HomeMy WebLinkAboutTED4003196.2W
i
Q
Z
U
L►J
oc
a
,-A,
TA 100+83.42 = INTERSECTION
1 ' i
DALPAY PLAT DIVISION N OF NE 19TH ST & REC�nOND AVE NE i SITE BENCHMARK - - - - - -- , ����%�
LOT... " ' J� SHOF'N BB:60,#r I RO' ' 4 'G x v FOUND R,R. SPIKE IN �1 P.
EL.- 431.67 U.S. f
COtAG' Ex 3 XX4�6 IQ 1
86J 14 '?
X STORM F-H� D I d - - ----�
_
10
Ex
.ern. 'ROW I"�14'
.� w�• IL. iy. �yr 1 _ _"!''w y't. L�«.+"�iw..t`'.:.., ,,. ._ ...e.. _
I
z
ii
i
EX # 1, SSMH
RiM=431.09
8" PVC IE'S= NORTH 415.79,
EAST& WEST 415.84
EX #2, SSMH
RIM= 421.30
8" PVC EAST & WEST IF_= 416,78
EX jf 3, SDMH
RIM=430, 92
EAST iE-419.24
WEST IE=419,37
NORTH IE=419.12
EX #4, CB
RIM-422.03
18" EAST IE-415.58
18" SOUTH IE--415.43
EX #5, CB
RIM=423.66
WEST IE=418.51
SOUTH IE=418.41
EX #6, SDMH
RIM=423.71
EX #7, SDMH
RiM=420.93 ADJUST TO NEW GRADE
EX #8, SDMH
RiM= 420. 69
18" NORTH iE=411.94
18" S. W. IE=41 1.94
EX #9, OUTFALL
IE=408.97
EX #10, OUTFALL
1E=409,14
42
BENCHMARK. TL if 042305-9031 38b-
FOUND CONCRETE MONUMENT WiTH 1 112" BRASS DiSK
IN CASE AT INT. UNION AVE. N.E. & N,E. 12TIl ST. (S.E COR. F/
SEC. 4, T23N., R5E.)
00
ELEVATION = 415,95 U. S. FEET.
FOUND RAILROAD `;PIYF_ IN UTILITY POLE ^�cy
ELEVATION 431.67 U. c r EET. ��
w
ti
w
Av
v
0
ti
A
W
� ll
TL # 042305-9032-07
TOTAL AREA
110,180-+ SQ. FT,
2.5.t ACRES
AREA of n'. G. P. E.
LOT 3 = 357± SQ. FT.
LOT 4 = 2, 326 SQ. FT
LOT 5 - 30,362:t- SQ. FT.
LINE
L 1
L2
L3
_
N�a ,, .'
DIS.t:.NCE
29.287
; 7,070
59.548
L4
N00 C . `.. '
55.027
L5
N06
38.473
L6
S75
32.406
L7
S1S
61.7573
Lei
S03
79.665
L9
L10
L 1 1
_ _
c %
_
as L.
76.043
40.521
L 12
S26
66.015
L 13 S34 06'21;� "t/ 63.245
cx�
K1
S. LINE, N.E. 114, S. E, 1 /4
M Co
'�� ':� � ,� � {,„F..� w«:.� -aid t""�3 � j' , � �.'°. a...�✓ � � _;
�L}q 4,5{7 G A p�••. Yew �^ `. 1"� �, +, a ,'+"R+'��` rt.
A.
�� `9` �'�4..A� �i�.a,� ';./ r.h wr.n._.:+�✓ TY f' 1 a L,4 / J
B
\ V E b
945 N. CNTiar,._, STL:, # 1 3)4, KL_,N#, W A 9 6 C 2
i
r.- e r. -�
6 ae F "�.. n. a_' try
(253)852-4880 (local) or I __00G j251--;� i 69 (toli free) (253)852-4955 `fcx)
E-MAIL: cni4crcrrlernw.corn
r., NO.
