Loading...
HomeMy WebLinkAboutWTR2703142.1V N SHEET c� SHEET 5 INS W R---27---3142 TALBOT HILL WATER MAIN REPLACEMENT PHASE 1-MARCH 2O04 (COMPLFTED SEPTEMBER 2004) SHEET 9 SHEET WM- SHE'S 119 12, 13 ARE DETAL $HEEM 0 PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT VICINITY MAP SHEET INDEX SHEET 1: COVER SHEET SHEET 2: DAVIS AVE S. TO S.19TH ST. (STA. 0+00 TO STA. 4+00) SHEET 3: DAVIS AVE S. TO S.19TH ST. (STA. 4+00 TO STA. 9+25) SHEET 4: DAVIS AVE S. TO S.19TH ST. (STA. 9+25 TO STA. 15+25) SHEET 5: S.19TH ST. TO MORRIS AVE S. (STA. 15+25 TO STA.19+75) SHEET 6: MORRIS AVE S. TO S.17TH ST. (STA. 19 + 75 TO STA. 25+00) SHEET 7: MORRIS AVE S. TO S.15TH ST. (STA. 25+00 TO STA. 30+00) SHEET 8: S.15TH ST. TO SMITHERS AVE S. (STA. 30+00 TO STA. 36+25) SHEET 9: S.15TH ST. TO SR515 (STA. 36+25 TO STA. 41+00) SHEET 10: SR 515 TO TALBOT RD. S. (STA. 41+00 TO STA. 44+13) SHEET 11: CONNECTION DETAILS SHEET 12: CONSTRUCTION DETAILS SHEET 13: STANDARD DETAILS SHEET 14: S.16TH ST. TO TALBOT RD. S. (STA. 0+00 TO STA. 4+48) W-3I4?OI HORIZONTAL DATUM : CITY OF RENTON SURVEY CONTROL NETWORK (NAD 1983/91) REFERENCE MONUMENTS USED : MONUMENT NUMBER 476 AND MONUMENT NUMBER 659 AS IDENTIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT DOCUMENT. PROJECT SITE MAP VERTICAL DATUM : CITY OF RENTON SURVEY CONTROL NETWORK (NAD 1988) REFERENCE MONUMENTS USED 659, ELEVATION 85.48' AS IDENTIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT DOCUMENT. • � • -�a • it '�r,.� WATER UTILITY WASTEWATER UTILITY CITY OF RENTON DDPI'1JAMI '1' Oi' Pul=c w MIam WTR-27-3142 TALBOT HILL WATER MAIN REPLACEMENT PHASE 1 (AS —BUILT) UTILITY MAINTENANCE FIRE MARSHAL I I AS —BUILT INFORMATION PROVIDED 1 1 1 �m R L M Oat 1/15/04 ME wM D W-3142 cCD 0 0 l\ R, N w:* - s7 - lo** a p�®t AG !�'�M' r� STORM WATER UTILITY TRANSPORTATION N& 1l111M011 K MV& OW MWWA t _ _ 1 OR 14 1413; w -,?/�'z ° � SCANNED OCT 0 8 �.m"