Loading...
HomeMy WebLinkAboutWTR2703005.3'. R U CTU RAL NOTES . l.`__NERAL 1.1 !_lILDING CODE: ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION SHALL (�)NFORM TO THE DRAWINGS, SPECIFICATIONS, AND THE UNIFORM BUILDING CODE (UBC), 1997 EDITION. SEISMIC REHABILITATION OF THE STRUCTURES ARE DESIGNED PER UBC CHAPTER 34 AND FEMA 356, PRESTANDARD AND COMMENTARY FOR THE SEISMIC REHABILITATION OF BUILDINGS. I.- STANDARDS: REFERENCE TO ASTM AND OTHER STANDARDS SHALL MEAN THE LATEST EDITION IN EFFECT ON THE BID DATE OR DATE OF THE OWNER - CONTRACTOR AGREEMENT, UNLESS NOTED IN THESE DOCUMENTS OR DESIGNATED BY THE GOVERNING CODE. 1.3 LOADS AND CRITERIA GRAVITY: IN ADDITION TO THE DEAD LOADS, WATER IS ASSUMED TO BE STORED AT 100% OF THE TANK CAPACITY. SLOSHING EFFECTS OF THE STORED WATER IS CONSIDERED IN THE SEISMIC DESIGN. SEISMIC: SEISMIC FORCES ARE DETERMINED USING NON -LINEAR TIME HISTORY ANALYSES FOR GROUND MOTIONS WITH A 10% AND 2% CHANCE OF EXCEEDANCE IN 50 YEARS. SITE SPECIFIC RECORDS WERE DERIVED FROM THE FOLLOWING TIME HISTORIES: 1971 CHILE, 1971 FOLSOM DAM, 2001 NISQUALLY THE STURCTURES ARE DESIGNED TO MEET THE FOLLOWING ENHANCED REHABILITATION OBJECTIVES. - EARTHQUAKE HAZARD LEVEL PERFORMANCE LEVEL 10%/50-YEAR IMMEDIATE OCCUPANCY (10) 2%/50-YEAR COLLAPSE PREVENTION (CP) WIND: WIND BASE SHEAR PER UBC METHOD 2, PROJECTED AREA METHOD. - BASIC WIND SPEED = 80 MPH, EXPOSURE C IMPORTANCE FACTOR, Iw = 1.15 1.4 SHOP DRAWINGS AND SUBMITTALS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW PRIOR TO FABRICATION OR CONSTRUCTION OF THESE ITEMS: STRUCTURAL STEEL PASSIVE ENERGY DISSIPATION DEVICES (FRICTION DAMPERS) CONTRACTOR SHALL REVIEW & STAMP SHOP DRAWINGS PRIOR TO SUBMITTAL. IF SHOP DRAWINGS DIFFER FROM THE DESIGN SHOWN ON THE STRUCTURAL DRAWINGS, THEY SHALL BE SEALED BY THE WASHINGTON STATE REGISTERED PROFESSIONAL ENGINEER RESPONSIBLE FOR THE DESIGN. DIMENSIONS AND QUANTITIES ARE THE CONTRACTOR'S RESPONSIBILITY AND WILL NOT BE REVIEWED. CONTRACTOR SHALL BE LIABLE FOR ALL MATERIALS PLACED PRIOR TO RECEIPT OF REVIEWED SHOP DRAWINGS OR SUBMITTALS FROM THE ENGINEER. CONTRACTOR SHALL ALLOW A MINIMUM OF 15 WORKING DAYS FOR REVIEW BY ENGINEER. 