Loading...
HomeMy WebLinkAboutSWP2703080.20 R �= o 0 w � MlaZ)w � TEMP. APPROACH EL. 110 I / 0 0 Ln un w / Z / N _,�8 00 _36- - LAKE WA SHING TON \TEMF�APPR6CH EL. tA0 - - -36 - - 36 t 24- -12 -12 2 0 16. / / i l �� 19 : • :. ... , . \\�\ �� \ N g4' 25 26 E_--- // :..:. :\\\\\ \ - \ OUTER ARBOR LINE - - N 18�55�0 / / / / .: /::� :: :. • :..: •.ram: =: -- � PRa � :. \� \ 28 � / / / // /• .....:-. • ... _ �. . TAMP, - . . I . \. I �\ �2 20.:;� DRIED NOTE 4 DR / . . . . .: �\ \\ LIMIT'EL. 14.0 0 0 0 Oi Ln w — - 44 0 1000' 2000' 3000' 4000' 5000' FLIGHT PATH PROFILE AT CEDAR RIVER DELTA VERTICAL SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 500' Ld \ I I : I . ::.I.: I :. :...:...:..:..:..:.::..:: EXISTING I r— EXISTING -2.¢ \ \\� l :.: APPkFt0A04 :EL•: 80 .:I I \ LOG, BOOM TRAIL ON \ / ��•�::�::•�:•�:•:�':•••••�::••• :•�� /�--•_::.:.•:.•:.•: :� III � \ PILING �20 / // - 12 i I cn co r12� $// /1'L'/p' o 1\ o 116/-N 186,000 8 I + J o _ / / D.N.R. PROPEF�TY . . �; 0� _ L$ 25 - J EXISTING ORD NA �.:. .::. .. • ... .. N — E H ;R,,B��� — 77 -�/ HIGH WATER LINE _ :::::. �.: •. :. ; :..:.: l I — I -'r�[ EL. 22.0 / I _ _ _ _ 1 - 8 . . :r. ' . \ \ / \ - - —_ �\ i N 1.85 978.93 12 16 _ i v o ::: : �--_�- \ E 1,660,078.01 I ii U �IaW_j M11<a.V)W 1 0 W.M.D. I D.P.T. Rev.# By Checked RUNWAY II A H EL_701 — BRIDGE 1 / s ��� �-- / FACE OF —1 1 EXISTING - —i6 - 1 1 EXISTING N 185.703.24 E 1,658,473.18 CEDAR RIVER 6-30-92 ISSUED FOR BID Date Revision Description TEMP. AP BOAT HOUSE O 1� CITY OF 1 RENTON 1 1 CEDAR RIVER 1 TRAIL PARK 1 1 ACH EL. 60 1 11 111 = BULKHEAD/ICU 1 - I DRAINAGE FACILITIES TO BE — — EXTENDED - SEE DWG.__PH1�4 \/ 26 Designed J.D.R Scale 1"=100' i NORTHWEST, INC. Engineers and Scientists Drawn W.m.D. Checked D.P.T. Proj. Mgr. J.D.R. (Unless noted otherwise) Date 6-15-92 Original Drawing 22" x 34" O.A. V • - �_a,,s,, OY WAS � = z 13826 �GISTE4� �SIONAL EXPIRES 6-10-93 FUTURE EXPANSION N 185,500 r CITY OF RENTON RENTON, WASHINGTON CEDAR RIVER DELTA PROJECT NOTES: 1. EL. 0 = MEAN SEA LEVEL 2. CONTOURS ® EL. 4 AND ABOVE REPRESENT DATA OBTAINED 1 /29/92 FROM GEOPHYSICAL SURVEYS. CONTOURS ® EL. 0 AND BELOW REPRESENT DATA OBTAINED 3/5/92 VIA GROUND SURVEY. 3.• CONTOUR INTERVAL 4 FT. BELOW EL. 12; AS NOTED ABOVE EL. 12. 4. CONTRACTOR TO FURNISH, INSTALL, MAINTAIN AND REMOVE SILT BARRIER AT THE DELTA DREDGING AND BOEING FILL SITE DURING ALL DREDGING AND FILL OPERATIONS. SILT BARRIERS SHALL EXTEND FROM THE WATER SURFACE TO A DEPTH OF 10' MINIMUM OR THE BOTTOM OF THE LAKE. SEE SPECS. Contract No. SITE PLAN 494 BOEING FACILITIES & p,aW;n9 No Rev. SURROUNDING AREA PH1-1 0 � V1 x m IzI o a N o -h � z O ao O C� L) ^ SD .