Loading...
HomeMy WebLinkAboutWTR2703142.12N d" r M N STA. 35+42, LT. 42' STA. 33+20, LT. 41 ' . 8"x4" TEE (MJxMJ) STA. 35+71, LT. 54' DEAD -MAN BLOCK (2) 8" PLUG (MJ) ' PER DETAIL DEAD -MAN BLOCK �j (4) J" SHACKLE RODS PER DETAIL STA. 33+25, LT. 33' V FROM TEE TO 90' BEND (/') Cn i) STA. 33+34, LT. 33' 4" 90' BEND (MJxMJ) , STA. 35+71, LT. 42' (f 4 90' BEND MJxMJ LiJ (,� 8"x4" TEE (MJxMJ) CONCRETE BLOCK STA. 35+42, LT. 20 W RELOCATED TO: (MJxMJ) (� W CB 4" SPOOL PIECE 8" TEE (MJxMJ) = CONCRETE BLOCK = RIM 105.74 8 PLUG (MJ) �� t= STA. 35+42, LT. 28 4" SPOOL PIECE CB � IE 1 oz_s (1 o"c NW) 4 ROMAC ADAPTER (DI -CI) 8 GV (FLxMJ) Q \ IE 103.6 (10"C S) _ 4 ROMAC ADAPTER (DI- IE RIM 105.74 i CONCRETE BLOCKS W ' �. W CONCRETE BLOCK " „ ( ) = IEE1oo3a(1(i�o'c s) 3 (4) �" SHACKLE RODS �� � � 8 x6 TEE (MJxFL) " � U) ) ;� 8# NOTE: (f) a FROM TEE TO DEAD -MAN (4) SHACKLE RODS (n Q " (4) SHACKLE RODS P2 (1) Q 6 GV (FLxMJ) FROM 90' BEND TO DEAD -MAN � MAINTAIN 6" MIN. VERT. � * FROM 8 TEE TO 8 x4 TEE STA. 35+35, LT. 28' \ 10' Of CLEARANCE W% EX. UTILITIES � 6' 7' ,;I ^�' 6 ,- 0 / 3 ® (TYPICAL) 0 '\ _ ® FIRE HYDRANT ASSEMBLY S. 15TH ST. 2 S. 15TH ST. S. 15TH ST. S. 15TH ST. T`� NEW 8" DIP NEW 8" DIP o 6"CI W 6"CI W 6"CI W 6" 6"CI W 6"CI w TMH TMH�>_ 8"C 8"C 8"C 8"C STA: 33+34, LT. 9' rM (3) 8" GV (MJxMJ) / CONCRETE BLOCK - SSMH CB J/ - SSMH CB RIM 96.37 RIM 96.88 RIM 96.37IE 89.3(8"C W & N) RIM 96.88 IE 89.3(8"C W & N) IE 95.2(8"C W) IE 95.2(8"C W) IE 95.1(8"C E) IE 95.1(8"C E) IE 95.3(6"ADS SW) IE 95.3(6"ADS SW) TESTING CONNECTION DETAILS 10 TESTING CONNECTION DETAILS $ INSTALLED ON 8-12-04 w TESTING CONNECTION DETAILS 9 TESTING CONNECTION DETAILS SAWCUT FINAL JOINT R TYP. EACH SIDE 8 PLACE CONCRETE AGAINST UNDISTURBED -y "- EARTH BOTH FACES r i_ <" ::'" ; a _ EXIST. ASPH. CONC. PAVEMENT, TYP. v 8" plpE 12" �' CL 'B' ASPHALT CONCRETE PATCH TYP (2 LIFTS) /•� 6" CRUSHED SURFACING TOP COURSE J III=1 I I I.I I I I_I I I I I I I_I (I II I=I I I L= TRENCH STA. 43+81. RT. 61' CUT & CAP EXIST. 6" 0 8" TEE ^^' o�"'^ (MJxMJ) ,� ® WATER PRIOR TO (� a° D D �' SUBSEQUENT BACKFILL CONCRETE BLOCK 0 TIE-IN CONNECTION 1.5 MIN. (SEE BEDDING/BACKFILL DETAIL) s� PAY LIMIT OF TRENCH STA. 43+79 4W,- RT. 70' -S"�' 0 -"i PATCH PAYMENT 8" TEE (MJxMJ) CUT & CAP EXIST. 