Loading...
HomeMy WebLinkAboutSWP2703146.1T C'7 i N WETLAND TRACT NO MACHINERY ALLOWED ALL MACHINERY SHALL WORK FROM TOP OF BANK INSTALL NEW CB TYPE II REBUILD SLOPE, SEE DETAI EX 24" CMP --,, EX CB - - RIM EL=396.9 S 12"IE=393.65 N 12"IE=393.56 12"DI i a O4 L U) I— U a U _ - a 4_0 U 00 LO 00 a x W x 4 Ll l W a z ? dURIED PWI WOOD FENCE j REMOVE AS NEEDED, RESTORE a WOOD RAIL ___� IE�392.6���� v d� - RESTORE STOP BAR FENCE APPX TOP STOP I N OF SLOPE Ij ° TEL BO - EX 12"PVC IE-394 }- EX. ROCKERY WALL WOOD RAIL FENCE --- EX CB RIM EL=396.9 N 12"IE=395.75 ��N CALL 48 HOURS BEFORE YOU DIG - - 1-800-424-5555 0' 10' EXISTING UTILITY LOCATIONS ARE APPROXIMATE, NOT ALL UTILTIES MAY BE SHOWN. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. SCALE: 1"= 10' SSMH RIM EL- 397.65 GENERAL NOTES: IN IE- 389.12 A. THIS PLAN DEVELOPED FROM PLANS AND ELEVATIONS IN CITY FILES. -OUT IE-389.02 NOT SURVEYED. LOCATIONS MAY VARY. REF: TED-40-2956 THE VINEYARDS SUBDIVISION TED-40-1600 UNION AVE PLANS B. CONTRACTOR SHALL INSTALL EROSION CONTROL, INCLUDING FILTER FABRIC PROTECTION FOR DOWNSTREAM CATCHBASINS. NOTE: EX FIBER OPTICS APPROX. C. TRENCH PATCH SHALL BE PER CITY STD PLAN 110 2' DEEP ENCASED IN CONCRETE TYPICAL TRANSVERSE PATCH FOR FLEXIBLE PAVEMENT. D. SEE TRAFFIC CONTROL BID ITEM FOR WORK HOURS AND CONDITIONS. - O EX 8 PVC SS EX 8"PVC - - a a -- -- - UT- i�� FIR/OPTItS, LpC- �AF�P GV EX FIBEROPTIC LOC APPX - --_ - _ \ .� REMOVE NEIGHBORHOOD SIGN POWER POLE AND LANDSCAPING RESTORE AFTER CONSTRUCTION -- --- --_ EX 12"CI WM 12"CI WM r� 2 POTHOLE RESTORE CURB, GUTTER, SIDEWALK, 3 f TRAFFIC/PARKING LANE INSTALL NEW SID ALK RAMP TYPE 2 ADJUST T FIT EX SIDEWALK - - EX b GAS - EX 6" GAS REMOVE EX 24" CMP SD u') �-- TRAFFIC LANE UNION AV 0 INSTALL NEW 24" SD EX 24"CMP SD —� EX 24"CMP SD TRAFFIC LANE —► EX SDMH RIM EL=399.1 )6" WM TRAFFIC/PARKING LANE CAUTION: POSSIBLE BURIED CABLE AND FIBER OPTICS IN WEST HALF OF STREET E NE W z PROFILE ALONG NEW PIPE LINE SCALE HORIZ: 1 "= 10' VERT: 1"= 5' .......... ................. ........ _......... REMOVE WOOD FENCE AND NEIGHBORHOOD (SIGN ...---.................................. NEIGHBORHOOD SIGN STORE, RESTORE AFTER CONSTRUCTION Location Ap:px EX SDMH - - - -- ..............: ........... TE E., CABtE..?...- -----...- -- - - --- .RIM EL..... ---------------_--------- ------------------------_--------- - .......... ....... ---- --------....._............... ... REBUILD SLOPE 2H:1V (MIN) LOC UNK N 24"CMP EE 391.6 ADJUST TO FIT LOCATION, SEE DETAIL= E 24"CMP IE 391.6 NEW E 24" IE=391.6 FIBER OPTIC f 4' DEEP S 24"CMP IE 391.6 CONC. ENCASED 6" GAS T 4oa ------.._ CB..TYPE .11..48'..AND..OVERFLOW GRATE _----... ..