TEMP. APPROACH EL. 110
I /
0
0
Ln
un
w /
Z / N _,�8 00
_36- - LAKE
WA SHING TON
\TEMF�APPR6CH EL. tA0 - - -36 - -
36
t
24-
-12 -12 2
0
16.
/ / i l �� 19 : • :. ... , . \\�\ �� \ N g4' 25 26 E_--- //
:..:. :\\\\\ \ - \ OUTER ARBOR LINE - - N 18�55�0
/ / / / .: /::� :: :. • :..: •.ram: =: -- � PRa � :. \� \
28
� / / / // /• .....:-. • ... _ �. . TAMP, - . . I
. \. I
�\
�2 20.:;� DRIED NOTE 4
DR /
. . . . .: �\ \\ LIMIT'EL. 14.0
0
0
0
Oi
Ln
w
— - 44
0 1000' 2000' 3000' 4000' 5000'
FLIGHT PATH PROFILE AT CEDAR RIVER DELTA
VERTICAL SCALE: 1" = 50'
HORIZONTAL SCALE: 1" = 500'
Ld
\ I I : I . ::.I.: I :. :...:...:..:..:..:.::..:: EXISTING I r— EXISTING -2.¢
\ \\� l :.: APPkFt0A04 :EL•: 80 .:I I \ LOG, BOOM TRAIL ON
\ /
��•�::�::•�:•�:•:�':•••••�::••• :•�� /�--•_::.:.•:.•:.•: :� III � \ PILING
�20 / // - 12 i I cn co r12� $// /1'L'/p' o
1\ o 116/-N 186,000
8 I + J o _ / / D.N.R. PROPEF�TY
. . �; 0� _ L$ 25 - J EXISTING ORD NA
�.:. .::. .. • ... .. N — E H ;R,,B��� — 77 -�/ HIGH WATER LINE _
:::::. �.: •. :. ; :..:.: l I — I -'r�[ EL. 22.0
/ I
_ _ _ _ 1 -
8 . . :r. ' . \ \ / \ - - —_ �\ i N 1.85 978.93
12 16 _ i v o ::: : �--_�- \ E 1,660,078.01 I
ii U
�IaW_j
M11<a.V)W
1
0 W.M.D. I D.P.T.
Rev.# By Checked
RUNWAY
II
A H EL_701 —
BRIDGE 1 / s
��� �-- / FACE OF
—1 1 EXISTING - —i6 - 1 1
EXISTING
N 185.703.24
E 1,658,473.18
CEDAR
RIVER
6-30-92 ISSUED FOR BID
Date Revision Description
TEMP. AP
BOAT HOUSE
O
1�
CITY OF 1
RENTON 1 1
CEDAR RIVER 1
TRAIL PARK 1
1
ACH EL. 60 1
11
111 = BULKHEAD/ICU
1
-
I
DRAINAGE FACILITIES TO BE
— — EXTENDED - SEE DWG.__PH1�4
\/ 26
Designed J.D.R
Scale 1"=100'
i
NORTHWEST, INC.
Engineers and Scientists
Drawn W.m.D. Checked D.P.T. Proj. Mgr. J.D.R.
(Unless noted otherwise) Date 6-15-92
Original Drawing 22" x 34" O.A.
V • - �_a,,s,,
OY WAS
� = z
13826
�GISTE4�
�SIONAL
EXPIRES 6-10-93
FUTURE
EXPANSION
N 185,500
r
CITY OF RENTON
RENTON, WASHINGTON
CEDAR RIVER DELTA PROJECT
NOTES:
1. EL. 0 = MEAN SEA LEVEL
2. CONTOURS ® EL. 4 AND ABOVE REPRESENT
DATA OBTAINED 1 /29/92 FROM GEOPHYSICAL
SURVEYS. CONTOURS ® EL. 0 AND BELOW
REPRESENT DATA OBTAINED 3/5/92 VIA
GROUND SURVEY.
3.• CONTOUR INTERVAL 4 FT. BELOW EL. 12;
AS NOTED ABOVE EL. 12.
4. CONTRACTOR TO FURNISH, INSTALL, MAINTAIN
AND REMOVE SILT BARRIER AT THE DELTA
DREDGING AND BOEING FILL SITE DURING
ALL DREDGING AND FILL OPERATIONS.
SILT BARRIERS SHALL EXTEND FROM THE
WATER SURFACE TO A DEPTH OF 10' MINIMUM
OR THE BOTTOM OF THE LAKE. SEE SPECS.
Contract No.
SITE PLAN 494
BOEING FACILITIES & p,aW;n9 No Rev.
SURROUNDING AREA PH1-1 0