1.5 DEFERRED SUBMITTALS: DRAWINGS FOR BIDDER -DESIGNED COMPONENTS, SEALED BY THE WASHINGTON STATE REGISTERED PROFESSIONAL ENGINEER RESPONSIBLE FOR THE DESIGN, SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW FOR GENERAL CONFORMANCE WITH THE DESIGN OF THE STRUCTURE. SUBMITTALS OF BIDDER -DESIGNED ITEMS SHALL INCLUDE LOCATIONS, MAGNITUDES AND DIRECTIONS OF ALL FORCES TRANSFERRED TO THE STRUCTURE. CALCULATIONS SUBMITTED FOR BIDDER -DESIGNED ITEMS ARE FOR INFORMATION ONLY AND WILL NOT BE APPROVED OR RETURNED. .6 SPECIAL INSPECTION PER UBC SECTIONS 1701 & 1703, SHALL BE PERFORMED BY A TESTING AGENCY APPROVED BY THE BUILDING OFFICIAL, AS OUTLINED IN THE STRUCTURAL INSPECTION SCHEDULE. CONTRACTOR SHALL PROVIDE SCAFFOLDING OR LIFT AND OPERATOR FOR USE BY THE SPECIAL INSPECTOR. 1.7 STRUCTURAL OBSERVATION: REID MIDDLETON, INC. WILL PERFORM PERIODIC OBSERVATION DURING CONSTRUCTION, INCLUDING TESTING VERIFICATION OF PROTOTYPE TESTS AND OBSERVATION OF DAMPER FABRICATION AND INSTALLATION. 1.8 EXISTING CONDITIONS: CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS, MEMBER SIZES, AND CONDITIONS PRIOR TO COMMENCING ANY WORK. ALL DIMENSIONS OF EXISTING CONSTRUCTION SHOWN ON THE DRAWINGS ARE INTENDED AS GUIDELINES ONLY AND MUST BE FIELD VERIFIED. EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED EITHER ON SITE OBSERVATIONS, ORIGINAL DRAWINGS, OR WERE ASSUMED BASED ON EXPECTED CONDITIONS. IF EXISTING CONDITIONS DO NOT CLOSELY MATCH THE CONDITIONS SHOWN ON THE DRAWINGS, OR IF EXISTING MATERIALS ARE OF QUESTIONABLE OR SUBSTANDARD QUALITY, NOTIFY ENGINEER PRIOR TO COMMENCING ANY WORK. 1.9 CONTRACTOR -INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE ENGINEER FOR APPROVAL PRIOR TO FABRICATION & CONSTRUCTION. CHANGES SHOWN ON SHOP DRAWINGS OR SUBMITTALS ONLY SHALL NOT SATISFY THIS REQUIREMENT. RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED BASED ON INFORMATION SUBMITTED, IN PART, BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THE ENGINEER IS NOT RESPONSIBLE FOR ITS ACCURACY, OR FOR ERRORS OR OMISSIONS WHICH MAY HAVE BEEN II'llRATED INTO THIS DOCUMENT AS A RESULT. i --------- ---- - ov rip • 2 -er►1' GENERAL (CONT) 1.10 CONTRACTOR RESPONSIBILITIES: THE DRAWINGS REPRESENI THE DESIGN OF THE STRUCTURE IN COMPLETED FORM, CON- RACTOR SI IAI I BE RESPONSIBLE FOR METHODS, SEQUENCES AND SAFETY PRECAUTIONS I\'I (.)UIRED TO PERFORM THE WORK. CONTRACTOR SHALL PROVIDE f EMI'ORARY SHORING AND BRACING OF ALL STRUCTURAL MEMBERS, EXISTIN(_; < ()N`;TRUCTION, AND SOIL EXCAVATION AS REQUIRED. SHORING AND BRACING !BALL NOT BE REMOVED UNTIL ALL FINAL CONNECTIONS HAVE BEEN C:0MI'Lf=TED IN ACCORDANCE WITH THE DRAWINGS AND MATERIALS HAVE A(_- IIEVED DESIGN STRENGTH. 