.S CTIO11 4, T 23 tf R 5
ALL NEF HOH. S S. r ..LL iUNOFF
THROUGH F�'R ��� y �'63 5 UBOUT f-PJOR TO
STO STUB CONNECTION, PER DTL 112 BELOX
random fill
filter f c b ri c
4 perf pipe
i� ri Q70 O Q° 70 pOS
a° 0 7 0 0 0° ZZ C 1/2"-1" washed rock
0a QQ0 <D a 0pQl
00 7 0 0° 0 0 0i
7 °oo o °7Q0 7 0
00 0
0070o OQ Q Oo7
24" min
1 0 rE! \nfi�ILI M
NTS
to road
drainage system
2' X 10'
level trench
w/perf pipe
P° L o , M�i��v OF ROOF
H7a
STUE3067�
ALL TRENCH RESTORATION SF;.LL BE PER THE CJRRENT CITY OF RENTON
TRENCH RESTORATION AND STREET OVERLAY DETAIL.
THE MAXIMUM HEIGHT ALLOWED FOR THE ROCKERY DETAIL IS 4 FEET.
ANY ROCKERY GREATER THAN 4 FEET IN HEIGHT MUST BE DESIGNED
AND INSPECTED BY A LICENSED ENGINEER WITH GEOTECHNICAL EXPERTISE.
ANY ROOKERY GREATER THAN 4 FEET ON HEIGHT SHALL BE SUBMITTED
TO THE CITY OF RENTON BUILDING DEPARTMENT FOR A SEPARATE BUILDING
PERMIT.
LENGTH Jv. ti
1 tc 2 8" PVC 54' 0.48%
2 to 3 12" ADS 140, 0.34% i1
3 to 4 12" ADS I 43' 0.35% 1
a v i PIN
CBS 1-1-7-2
RIM
iNVER T
422.51
419.71 (8" PVC E), 420.11 (6" PVC N), 420.18 (6" ?VC W)
2
1 420.42
417.82 (12" ADS N), 417.97 (8" PVC W)
3
1 421.85
1 417.3;:; (12" ADS S), 417.12 (12" ADS W)
4
1 + 424.27
416.67 (12" ADS N), 416.97 (12" ADS S,r.`,,, 417.37 (6" PVC SM)
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE- CONSTRUC7 ll'EETING MUST BE HELD WITH THE CSTY OF RENTON PLAN REVIEWER.
2. Ail construction shall be in accordance with the 1996 Standard Specifications for ILL :,-dge and Municipal Construction prepared by WSDOT and the American
Public Works Association (APWA), as amended by the City of Renton Public Works �
3. The surface water drainage system shall be constructed according to the r,s, which are on file in the Public Works Department. Any deviation from
the approved plans will require written approval from the City of Renton Public 3epartment, Surface Water Utility Section.
4. A copy of these approved plans must be on the job site whenever construc,, e, is in progress.
5. Datum shall be NAVD 88 unless otherwise approved by the City of Renton Public Works Department. Reference benchmark and elevations are noted on the plans.
6. All sedimentation/erosion facilities must be in operation prior to clearing and building construction, and they must be satisfactorily maintained until construction is
completed and the potential for on -site erosio
n has passed.
7. Ail retention/detention facilities must be installed and in operation prior to or in conjunction with all construction activity unless otherwise approved by the Public
Works Department, Surface Water Utility Section.
8. Grass seed may be applied by hydroseeding. The grass seed mixture, other than City of Renton approved standard mixes, shall be submitted by a Landscape
Architect and approved by the Public Works Department, Surface Water Utility Section.
9. All pipe and appurtenances shall be laid on a properly prepared foundation in accordance with Section 7-02.3(1) of the current State of Washington Standard
Specification for Road and Bridge Construction. This shall include necessary leveling of the trench bottom or the top of the foundation material, as well as placement
and compaction of required bedding material, to uniform grade so that the entire length of the pipe will be supported on a uniformly dense, unyielding base. All pipe
bedding shall be APWA Class "C", with the exception of PVC pipe. All trench backfill shall be compacted to minimum 95% for pavement and structural fill and 90%
otherwise per AS,7M D-1557-70. Pea gravel bedding shall be 6 inches over and under PVC pipe.
10. Galvanized steel pipe and aluminized steel pipe for all drainage facilities shall have asphalt treatment #1 or better inside and outside.
