Loading...
HomeMy WebLinkAboutWTR2703142.11N EX. 6" G.V SOUTH 15TH STREET STA. 21+40, RT. 13.5' d. TO BE REMOVED 8"x6" TEE (MJxFL) O �- W/ FINAL CONNECTION 40" COVER NEW 6 DI LENGTH TO FIT 6" GV (FLxMJ) O CY) SOUTH 15TH STREET TOP OF PIPE EX. 6" GV CONCRETE BLOCK z INSERT 8" POLY PIG NSTA. TS REMAINS IN SERVICE 21 +40, RT. 23' m PRIOR TO INSTALLATION (n s"ciw »Iw ® s"ciw FIRE HYDRANT ASSEMBLY D OF 8" PLUG (MJ) STA. 21 +30, RT. 25' CB 00 RIM 176.34 � � � �„ 90' BEND ) IE 174.8 (12"C N) � ' 1 0 STA. 21 +30 RT. 33 (MJxMJ STA: 0+ 13 LT. 13 '� , 8" VERT. CROSS (MJxFL) STA: ®0-7, LT. 15 c, WATER CAP ETIE4IN IE 175.1 (10-PVC S) -0 , 2 8" BLIND FLANGES 8 x8 TEE (FLxFL) �n DEAD -MAN BLOCK 6'O SPOOL PIECE K () STA. 20+90, 4"cr w PER DETAIL 6 ROMAC ADAPTER (DI -CI) ONE W/ 2" TAP & 2" P G � �� _ (3) 8 GV (FLxMJ) RT. 8 8 " CONCRETE BLOCK (4) J"SHACKLE RODS 8'" CONCRETE D (MJxMJ) --��. S. 1 8TH ST. S ° 1 8TH ST. (1) 8" PLUG (MJ) W/ 2" TAP (2) 8"x6" REDUCER (PExMJ) 4"Cl W CK AND 2 PLUG INSERT 8 POLY PIG FROM VERT. CROSS 2" TEMP. . A PRIOR TO INSTALLATION (2) 6„ DI SPOOL PIECE TO TEE STA. 21 +15, RT. 13.5' \,—STA. 21 +23, RT. 25' ' TEMP. CON RETE BLOCK OF 8" PLUG (MJ) (2) 6 ROMAC ADAPTER (DI -CI) (f� ) � a x �� 8" 45' BEND (MJxMJ) n » » , � n 17 (4) �" SHACKLE RODS 16 width CONCRETE BLOCK 8 xs TEE (MJxMJ) FROM DEADMAN TO 90' concrete duct bank 8" PLUG MJ W STA: 0+28, LT. 10' G - L. ntoe: AND 2" PLUG / 2 TAP BEND DEADMAN BLOCK 01 C) �'1 notched out top 4" (4) J" SHACKLE RODS `0 (2) 8" SPOOL PIECE of concrete duct bank W/ 2" TEMP. B.O. ASSEMBLY FROM DEADMAN TO 0 W/ 8 LONG BODY SLEEVE under 6" g.v. NOTE: CONCRETE BLOCKS VERT. CROSS MAINTAIN 6" VERT. STA. 21 +23, RT. 13.5' SEPARATION WITH NOTE: EXISTING UTILITIES 8"x8" TEE (MJxFL) » MAINTAIN 6" MIN. VERT. (TYPICAL) GV (FLxMJ) 88 SPOOL PIECE W/ EX. UTILITIES (TYPICAL) CONCRETE BLOCK TESTING CONNECTION DETAIL 1 FINAL TIE—IN CONNECTION DETAIL 1 TESTING CONNECTION DETAIL 6 FINAL TIE—IN CONNECTION DETAI6 2 INSTALLED 7_20_04 Q00/ INSTALLEDED ON 8-10-04 KO DEAD -MAN BLOCK 8" 90' BEND (MJxMJ) 00 PER DETAIL CONCRETE BLOCKS (4) SHACKLE RODS (J} 3 CUT & CAP EX. FROM 8" 90' BEND = 4 » Q z � 4 WATER AFTER STA. 24+ 12 RT. 27 n .1 TIE-IN CONNECTION ' rz STA. 14+43 LT. 44' � TO DEAD -MAN 8 x6 TEE (MJxFL) � m INSERT 8 POLY PIG 8"x8" TEE (FLxFL) (' ) C, > STA. 14+43, LT. 60' 6" GV (FLxMJ) '� STA. 24+22, RT. 40' (3) 8" GV (FLxMJ)8„x8 TEE MJxMJ --' 8"x8" 90' BEND (MJxMJ) CONCRETE BLOCK — 00 PRIOR TO INSTALLATION " �_ CONCRETE BLOCK 8 GV (FLxMJ) STA. »13+30, RT. 38 ih CONCRETE BLOCK , U) _ -�TAl. 2 4 1 4 8, R+. 