1 (n 5'-0" FOR MAINLINE (3) 8" GV (FLxMJ) ��� 6" WATER PRIOR TO � � 1 � SHACKLE RODS g'_6"'i.,81 STREET CROSSINGS PERPENDICULAR MAIN LINE CONCRETE BLOCK ��� TIE-IN CONNECTION (4) shackle rods 0' (AS REQUIRED) *NOTE: MODIFIED REQUIRED TRENCH WIDTH � (5 FT. T.O.P.) C from tee to reducer 0 7' 0 CLASS 5 1/2 SACK PER NEGOTIATED CHANGE ORDER CONCRETE PLAN VIEW 0 ....� �.! C 3000 PSI MIN ASPHALT CONCRETE PAVEMENT T EX. DEADMAN __4 4- 3/4" SHACKLE RODS '`�.l g � (4 FT. T.O.P.) ri rn FOR 8" PIPE RESTORATION DETAIL ' J RIM 106.87 „ „ CB ;a"„Q" an• Rctiln r�� �.,►a IE 99.7(12"C N) 0I 8 x6 REDUCER (MJxMJ) RIM 106.87 " NOT TO SCALE 'J) /Q.� IE 99.7(12"C W) .� CONCRETE BLOCK IE 99.7(12"IE c wj CENTERAN CONCRETE 199.7(12"C S) T1 �� �r IE 99.7(12"C S) PRV VAULT AND FACILITY �� �!' 8 x6 REDUCER (MJxMJ) 12" MIN. TO REPLACED BY CITY CB CONCRETE BLOCK RIM 105.56 , RIM 105.56 CB FORCES o� �. 4 fE 103.0(12"C E) �O J 6 w 11314:2 0 C IE 103.0(12"C E) 4' ' _ PAY LIMIT w'1 SEE DETAIL 1 FOR STREET 7 ` -�- ---}- i-- --I- --4-;- _� �oN TRENCH BACKFILL RESTORATION REQUIREMENTS CUT &CAP EXIST. 1 0 `° `� J u' v" 1.5 X PIPE O.D. MAINLINE 6" WATER PRIOR TO 3' (2)" hackle rods (ram 4' MIN. TO 5' MAX. 2'-0" WATER SERVICES & HYDRAN (LATERALS TIE-IN CONNECTION from wet tap to deadman SUBSEQUENT BACKFILL MATERIAL CLOSE EXIST. 6" GV 8" 90° BEND (MJxMJ) OTIVE RA IMPORT PERROSECTION 9-03 14(1) CONCRETE BLOCK TYPICAL CONCRETE DEADMAN ANCHOR GRAVEL BORROW WET TAP BY OTHERS (7 FT. T.O.P.) DETAIL PROPOSED WATER MAIN WITH POLYWRAP " 6" PIPE ZONE MATERIAL PER SECTION 9-03.12(3) CONCRETE DEADMAN BLOCK SHALL BE POURED GRAVEL BACKFILL FOR PIPE ZONE BEDDING & CURED FOR MIN. 5 DAYS PRIOR TO CONNECTION (INCIDENTAL TO PIPE BID ITEM) TO PRESSUREIZED WATER MAINS. EXCAVATION AND BACKFILL OF 6" UNSUITABLE FOUNDATION MATERIAL (IF NECESSARY) f 1HDEPTH AS APPROVED BY ENGINEER DEPTH AS REQ'D MATERIAL SHALL MEET SECTION TESTING CONNECTION DETAIL 1 1 1 FINAL TIE-IN CONNECTION DETAIL 9-03.9(1) BALLAST 10 10 INSTALLED ON 8- 1 7-04(1aAqin WATER MAINZ WATER SERVICES TYPICAL TRENCH BEDDING BACKFILL SCUL _ oft AS -BUILT INFORMATION PROVIDED , R" 1 "=20' "°"� NAD '"'► CITY OF 1 f 15/04 BY FIELD NOTES MEASUREMENTS RLM WATER MAIN REPLACEMENT nEuNwIft wim "AN pas RLM aw� R E N TO N TALBOT HILL ft DATUM M ` "� G u m a m Planning/Building/Public Works Dept. PHASE 1 W- 3142 F" w rip - A ;Pm *01Va NO. REVISION BY DATE APPR DETAIL SHEET (AS -BUILD Fiw. 12 or:14 SCANNFO Off 0 8 ZZM 1 J C47 -V I�j