11. Structures shall not be permitted within 10 feet of the spring fine of any storm drainage pipe, or 15 feet from the top of any channel bank.
12. All catch basin grates shall be depressed 0.10 feet below pavement level.
13. Open cut road crossings through existing public right of way will not be Glowed unless specifically approved by City of Renton Planning/Building/Public Works
Administrator.
14. Rock for erosion protection of roadside ditches, where required, shall be of sound quarry rock placed to a depth of one (1) foot and must meet the following
specifications:
4 - 8 inch rock / 40 - 70% passing;
2 - 4 inch rock / 30 - 40% passing; and
less than 2 inch rock / 10 - 20% passing.
15. All building downspouts and footing drains shall be connected to the storm drain4ye system, unless approved by the City plan reviewer or Surface Water Utility
Section. An accurately dimensioned, certified as -built drawing of this dreinage system ;,`1 be submitted to the City upon completion.
16. issuance of the building or construction permits by the City of Renton does not re ,ve the owner of the continuing legal obligation and/or liability connected with
storm surface water disposition. Further, the City of Renton does not accept any obligation for the proper functioning and maintenance of the system provided
during construction.
17. The Contractor shall be responsible for providing adequate safeguard, safety devices, protective equipment, flaggers, and any other needed actions to protect the
life, health, and safety of the public, and to protect property in connection with the performance of work covered by the contract. Any work within the traveled right
of way that may interrupt normal traffic flow shall require a traffic control plan approve by the Public Works Department, Transportation Systems Division, All
sections of the WSDOT Standard Specifications 1-07-23 Traffic Control shall apply.
18. Special drainage measures wii; be required if the project location is within the aquifer protection area (APA),
19. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN
ENGINEER.
20. All limits of clearing and areas of vegetation preservation as prescribed on the plan(s) shall be clearly flagged in the field and observed during construction.
21. Ail required sedimentation/erosion control facilities must be constructed and in operation prior to land clearing and/or construction to ensure that sediment laden
water does not enter the natural drainage system. All erosion and sediment facilities shall be maintained in a satisfactory condition until such time that clearing
and/or construction is complete and potential for on -site erosion has passed. The implementation, maintenance, replacement and additions to erosion/sedimentation
control systems shall be the responsibility of the permitee.
22. The erosion and sedimentation c1^trail systems depicted on this drawing are intended to be minimum requirements to meet anticipated site conditions. As
construction progresses and unexpec�d or seasonal conditions dictate, the permitee shall anticipate that more erosion and sedimentation control facilities will be
necessary to ensure complete siltation control on the proposed site. During the course of construction, it shall be the obligation and responsibility of the permitee to
address any new conditions that may be created by the activities and to provide additional facilities, over and above minimum requirements, as may be needed, to
protect adjacent properties and water quality of the receiving drainage system.
23. Approval of this plan is for erosion/sedimentation control only. - It does not constitute an approval of storm drainage design, size nor location of pipes,
restrictors, channels, or retention facilities. -
24. During the time period of October 1st'through'April 30th, all project distributed soil areas greater than 5,000 square feet, that are to be left un-worked for
more than 12 hours, shall be covered by mulch, sodding or plastic covering.
25. In any area which has been stripped of vegetation and where no further work is anticipated for a period 30 days or more, all disturbed areas must be
immediately stabilized with mulching, gross planting or ot:- approved erosion control treatment applicable to the time of year. Grass seeding alone will be
acceptable only during the months of April through September, inclusive. Seeding may proceed, however, whenever it is in the interest of the permitee, but must be
augmented with mulching, netting or other treatment approved by the City of Renton, outside the specified time peried.
26. For all erosion/sedimentation control ponds where the dead storage depth exceeds 6 inches, a fence is required with a minimum height of three (3) feet, 3:1
side slopes.
27. A temporary gravel construction entrance, 24 feet x 50 feet x 8 inches of 4 to 6 inch quarry spoils shaii be located at all points of vehicular ingress and egress
to the construction site.