48, 8 x4 TEE(MJxMJ) " �, C 8" GV (MJxMJ) 8 x4 TEE (MJxMJ) STA. 24+29, RT. 27 v OF 8 PLUG (MJ) (f) CONCRETE BLOCKS 3 8 SPOOL PIECE �� � 8 SPOOL PIECE � 4 90' BEND (MJxMJ) » CONCRETE BLOCK 8 PLUG (MJ) �L » FIRE HYDRANT ASSMBLY -o STA. 24+29, RT. 52.5 CONCRETE BLOCK 8 TEMP. PLUG CONCRETE BLOCKS CUT & CAP EX. 8 WATER D o ce 8 , CB AFTER TIE-IN CONNECTION SSMH C C 4" SPOOL PIECE RIM 163.21 m DEAD —MAN BLOCK < 4" ROMAC ADAPER =o » STA. 13+38, RT. 42 RIM 143.52 (TYPICAL) IE 155.8 (8"c N & S) PER DETAIL REM 143.52 i� D 4" 90' BEND (MJxMJ) ( f E 1 140.9 (8»C s) C (4) J" SHACKLE RODS DEAD —MAN BLOCK CONCRETE BLOCK 8" SPOOL PIECE STA. 24+17, RT. 10' 4" (j) FROM 8"x4" TEE TO (2)" SHACKLE RODS 'A 4" SPOOL PIECEto 3 FT. T.O P. rn 8" LONG BODY SLEEVE °17 FROM DEADMAN TO .� r, ��� D" "� �`� '� '� 4" ROMAC ADAPTER o ( ) J" 8" GV MJxMJ _ Ci w ° DEAD -MAN NEW 8 DI U) s"ci w 4 SHACKLE RODS 4"ci w VERT. CROSS U) (MJxMJ) i° g"C� • (DI -CI) (TO BE NDONED) FROM 8% 8" TEE TO -7 — o6 4' 39' DEAD -MAN STA. 24+ 15, RT. 10' S • 1 ! TH ST• , 39' 6 STA. 14+53 RT. 21' (2) SHACKLE ROD BE ABANDONED r 6 5 6 FROM ROMAC , STA. 24+ 15, RT. 40' s"CI w DEAD -MAN BLOCK 1o"c 1 » 8"C 8" TEE (MJxFL) .��}_i 4 2T2,� lT.�,ei Um -I - TO DEAD -MAN ' 8" GV FLxMJ " (FLxMJ) 8 x4 TEE MJxMJ 1 a"c 1 �� "C - CUT &CAP EX. 4" CI ��`�" :CONCRETE BLOCK " ( ) �� AFTER TIE-IN CONNECTION 20"GAS (3» BELOW NEW WATER MAIN) 8 PLUG (MJ) W/ 2 TAP & 00 1 (TYPICAL) NOTE: 2" PLUG W/ 2" TEMP. S. 1 7TH ST. 8" VERT. CROSS MJxFL 2"GAS 1" ABOVE NEW WATER MAIN " ) 3: 20»GAS w 54' COVER s MAINTAIN 6 VERT. B.O. ASSEMBLY (2) 8" BLIND FLANGE I 4' SEPARATION WITH „ „ 2"GAS w% 38" COVER 2 SDMH 4 CONCRETE BLOCKS (1) W/ 2 TAP AND 2 PLUG , RIM 140.42 EXISTING UTILITIES STA. 14+4 LT. 1 STA. 14+52, LT. 14 IE 130.6 (12"C NE) cB 3 (4) SHACKLE RODS {1) 8" PLUG (MJ) W/ 2" " " 4 RIM 143.58 (TYPICAL) „ » » TEMP. B.O. ASSEMBLY 8 90' B ND (MJxMJ) 8 x8 TEE (MJxFL) IE 137.2 (6"C E} - FROM 8 TEE TO 8 x4 TEE CONCR E BLOCK IE 137.0 (6"C E) IE 141.7 (8"c NW) TEMP. CONCRETE BLOCK / CONCRETE (FLxMJ) �E 130,5 130.0 (12" c w} (4} "SHACKLE RODS cT^ , 54, + + � TESTING CONNECTION D ETA I 7TIE—IN00 " " FROM 8"x4" TEE TO 8 ROMAC ADAPTER sDMH INS RT 8" POLY PIG 8 PLUG (MJ) �OL,L�_ DEAD —MAN (DI —CI) 6 I N STA LLE D E D 0 N 8 —10 — 0 4 kllu RIM 140.42 P' SEE CONNECTION DETAIL\J IE 130.6 (12"C NE) CB POOR TO INSTALLATION lAl " TCAAD D (l ACCC\IOI V IE 137.2 (6"C E) j RIM 143.58 -OF 8" PLUG (MJ) !� r�,.r.r+..nr-Tr of (lnii S®UTI--� 19TH STREET - IE 141.7 8»c NW) ,,,�,_•��.