-- .....:.......... 12"W.. .......DEPTH APPX ........ ........ -. ................. ........ .. _..._........ ....... - _ .... _ SEE DETAIL, REVIEW LOCATION WITH !__ __- DEPTH APPX - - CITY POTHOLE RESULTS :- 8/7/09 CITY BEFORE PLACING CB SDMH 24" IE 391.59 ° CULVERT 24" INLET IE 392.6 ' o� GAS 6" TOP EL -395.1 3g5----------- DEBRIC -BARRIER-II SEE DETAIL --- _ -- .. .......:.................... -_ .. -- ----- - _------- - - -- R 12" _ DIP --- -WBER�'OPTIc coNc .52 BAN 39roP 39�:�6 _..... .... -� -395- .... BOTTOM 396.45 MATCH EX CULVERT 390 IEN392.6 _ ... ..... - POTHOLE _ - .. ...... ........ 390 .. _ o 2 EX 24" :CMP IE-392.6 8"SS Est IE=389.25 REMOVE EX 24"CMP, INSTALL 60 LF 24"CPEP O 0.017 FT/FT ADJUST LENGTH:AS NEEDED RECOMMENDED FOR APPROVAL BY DANIEL CAREY 6/29/10 BY 0 CONSTRUCTION NOTES: 10 REMOVE EX SD PIPE, ENLARGE OPENING AS NEEDED FOR NEW PIPE. O2 POTHOLE TO IDENTIFY UTILITY DEPTH, POTENTIAL CONFLICTS. O RESTORE CURB, GUTTER, SIDEWALK PER CITY DETAIL DRAWINGS. ADJUST SIDEWALK AND TYPE 2A RAMP AS NEEDED TO MATCH EXISTING. ® TESC PROTECTION: CATCH BASIN PROTECTION, FILTER FABRIC FENCING, ETC. SEE STD DETAILS 214, 216.2, 216.3. INSTALL FILTER FABRIC FENCE IN FRONT OF CONSTRUCTION AREA. PUMP WATER AROUND FILTER FABRIC AND CULVERT AS NEEDED. O PROVIDE TEMP STORM WATER BYPASS FOR EX 24" PIPE DURING CONSTRUCTION. TYPICAL TRENCH BEDDING AND BACKI= ILL (NTS) TRENCH EXCAVATION PAY LIMIT 5'-0' MAXIMUM SEE DETAIL FOR PAVEMENT PATCH BACKFILL MATERIAL WSDOT SECTION 9-03.19 BANK RUN GRAVEL, OR NATIVE MATERIAL IF IT MEETS SPECS. PIPE ZONE MATERIAL WSDOT 2006 SECTION 9-03.12(3) GRAVEL BACKFILL FOR PIPE ZONE BEDDING NEW UTILITY PIPE EXCAVATION OF UNSUITABLE SOIL (IF NEEDED) DEPTH AS APPROVED BY ENGINEER BACKFILL WITH FOUNDATION MATERIAL MEETING WSDOT SECTION 9-13.6 QUARRY SPALLS NOTES 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT PIPE ZONE MATERIAL TO 95% MAXIMUM DENSITY EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE HAND TAMP ONLY. 4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE THAT THE FLOW LINE IS MAINTAINED. D=3 14601 FINAL DATE. SURVEYED: SCALE: VERTICAL- NAVE) 1988 6/ 1 8/ 1 0 HORIZONTAL: NAD 1983/1991 �► DESIGNEDDWC As Noted _� ��- CITY OF UNION AVE NE / NE 5th CT FIELDBOOK: DRAWN: � RENT 0 N PE. ONE INCH DATUM �Wc STORM SYSTEM REPAIR DRAWING NO: CHECKED: AT FULL SCALE Planning/Building/Public Works Dept. RJS, DWC IF NOT ONE INCH N 0 . REVISION BY DATE AP P R APPROVED: SCALE ACCORDINGLY SHEET: - OF: 4 RJS i 1416