1.11 DISCREPANCIES: IN CASE OF DISCREPANCIES BETWEEN IIII_ DRAWINGS, SPECIFICATIONS, REFERENCE STANDARDS, AND GOVERNIN(., (,ODE, THE MORE STRINGENT REQUIREMENTS SHALL GOVERN. CONTRAC 101*" `_)HALL NOTIFY THE ENGINEER OF DISCREPANCIES AND OBTAIN DIRECTION TO PROCEEDING WITH ANY WORK INVOLVED. NOTES ON INDIVIDUAL DRAWINGS SHALL TAKE PRIORITY OVER STRUCTURAL NOTES ON ]III') `11EET. NOTED DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMEN`=)ION' �. DO NOT SCALE DRAWINGS. 1.12 SPECIFICATIONS: REFER TO THE SPECIFICATIONS FOR ADI-AIIONAL INFORMATION 1.13 LADDERS, STAIRS, PLATFORMS AND RAILINGS SHALL COMPl ( WI-II-1 THE REQUIREMENTS OF THE WASHINGTON ADMINISTRATIVE CODE CHAPTER 296-24, WAC PART J-1 AND THE LATEST REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) PARTS 1910 AND 1926. GEOTECHNICAL 2.1 GEOTECHNICAL DESIGN CRITERIA WERE PROVIDED IN THE IOLLOWING REPORTS AND MEMORANDA BY GEOENGINEERS, INC.: 1. REPORT, SEISMIC ENGINEERING SERVICES ANALY`,I'� OF ELEVATED WATER STORAGE TANKS, RENTON, WASHINGTON, `>EPI 21, 2001. 2. MEMO, CITY OF RENTON, ELEVATED WATER S IORA(=;E TANKS, RECOMMENDED FOUNDATION SPRINGS FOR NON- I.INf:AR ANALYSES, MARCH 25, 2002. 3. MEMO, CITY OF RENTON, ELEVAI-ED WATER S (ORAGE TANKS, FEMA 356 RESPONSE SPECTRA AND TIME HISTORII::>, APRIL 25, 2002. TEMPORARY BRACING, SEQUENCING, AND LIMITATIONS 3.1 WATER STORAGE: PRIOR TO REMOVING ANY STRUCTURAL MEMBER OR MATERIAL, THE WATER STORAGE IN THE TANK SHALL BE 60% FULL MAXIMUM. CONTRACTOR SHALL NOTIFY CITY 5 WORKING DAYS PRIOR TO COMMENCEMENT OF WORK. CONTRACTOR SHALL PROCEED ONLY AFTER NOIIFIE:D BY CITY THAT TANK IS 60% FULL MAXIMUM. WATER DRAINED FROM RI `,I_RVOIR WILL BE DECHLORINATED BY CITY PRIOR TO DISCHARGE TO STORM DRAIN SYSTEM. 3.2 SEQUENCING_: WORK SHALL BE PERFORMED ONE BAY AT A TIME. WORK IN A BAY SHALL BE COMPLETED, EXCEPT FOR FINAL X-BRACE I ENSIONING, BEFORE COMMENCING WORK IN THE NEXT BAY. FINAL X- I BRACE TENSIONING SHALL BE CONDUCTED IN A SIMILAR SEQUENCE. 3.3 TEMPORARY SHORING: TEMPORARY BRACING AND SHORINC, DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR PRIOR TO CONSTRUCII()N. DRAWINGS SHALL BE SEALED AND SIGNED BY A WASHINGTON S-IAIE: PL-GISIEKED PROFESSIONAL ENGINEER AND PROVIDED TO THE ENGINEI R PRIOR TO CONSTRUCTION. TEMPORARY BRACING SCHEMES MAY INCI. UDE GUY WIRES FROM EACH LEVEL OF THE STRUCTURE TO THE GROUND OR TEMPORARY BRACING WITHIN THE STRUCTURE LOCATED TO AVOID INII I,"FERENCE WITH NEW MEMBERS, DAMPERS, CASINGS, AND GUSSET PLATES. BRACING DRAWINGS SHALL FULLY CONSIDER THE ACTUAL CONSTRUCTION SEQUENCE USED BY THE CONTRACTOR. ALL