Loading...
HomeMy WebLinkAboutWWP2702986.2SEC.23, T.23 N., R.5 E., W.M. O O 2 F— d' LO FQ-- N W Z J 2 U H Q O LO N LO H N W Z J 2 U Q NOTE: 1) HORIZONTAL POSITION OF CASING PIPE IS SHOWING ON S-33 & S-34. IN CASE OF CONFLICT WITH MANHOLE LOCATIONS SHOWN ON SEWER PLAN, ADJUST LOCATION OF SEWER MANHOLES TO MATCH CASING PIPE. 2) DEBEAD INTERIOR OF BUTT FUSION WELDED HDPE PIPE. 40 - -- - - - - - — - --- . - - - - - - -- --- - --- - -I -- - - - - --- - - - - -- - -- -- - - - 40 39 39 ST STA. 1 +177.0 BILTMENT OBSERVATION PORT BOTTOM ELEV. OF CASING PIPE 34.45 24 x24 TEE W/ SSMH 2 1500mm DIA. BLIND FLANGE, S/S BOLTS = 38 — -- - - -- -- STA. 1 +167.0, 1.1 m RT - -- -- - -- IE-20" HDPE _- 34.505 - - - --COORDINATE W/ CROSS FRAMES - 38 TOP EL = 36.005 SEE NOTE ** IE = 34-4l 0T)34.16 34.36 I E = 3;-� 6 BOTTOM ELEV. 37 37 OF 24" CASING PIPE _ - -_ - -- - - 22.0m, 508mm O.D. HDPE _SEE - ON -5 ice- - - - SANITARY SEWER IN SSMH 1, 1200mm IA. i STA. 1 +123.0, 1.1 m RT� O CASING PIPE SIMILAR TO 36 O DETAIL ON SEW-6 IE OP E�QQ 29 30 5.076 36 'I SINI --- --- 149.Om_50$mm O.D. HDPE SANITARY SEWER IN 610'mm CA— --- — — — _-- LO _ _ — --- N 35 35 - -- _ - - - - - --- - - - - li - - -- - - `n -- - - - ------------ ---- - - - - - - - - --- --- --- - �_ -- - - — — — — SLOPE Ca? 0.46% �� 1?-' 34 -- -- - - - 34 THIS DIFIED ET N O \�P�� S REFLECTE ONS�RUCT0N0 33 RECORDS. APRIL 2006 33 z- - --- BIKE/ - - 4' li FED V) _ * TUNNEL 0 o * 5.Om rx W U 6.7 m 6.4l g°l0 32 Q -(22') (16.5) (21 ') - -- - - - �``\' - ® 1,� 0 - - -- -- - - - -_ J 32 N1 E T R 1 C NOTE. DIMENSIONS WITH "*" IN VICINITY S�0 100 YR. FLOOD EL. 31.9 - — = MERIDIAN o m OF BIKE TUNNEL WERE MEASURED I I W.S.P.C.S � ' AT TIME OF INSTALLATION. NORTH ZONE, METER - 31 - - -- -- - -- - ---- -- - - - �- - - --- - -- Q 31 ELEVATIONS AT ABUTMENTS 1 -- - - - - - & 3 ARE DESIGN VALUES & WERE NOT MEASURED DURING OR AFTER DATUM CCNc CONSTRUCTION. 30 30 X - - - o 28.4m a- J U - - - - -- - - - -- - --- _ 29 CENTER UNDER TUNNEL - NAD 83/91 o "- 19.Om 10mm CA INS �m CALL 2 WORKING DAYS BEFORE YOU DIG QilTRANSITION COUPLING - -- - - -- - --- - - -- 28 28 - - - -- ---- -- -- - - - - -- --- - - --- - - 1-800-424-5555 w 1 125 1 150 1 175 1 +200 1 +225 (UNDERGROUND UTILITY LOCATIONS ARE APPROX.) FIELD BOOK: FED. AID No. BRS—M 171 (001) NMI) KING COUNTY DEPT. OF TRANSPORTATION SEW-2 SURVEYED: tip' �CA HAROLD TANIGUCHI, DIRECTOR SURVEY BASE MAP: Penhallegon Associates K I<Aill PROJECT No. 401288 - ELLIOTT BRIDGE 3166 SHEET 147 DESIGN ENTERED: FOTES 2002 Consulting Engineers, Inc. •=�C�� Ill23-23-5-23 ` OF 800 FIFTH AVENUE SURVEY No. so7a DESIGNED VANDERBURG 2002 Eng nee-ing Punning Surveying SUITE 3800 �,A��'ISTSS� BRIDGE REPLACEMENT PROJECT 159 SHEETS 1601 end Avenue, Suite 1000 SEATTLE, WASHINGTON GOTZ 2003 CHECKED: Seethe, WA 98101 98104-3122 `sIONAL 'v (zos) 44 -ass-800-945-8408 TEL 206.340.2255 w311-25 (147) ww.paceengrs.com FAX: 206.340.2266 MAINTENANCE DIVISION No. 4 IXES PIR4 4 SEWER DATE REVISION BY DATE Kirkland-seattle-Federal Way -Portland c r �c mx C x o a o� z� A?)� -, .7xFt+lnh` 9- C A NiNll ®:� l' 2 7 2006