Loading...
HomeMy WebLinkAboutTRO4103195.26 Q -t 0 I--, CN 00 0 0 n CC 0 XW z 0 0 z ry n n n opall MR 6 -7 604 17 P IL AW 1/4, NW 1/4, SEC. 14, TWP. 23 N., ROE. 5 E., WK. - - - - - - - - - - - - - - - CN &E.ISTCT. 94 LUMIN/ Me " PON Mly, WIRING SCHEDULE CONDUIT RUN Z� CONDUIT SIZE CONDUCTORS NOTES 1 1.5" PVC (SCHEDULE 40) 2-#6, 1-#6 GREEN 2 1.5" PVC (SCHEDULE 80) 2-#6, 1 -#6 GREEN 3 1.5" PVC (SCHEDULE 80) 4- #6, 1-#6 GREEN- 4 2" PVC (SCHEDULE 40) 6 - #6, 1-#6 GREEN 5 2" PVC (SCHEDULE 40) 8-#6, 3-#14 1 -#6 GREEN PHOTOCELL 6 1.5" PVC (SCHEDULE 40) 2- #6, 1 3-#14 1-#6 GREEN PHOTOCELL T-319502 INSTALL CONCRETE FOUNDATION, LIGHT STANDARD AND LUMINAIRE PER POLE SCHEDULE. INSTALL TYPE 1 JUNCTION BOX WITH CONCRETE PAD. INSTALL FOUNDATION AND ELECTRICAL SERVICE CABINET # 0087 AT DUVALL AVE. N.E. APPROX. STA 8+04, 23' RT. COIL 3' OF 2-#6 CONDUCTOR FOR FUTURE CIRCUIT C. COORDINATE WITH PSE FOR SERVICE CONNECTION. 40 COIL 5' OF 2-#6 CONDUCTORS FOR FUTURE CIRCUIT C. r4?o ub 4*40 ***,Or TRANSPORTATION PLANNING & ENGINEERING, INC. 2223 112TH AVE NE, SUITE 101, BELLEVUE WA 98004 (425)455-5320