HomeMy WebLinkAboutSWP2702988.5c
E
U
01
i
N
N
Q
pl
d
3
00
00
N
04
I
IL
41
z
w
J
L
CID
l
0)
—
�—
N
30'
N
i
U)
00
D
,N N
k �
0
N
S
c�
n
v I
CsI SD
CD
O
U
D
r�-
m
I D �
A
i
v I
j
II
r
D
z
SD
\C /
SSMH (NOT FOUND)
RIM=40.88±
IE 8" N=36.5t
BLDG. # 724
2 STORY MASONARY
FIN FLOOR— 41.0
W/ NO APPAIRENT
BASEMENT
-T-
CB RIM=40.80
IE 3"PVC E/W=40.0
BLDG. # 229 & 231
2 STORY MASONARY
FIN FLOOR # 231=40.9
FIN FLOOR # 229-41.1
W/ NO APPARENT
BASEMENT
NOTES
1. ALL MANHOLE FRAMES AND COVERS, AND CATCHBASIN FRAMES
AND GRATES SHALL BE LOCKING.
N01"28'20"E 2656.29' CALC.
2. CB LOCATIONS MAY BE ADJUSTED TO AVOID CONFLICTS.
CURB CB'S MAY BE REVISED TO OPEN CURB FACE INLETS
OR VERTICAL CURB INLETS.
ALL ADJUSTMENTS REQUIRE CITY APPROVAL.
WILLIAMS AVE. S* 3. WELLS AVE S, WILLIAMS AVE S, S 2ND ST.
MAY HAVE 6 TO 13 INCH THICK CONC. PAVEMENT AND / OR
6 TO 9 INCHES BRICK UNDER THE ASPHALT.
4. CONTRACTOR SHALL COORDINATE WITH SEATTLE PUBLIC UTILITIES WHEN WORKING
NEAR SEATTLE WATER MAIN IN S 2ND STREET. CONTACT SPU 48 HOURS BEFORE
CB RIM=41.12 BEGINNING CONSTRUCTION WITHIN 20 FEET OF SEATTLE WATER MAIN FOR SPU
IE 3"PVC E/W=40.3� PROVIDED INSPECTION. CONTACT LAKE YOUNGS OFFICE AT (425) 255-2242.
CB RIM=40.80 SPU SHALL BE GIVEN ADVANCE WARNING PRIOR TO THE CONTRACTOR EXPOSING SPU
/_IE 3"PVC E/W=40.0 SSMH RIM=41.25 WATER PIPE TO ALLOW SPU THE OPPORTUNITY TO INSPECT THE PIPES CONDITION.
C CHFAN NHS=35.4
BLDG. # 225 CB RIM=41.21
CAUTION 3 STORY CONC BLD= N IE 3"PVC E=41.4
ACCESS TO FIN FLOOR 41.3
UNDERGROUND 12" HIGH PRESSURE No BASEMENT BUT soMF CAUTION ASP"A
VAULT GAS MAIN UGT AND FIBER OPTIC CONDUITS, CB RIM=41.08
# 8"CONC TO SDMH UGT AT NEW 225 \ CABLE VAULTS POSSIBLY ENCASED, POTHOLE
IE 3"PVC E/S=40.3
\ ALONG ENTIRE BLOCK
STORM PIPE
CONC. WALK
8' DEC
CB-13B
-.. UGP B D E�UGP -�; rI f `.EP -UGP I m 6„DEC. ❑ -- _. - -
ASPHA: T
BLDG# 201
2 STORY CONC, BLOCK
FIN FLOOR=40.9
NO BASEMENT
CB RIM=40.83 -
IE 3"PVC E/S=40.0
r
0
D
/1
it ! II SSMH RI ^ 40.8, , CL CH- 3.7
I
POTHOLE
I I / CCB O20AT
I � � CB—B En �
SURVEYED: SCALE:
ORIGINAL SEALED 3/15/2005 HORIZONTAL, NAVID
CENTRAL BUSINESS DISTRICT
HORIZONTAL NAD 1983/7991 �� _ CITY O E 3/ 1 4/ 0 5
FIELDBOOK:
RECORD D RAW I N G DESIGNED: 1 —20 •. '
DC
BY LYS L. HORNSBY �, RENTON UTILITY REPLACEMENT PAGE:
RECORD INFORMATION PROVIDED BY SURVEY DRAwN:
3 AS —BUILT: Revised CB Locations per survey, updated DWC 3-31-14 DWC DC ONE INCH X DRAWING No:
23169 AND OTHER INFORMATION PROVIDED BY CONTRACTOR elevations redraw profiles, removed old info, other 4. eanup c anges. CHECKED: Dept.STORM SEWER REPLACEMMENT D —
AT FULL SCALE ' Planning/Building/Public Works
IF NOT ONE INCH-
N0. REVISION BY DATE APPR APPROVED: SCALE ACCORDINGLY SHEET: OF:
WILLIAMS AVE S 13RD TO S 2ND) 5 12
D-2988D2
f
G
S
❑
U
T
m
W
z
m
z
z
m
J)
b
�C)
r�
>
CD
>�r
�z
CD
0
r
z
0�0
D
T
O
❑
m
❑
p
-Doc
A
D�
Q
Z