Ci" of 5/0
1 JR F�Ai SLR , �`
Crushed Rock /.,'�x,i
1 --
t
-'LTER FABRIC
VOW 0 6" AL-QU i RED UNDER
I
! LERTAN SOIL CONDITIONS
CiiiNX VGiDS, G OR GREATER
][ 1
---fir
6" Pr,70RAYEvA1N P Pw a,:t iv
S.i 1RX vR AS D i nLC Zu uY
N;E r:IY'Lr,.,iw l
12" ,-11 it.
w• y �iW �yiFi lir
UNDISTURBED SOIL OR COI•:PAC7,"D FILL
NX Lv.iC'DIHENSION OF THE ROCKS SHALL EXTEND INTO THE EARTH TO PROVIDE AAXIiiiiUM
STABILITY.
THE ROCK SHALL BE PLACED SO AS TO LOCI; INTO TWO ROCKS IN THE TIER,
, 150 LRS. HiN. 300 LOS. MAX. SIZE 10" IN ITS LEAST DIMENSION
S 330 LDS. " DOO as. SIZE :3" TO 18"
,S .800 LOS. " 1500 ;.ITS. " SIZE LB" TO 24"
4 I . "S 1500 LBS. " 2100 L2,S. " SiZE 24" TO 32"
5 14*., .n JC S 2100 LDS " 3000 LOS. " SIZE 30" TO 38"
"AW' :ZIY GREATER TIIAl1 VEET IN HEIGHT 14JST DE DESIGNED AND INSPECTED BY A
LICL, DIGINEER WITII GEOTECHNICAL EXPERTISE. TIIE ENGINEER BUST CERTIFY TO III€
CITY THE ROCKERY WAS i11STALLED IN ACCORDANCE WITHPLANS AND SPECiF!CATIONS.
ROCKERIES 1 FEET AND LOWER 511ALI. DE CONSTRUCTED OF 4- AAN TO 2 MAN ROCKS FROH
POTTOR TO TOP.
ROCKERIES 7 FEET AND il[GIIER SIIALL DE CONSTRUCTED OF 5 14AN TO 2 BAN Aoc4s FROM
BOTTOM TO TOP,
0(�N K_1 R Y
I • CNW E v ;t a t,aw `ass
� zow �:.:� yeas/;gci
DESrAED: 1 "=40'
CITY OF
� > � 2 "
DRAWN: LSK RENTON',
�'. LSK � ...�...;•�-.
ONE NCX
i CHECKED:
4
LSK AT r�� Planning/Building/Public Works Dept.
IF NOT ONE ;NCH
REVISION l by DAT C_ 1 APPP APPROVED: SCN2 ACCORD#NGLY
AlIow 43 /9 0(0
�d� ,ram." rrnK „dL trd 3VOiL�
s .,, s d I✓�i
THE COP cACTOR ALL BE RESPONSIBLE FOR v
,TION,
DIMES , AND U � A OF ALL EXISTING UTILITIE_.
�P1 ON
THE VS OR BY POTHOLING THE UTILI "
,.�YiNG THE
HO .� AND `✓ ; , iCAL LOCATION PRIOR TO
THIS
SHALL INCLUDE CALLING UTILITY LOCATE 0 1-800 424-
15 AND THEN
POTHOL: NG ALL EX2STNG UTlLrrIES AT LOCATION OF NEW_r`
CROSSINGS
TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXI`
:ATIONS OF
SAID UTILITIES AS SHOWN ON THESE PLANS ARE NOT GL,-
-£0 AND ARE
SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, ThE CONTRACTOR
SHALL CONSULT CRAMER NORTHWEST INC. TO RESOLVE ALL PROBLEMS
PRIOR TO PROCEEDING WITH CONSTRUCTION.
REC0W! 'Q ED 17OR APPROVAL
DAZE:
l V
DATE:
. By.
DATE:
i
DATE:
-•L
,A &iO u PLA7 9/28/04
L�Jx44��ii � Vaf+ �4J#'u✓�Vfi �. dpr u��U�b' WI��1��1 .t �4 J �4u iS,`�,Y
319<=.o -
DWANG NO:
2
%W: OF:
2 9
MMMEMENCA