TEMPORARY BRACING CONNECTIONS, I X(_j-_PT THOSE EXISTING, SHALL BE REMOVED, GROUND FLUSH TO THL ' dDUCT URAL MEMBER SURFACE, AND PAINTED AT THE END OF CONSTRUCTION. I I_ MPORARY BRACING CONNECTIONS SHALL NOT DAMAGE THE MEMBER SURFACI 3.4 FINAL BRACE TENSIONING: REMOVAL OF X-BRACING SLACK. CAUSED BY TANK REFILLING IS REQUIRED. THIS MAY BE ACCOMPLISHED [3Y I HE USE OF THE ERECTION RODS AND BRACKETS SHOWN ON THESE DRAWINGS. THE BRACING SHALL BE TAUT AND STRAIGHT AFTER TANK REFILLING. ALL ENLCTION RODS & BRACKETS SHALL BE GIVEN TO THE CITY AT THE END (_)E- CONSTRUCTION. 3.5 WELD REPAIR: REPAIR OF EXISTING WELDS SHALL BE ACC OMPUSHED USING A METHOD THAT MINIMIZES HEAT AND r OUCING OF THE HASE METAL. CONTRACTOR SHALL SUBMIT WELD REPAIR PROCEDURES AND MATERIAL CERTIFICATIONS TO ENGINEER FOR APPROVAL PRIOR TO (.'OMMENCEMENT OF WORK. 3.6 EXISTING ITEMS: EXISTING MECHANICAL, ELECTRICAL, PLUMI SING, AND ARCHITECTURAL OBJECTS ARE NOT TYPICALLY SHOWN ON THESE DRAWINGS, WORK SHALL INCLUDE REMOVAL & REPLACEMENT OF AL[ VISIBLE OR KNOWN MECHANICAL, ELECTRRCAL, PLUMBING, AND ARCHITECTURAI ITEMS 13ACK TO THEIR ORIGINAL CONDITION WHERE NEEDED TO ACCESS ARID PERFORM THE WORK. 3.7 EMERGENCY TANK REFILL: IF THE CITY IS REQUIRED TO THE TANK ON AN EMERGENCY BASIS, WORK IS TO PROCEED UNDER 1111 DIRECTION OF THE CITY. N0. RECORD DRAWING BID SET REVISION STEEL 4.1 REFERENCE STANDARDS: STRUCTURAL STEEL SHALL CONFORM TO ALL REQUIREMENTS OF THE FOLLOWING DOCUMENTS, EXCEPT AS MODIFIED BELOW: AISC "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS" * AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES" AWS D1.1 "STRUCTURAL WELDING CODE - STEEL" RCSC "SPECIFICATION FOR STRUCTURAL JOINTS USING A325 OR A490 BOLTS" * EXCEPTION: FIRST SENTENCE OF SECTION 1.8.2 SHALL BE DELETED. 4.2 STEEL MATERIALS: WIDE FLANGES . . . . . . . . . ASTM A992 GRADE 50 PLATES, CHANNELS, ANGLES . . ASTM A36 TYP, ASTM A572 GR 50, OR AS NOTED STRUCTURAL TUBES . . . . . . ASTM A500 GRADE B STEEL PIPES . . . . . . . . . . ASTM A53 GRADE B STRUCTURAL BOLTS . . . . . . ASTM A325-N (UNLESS NOTED OTHERWISE) THREADED RODS . . . . . . . . ASTM A36 4.3 BOLTED CONNECTIONS SHALL BE TYPE N WITH FULLY PRETENSIONED BOLTS PER AISC STANDARDS UNLESS NOTED OTHERWISE. PRETENSIONED OR SLIP - CRITICAL CONNECTIONS SHALL USE LOAD INDICATING WASHERS OR TENSION CONTROL BOLTS. CONNECTION PLATES SHALL HAVE AISC STANDARD ROUND HOLES UNLESS NOTED OTHERWISE. 