Loading...
HomeMy WebLinkAboutWTR2703064.4M \� Iz �— M Y o U wo o w a 3 < cn � a o W I z IL O CL I-— CL w J � w Ld w U Q G 0 z :LLJ V) Ld O m z 0 U 1 I w 0 0 0 LJ O Z z p• F— Z W Z O O z ID aQ 0 1�3 0 w w > Z �� Z 3 Y O w nLLn_ lnn�L n Q w 0 u Z O cn w ry O Z W T'Ap -ti— to c� z ti Vf X W TESTING DETAIL 4. a CT TAPPING TEE (MJxFL) TAPPING GATE VALVE (FL XMJ) TEMPORARY PLUG (MJ) WITH 2—INCH TAP AND 2—INCH BLOW —OFF ASSEMBLY CONCRETE BLOCKING """HIA CHRYSLER DODGE JEEP - RENTON PORTION OF SW 1/4, SW 1/4 OF SECTION 18, TWP. 23 N., RGE. 5 E., W.M. CITY OF RENTON, KING COUNTY, WASHINGTON W z oc W Q C- z FINAL CONNECTION DETAIL to X W I NEW D.I. WATER LINE VERTICAL CROSS(MJxFL) FOR POLYPIGGING 1—BLIND FLANGE ON TOP WITH 2" TAP AND 2" PLUG 1—BLIND FLANGE ON BOTTOM 1—PLUG(MJ) WITH 2"TAP do 2" BLOW —OFF TEMPORARY BLOCK NOTES: 1. TAPPING TEES SHALL BE MADE OF DUCTILE IRON OR EPDXY — COATED STEEL. 2. NO SIZE ON SIZE TAPS ON CAST—IRON WATER LINES. TAP SHALL BE AT LEAST 2" SMALLER DIAMETER THAN THE EXISTING MAIN. 3. NO WET TAP ON ASBESTOS CEMENT LINE OR STEEL LINE 4. WET —TAP SHALL BE DONE ONLY BY CITY —APPROVED CONTRACTORS 5. CONTRACTOR SHALL POTHOLE AND VERIFY THE HORIZONTAL AND VERTICAL ALIGNMENT OF EXISTING LINE OR STUB AND SHALL START LAYING THE NEW LINE AT THE SAME HORIZONTAL AND VERTICAL ALIGNMENT OF THE EXISTING STUB. CITY FORCES WILL PERFORM THE FINAL CONNECTION FROM THE WATER LINE TO THE TAPPING VALVE WITH D.I. SLEEVE AND D.I. SPOOL NEW D.I. WATER LINE AFTER ALL CLEANING BY POLYPIG, PRESSURE TESTING AND DISINFECTION, REMOVE TEMPORAY BLOCK & BLOW —OFF AND CONNECT TO VALVE WITH D.I. SLEEVE (MJ) do D.I. SPOOLS FINAL CONNECTION BY CITY FORCES WATER CONNECTION DETAIL WET TAP TO EXISTING WATER MAIN NOT TO SCALE 3 FT MIN. COVER (10—INCH DIAMETER AND UNDER) 4 FT MIN. COVER (12—INCH DIAMETER AND OVER) \ NEW WATER MAIN POLY PIG z cijO >z Q= W Q Z 'Q Z 0 00 Z cr TEMPORARY 2" GALVANIZED PIPE AND 2" GATE VALVE INSTALL 2" P`UG ON TOP BLIND FLANGE AFTER REMOVAL OF POLYPIG A A A WA VERTICAL CROSS FOR POLYPIGGING STATION: ' SIZE OF VERTICAL CROSS SHALL BE THE SAME AS SIZE OF MAIN LINE VERTICAL CROSS (MJ X FL) ONE BLIND FLANGE ON TOP OF CROSS WITH 2" TAP & 2" TEMPORARY BLOW —OFF ASSEMBLY (REMOVE BLOW —OFF ASSEMBLY AND INSTALL 2" PLUG AFTER REMOVAL OF CLEANING "POLY —PIG") ONE BLIND FLANGE ON BOTTOM OF CROSS ONE PLUG (MJ) ON END OF CROSS CONCRETE BLOCKING ALL DEBRIS AND POLYPIGS SHALL BE REMOVED FROM SUMP OF VORTICAL CROSS BEFORE DISINFECTION OF NEW WATER MAIN WATER MAIN POLYPIGGING STATION �VERTICAL C �ROS S �FO�RPOLYPIGGING CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555 NOT TO SCALE RECOMMENDED FOR APPROVAL BY BY BY CHECKED FOR COMPLIANCE l T .CITY STANDARDS DATE D 'ate DATE DATE �� of wAsy, G 23467 Cv �SSIONAL EXPIRES 0 / 27 / m3 REUSE OF DOCUIIIENIS THIS DOCUMENT HAS BEEN 9GNED ELECTROMCALLY IN ACCORDANCE WITH WAC 196-23-070 AND CHAPTER 19.34 RCW. UNAUTHORIZED ALTERATION OF ANY OF THE INFORMATION ON THIS DOCUMENT WILL INVALIDATE THE DOCUMENT, MY CERTIFICATION AND SIGNATURE, THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF AEIL AND IS NOT TO U USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF AHBL. u u z O W I OL W W W 0 O 0 W U) Ir 7C U Q J _jv) < of �ILL! H z U�1.lL J � o- af W > ( Of W Ld Jz44-- 4 %� — z Uw E 0 M � O O m 3 3 Q oE r � N O � M �o oN N] v a0 z_ a CITY OF RENTON DEPARTMENT OF PUBLIC WORKS UTILITY NOTES & DETAILS C3.4 1 REVISIONS PER CITY COMMENTS WJF 5/13/03 DESIGNED: WJF 2 REVISIONS PER CITY COMMENTS WJF 6/16/03 DRAWN: JEA CHECKED: DSG NO. REVISION BY APPR. DATE APPROVED: DATE: 03-20-2003 SCALE: NTS FILE NAME: 202399-C33 PAD ISOM PAGE - SHEET: 11 OF: 11 0 �T® V/ /0) c J N N O z m O J m I r x a c� �c id o � C) ' N o, v d �y T4 �o z O z Q'a am111ce7m Cr PuaL= WOWS SCANNED NOV - 7 Z003