� 8x6" TEE MJxMJ E 137.0 (6»C E} ( 2 8 PLUG (MJ) 'E 130.5 (12"C E7 SOUTH 19TH STREET NOTE: " IE 130.0 (12»C w MAINTAIN 6" MIN. VERT. CONCRETE BLOCKS CLEARANCE W/ EX. UTILITIES (2) J" SHACKLE RODS V) (TYPICAL) ( *FROM TEE TO TEE STA. 31 +70, LT. 20' W TESTING CONNECTION DETAILS 2 3 4 FINAL TIE—IN CONNECTION DETAILS 2 3 4 INSERT 8" TEE (FLxFL) �' LI• J 8 POLY PG (3) 8" GV (FLxMJ) Q SSMH 4 4 4 I N STA LLE D E D 8— 3 -- 0 4 4 4 > PRIOR TO INSTALLATION SSMH RIM 1 1 7.93 Q OF 8" PLUG RIM 117,93 CONCRETE BLOCK _ STA. 18+38, RT. t+" 10 IE 10W, I, 109.5 S) 8"x6" TEE (MJxFL) (8»c w,E & s} (4)" SHACKLE = STA. 31 +34, LT. 9' RODS FROM r S. 15TH ST 3142 8 6" G.V. (FLxMJ) ! (4) SHACKLE RODS DEAD —MAN BLOCK O 90' BEND TO PER DETAIL S. 1 5TH ST i DEAD —MAN W STA. 18+38, RT. 25' FROM DEAD -MAN TO O 20' FIRE HYDRANT ASSEMBLY W 6 4-- 90' BEND Q '� '� EXIST. UTILITY 7-1 _ NEW 8 DIP = » m '� s"c� w ; s ci w 5, cTn �st�n� DT ��' Q fl4- 6"�"C1 W 1'-0" MIN, f E-- " DEAD -MAN BLOCK 8'°� , (TYPICAL = s Ci w s"Ci w 7 4 3 5 B.,C �6 W8'c ' PER DETAIL U_i ,8 8"c S 8' 1 #2 PHONE CABLE " — 3 NOTE: g»C ENCASED IN CONCRETE 6 90' BEND (MJxMJ) ♦� 8" C :._ :_:.. NO : - O L� NOTE: �.= `° \\ '. 42" COVER TO T.O.P. 6" MIN. MAINTAIN 6 MIN. VERT. CONCRETE BLOCK 8" x 6" TEE (MJxMJ) CLEARANCE W/ EX. UTILITIES '0 6 " 4L SPOOL PIECE STA: 18+05.46 STA.18+17, RT. 24' (TYPICAL) 6"-W- ROMAC ADAPTER VERT. BEND 8» PLUG (MJ) 6" .4:' 90' BEND (MJxMJ) '" Di —CI CB ` 6 TEMP. PLUG (MJ) BLOCKING : ( ) STA.18+21 RT\ 14' CONCRETE BLOCKS CONCRETE BLOCK (SEE STD. DETAIL) ' `• \ RIM CB RIM 8"C E) ' 6" -4-' SPOOL PIECE IE 114 g 116.83 E 14.8 (8"C E) " TEE MJxFL � 2" TAP & 2" PLUG SSMH 22 1 j2` OR 45` VERT. (8"c E) $ (MJxFL)BEND MJxMJ CONCRETE BLOCK TEMP. B.O. ASSEMBLY RIM 183.95 6"-*:' ROMAC ADAPTER (DI —CI) AS REQUIRED) \-- SSMH IE 177,6 8" GY�% (FLxMJ) RIM 183,95 (8"C N, w & E) UTILTY CROSSING DETAIL IE 177.6 NO SCALE TESTING CONNECTION DETAIL r8N FINAL TIE—IN CONNECTION DETAIL 8 (8"6 N, w & E) S. 19TH STREET k.8 INSTALLED ON 8-1 1-04 8 S. 19TH STREET _ R" , „=20' „�, � ,�, , i, 5io4 CONNECTION DETAIL 5 FINAL TIE—IN N 5 BY FED INFORMATION NOTES/MEASUREMENTS °�°" Rom+ CITY OF WATER MAIN REPLACEMENT TESTING C O N N E C �`°°°°� 5 CONNECTION DETAIL 5 RLM �sm DATUM RENTON TALBOT HILL , �� Plonning/Building/Public Works Dept. PHASE 1 W — 31 42 INSTALLED ON 8-10-04 ,�„Om Im � W r� ,. Z' �3 r _, NO. REVISION BY DATE APPR OPmAm DETAIL SHEET (AS -BUILT) sum ap 14 SCANNED OCT 0 8 .I&*►Gc 0 c a 0 :. x z W N