4.4 WELDING: ALL WELDS SHALL CONFORM TO AMERICAN WELDING SOCIETY (AWS) D1 .1, "2000 STRUCTURAL WELDING CODE - STEEL", AND AWS D1.3, "2000 STRUCTURAL WELDING CODE - SHEET STEEL". WELDS SHALL BE MADE USING LOW -HYDROGEN ELECTRODES WITH A MINIMUM TENSILE STRENGTH OF 70 KSI. ONLY AWS PREQUALIFIED WELDS SHALL BE USED. SHOP DRAWINGS SHALL SHOW ALL WELDING WITH AWS A2.4 STANDARD SYMBOLS. WELDS SHOWN ON DRAWINGS ARE MINIMUM SIZES. INCREASE WELD SIZE TO AWS MINIMUM SIZES BASED ON MATERIAL THICKNESSES. MINIMUM WELD SIZE SHALL BE 3/16 INCH. WELDS SHOWN ON DRAWINGS ARE FOR FINAL CONNECTIONS. UNLESS FIELD WELD SYMBOLS ARE SHOWN, THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING IF A WELD SHOULD BE SHOP OR FIELD WELDED IN ORDER TO FACILITATE STEEL ERECTION. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL JOINT PREPARATIONS AND WELDING PROCEDURES INCLUDING: ROOT OPENINGS AND FACE DIMENSIONS, GROOVE ANGLES, BACKING BARS, COPES, TAPERS, AND SURFACE ROUGHNESS. 4.5 WELDER CERTIFICATION: AWS OR WASHINGTON ASSOCIATION OF BUILDING OFFICIALS (WABO). ENERGY DISSIPATION DEVICES 5.1 FRICTION DAMPERS: THE SEISMIC RETROFIT SYSTEM INCORPORATES THE USE OF ENERGY DISSIPATION FRICTION DAMPERS IN THE STRUCTURAL DESIGN. REFER TO SPECIFICATIONS FOR DESIGN, MANUFACTURING, PERFORMANCE, AND TESTING REQUIREMENTS OF FRICTION DAMPERS. ENERGY DISSIPATION DEVICES (CONT) 5.2 FRICTION DAMPER MANUFACTURER SHALL PROVIDE ALL CONNECTIONS, SHOP DRAWINGS AND CALCULATIONS TO ENGINEER FOR REVIEW PRIOR TO FABRICATION OF THESE ITEMS. 5.3 INSTALLATION OF FRICTION DAMPERS SHALL BE BY THE GENERAL CONTRACTOR. 5.4 PRETENSIONING: ALL STEEL BRACING SHALL BE SUFFICIENTLY PRETENSIONED TO AVOID LATERAL VIBRATION. PRETENSIONING MAY BE ACCOMPLISHED BY THE USE OF THE ERECTION RODS AND BRACKETS SHOWN ON THESE DRAWINGS. INITIAL INSTALLATION OF THE DEVICES SHALL OCCUR WITH THE 1-1/4" DIAMETER BOLTS POSITIONED AT THE FAR SIDE OF THE SLOTTED 1101_ES TO FACILITATE FUTURE BRACE TIGHTENING AFTER REFILLING THE TANK. AFTER TANK REFILLING, PRETENSION SHALL AGAIN BE USED TO REMOVE SLACK AND SAG FROM THE BRACES. 5.5 CONTACT SURFACES OF BOLTED CONNECTIONS SHALL BE COATED WITH INORGANIC ZINC RICH PAINT. 5.6 ASPECT RATIO OF FRICTION DAMPERS SHALL VARY TO SUIT THE ASPECT RATIO OF BRACED BAYS. 5.7 SLIP FORCE AND FYTFNSlOI\k DAMPER SLIP FORCE AND EXTENSION SHALL BE AS SHOWN ON COORDINATION 6.1 WITH CITY DEPARTMENT OF UTILITIES: CONTRACTOR SHALL PROVIDE 5 WORKING DAYS NOTICE TO THE CITY WHEN TANK IS READY TO BE LOWERED TO THE SPECIFIED MAXIMUM. 1. CITY CONTACT: TOM MALPHRUS, TELEPHONE (425) 430-7234. 