATUM
'� �-CITY OF
RENTON
Planning/building/Public Works Dept.
S.W. 7TH STREET DRAINAGE IMPROVEMENT PROJECT
PHASE 2 - LIND AVE. SW. TO MORRIS AVE. S.
DETAILS - TEMPORARY EROSION AND SEDIMENT CONTROL,
MISCELLANEOUS DETAILS
DATE
2/20/04
°�°"�
M.W.
SaDw":
P�
DRAWN'
J.N.
ONE krCN
AT FULL SCAIX
VF NOT ONE INCH
SCALE ACCORDMlOt.Y
��`