2. CITY TO ADIVSE CONTRACTOR WHEN TANK WILL BE DRAINED. 3. CITY MAY HAVE TO REFILL TANK FOR A SHORT PERIOD OF TIME DURING THE COURSE OF THIS WORK. CITY WILL ADVISE CONTRACTOR WHEN TANK WILL BE FILLED ABOVE THE SPECIFIED MAXIMUM. CONTRACTOR SHALL NOT PERFORM ANY WELDING ON TANK SUPPORT COLUMNS WHILE TANK IS FILLED ABOVE THE SPECIFIED MAXIMUM. 6.2 WITH WIRELESS SERVICE PROVIDERS: CONTRACTOR SHALL NOTIFY ONSITE WIRELESS SERVICE PROVIDERS OF PROPOSED POWER OUTAGES AT LEAST 5 WORKING DAYS IN ADVANCE. CONTRACTOR SHALL COOPERATE WITH WIRELESS SERVICE PROVIDERS WHEN A CONFLICT OR RELOCATION IS REQUIRED. THE FOLLOWING IS A LIST OF CONTACTS: 1. CINGULAR INTERACTIVE (BELL SOUTH): BOB CLIATT, (425) 210-5449 2. SPRINT PCS: JASON SEARS, (425) 825-6200 3. QWEST WIRELESS: AARON DOWNING, (425) 652-0929 4. T MOBILE: KEN BELLEFEUILLE, (360) 540-5776 (CELL) 5. XM SATELLITE RADIO: LORA KEATING, (202) 380-4000 STRUCTURAL INSPECTION SCHEDULE ITEM HIGH -STRENGTH BOLTS, NUTS, AND WASHERS MATERIAL CI PI REFERENCE UBC STANDARD -- REF X ASTM AS NOTED HIGH -STRENGTH BOLTING: BEARING TYPE CONNECTIONS X SLIP -CRITICAL CONNECTIONS X X STRUCTURAL STEEL MATERIALS WELD FILLER MATERIALS WELDING: CP & PP GROOVE WELDS X MULTI -PASS FILLET WELDS X SINGLE PASS FILLET WELDS> 5/1 6" X SINGLE PASS FILLET WELDS<5/16" X RAILINGS X FRAMING FABRICATION & ERECTION X AISC LRFD M2.5 1701.5.6 ASTM A6 A568 AS NOTED AISC LRFD A3.5 AWS D 1 .1 1701 .5.5 AISC LRFD M2.7 INSPECTION SCHEDULE NOTES: 1. ITEMS MARKED WITH AN 'Y' REQUIRE INSPECTION BY A SPECIAL INSPECTOR. 2. Cl = CONTINUOUS INSPECTION DURING PROGRESS OF WORK BY SPECIAL INSPECTOR. 3. PI - PERIODIC INSPECTION AS REQUIRED TO CONFIRM CONFORMANCE OF WORK. 4. SUBMIT TESTING/INSPECTION REPORTS TO THE ENGINEER, BUILDING OFFICIAL, AND CONTRACTOR. SURVEYED: DESIGNED: KKY KKY 8/19/03 DRAWN. GPM KKY 10/l/021 CHECKED: DBS BY DATE I APPR APPRovm: D Iv1ARK�, IvIANUFAC I URLN CERTIFICATION OF COMPLIANCE ID MARKS, MANUFACTURERS CERTIFICATION MILL TEST REPORTS ID MARKS, MANUFACTURERS CERTIFICATION OF COMPLIANCE W4wv300v50v3 SCALE: NAVD 1985 63/1 RFNTON ELEVATED WATER TANKS NONE W+D 1963/1991 �� CITY OF HORIZONTAL: - " E ` RENTON S'EI,SMIC REPAIR AND REHABILITATION �ONE INCH I C` y T FlJLL� '� - � Planning/Building/Public Works Dept. GENERAL STRUCTURAL URtiL NOTES IF NOT ONE INCH SCALE ACCORDINGLY wl SCAN(VED{TAR w9 - rr ;' ;' w"'co fo, __� DATE: 8/19/03 FIELDBOOK: PAGE: GO.2 18 0 r r z c� x r b x c� CD �x o � �W z o Id ITI 00 N m ICIO o C