HomeMy WebLinkAboutTED4003196.5w
Q
Z
F-
U
W
O
D_
ti
x
1 1 /4°' FOUNDARY NAME
1/2" LETTERS RECESSED
TO BE FLUSH
m
w
Z)
U
O
� _ VIZ6
�
S1NVinIlOd ON dV4 WV32ilS Ol
TOP VIEW
23 3/4"
7 /16"
I
- IiU 1 I UM VI_W
I LEVELING PADS
8 — 3/4"X 1 3/4"X 1 /8"
7 1 /4" FOR MACHINING
CLEARANCE
BAR 1" THICK
TYP. 4 PLACES
BARS 1 5/8" THICK
THIS AREA
BARS 1 3/8' THICK
THIS AREA
7/8" TYP. SLOT
3/4"
1 1 /4" I
Iv 1 3/4"
2 1/2-
2"
END VIEW
11 /16'J� R— 7 1 /4"
1 3 /8" �---- 1 3/ 4"
--�
7/8" 3/4" ROUND TANGENT BETWEEN
ELLIPTICAL TWO RADII
23 1 /2" �_ �3/4„
OPTIONAL DESIGN FOR GRATE OPENING ENDS
1/2"
SIDE VIEW 5/8�s SURFACE WATER UTILITY
CATCH BASIN FRAME & GRATE DETAILS
NOTES: IL (SHEET 1 OF 2)
1. SLOT FORMED AND RECESSED FOR 5/8"-11 NC X 2" SOCKET HEAD �
(ALLEN HEAD) BOLT. Y ADOPTED
2. GRATE SHALL BE DUCTILE IRON. om/ Q'"
CITY OF RENTON
3. SHALL CONFORM TO SEC. 9-05.15 OF THE STANDARD SPECIFICATIONS, (41
'�r�
STANDARD PLANS
4. USE VANED GRATE IN CURB LINE. pFN-�O`� LST DATE: 12/96
5. USE FRAME SHOWN IN STANDARD DETAIL D-7•
6. GRATE IS OLYMPIC FOUNDRY #SM50G OR EQUAL. 12 96 REFORMAT TO 11"A7 EDV�AP
DATE REVISION BY DWG. NAME: BR-18 SP PAGE: B020.1
LEVEL PADS (16)
3/4"X 2 1 /4"X 1 /8"
25"
31"
PLAN
18"x24" 9/16" 1 1 /2"
(+1 /32", —0" TYP) I—
�--� 16"x22°' —I
3/4"
17 3/4"x23 3/4"
(+1 /32", —0" TYP)
25"x31"
NOTES: ELEVATION
1. DRILL AND TAP FOR, AND PROVIDE, TWO LOCKING BOLTS 5/8"-11 NC STAINLESS TYPE
304 STEEL SOCKET HEAD (ALLEN HEAD) BOLTS, 2" LONG.
2. FRAME MATERIAL IS CAST IRON PER ASTM A48 CLASS 30 OR BETTER.
3. SET FRAME TO GRADE AND CONTRUCT ROAD AND GUTTER TO BE FLUSH WITH FRAME.
3. FRAME IS OLYMPIC FOUNDRY #SM50 OR EQUAL.
CEMENT CONCRETE CURB
ram'=
GUTTER
VERTICAL CURB
EXTRUDED CURB
CATCH BASIN WALL
CATCH BASIN
WALL
EXTRUDED CURE
SURFACE WATER UTILITY
CATCH BASIN FRAME & GRATE DETAILS
(SHEET 2 OF C)
ADOPTED
CITY OF RENTON
�.,.� ,� STANDARD -;.ANS
�' N �( Cf LST DATE: 12/96
DWG. NAME: BR-18A SP PAGE: B020,2
CATCH BASIN FRAME & GRATE
NTS AS � Kir
Cramer Northwest Inc.
(253)852-4880 (local) or 1—(800)251-0189 (toll free) (253)852--4955 (fax) TONAL E Z 4
E—MAIL: cni®cramernw.com EXPIRES 11/26/2005
-It*.06
SECTION 4, T 23 N, R 5 E
1 /2"X4" EXPANSION MATERIAL
1 /4"R AT JOINTS--,
SCORE LINES TO BE RADIAL
TO CURB AND GUTTER ---�
+
1 /2"X4" EXPANSION MATERIA
1 /4"R AT JOINTS
"W"—WIDTH OF SIDEWALK
1 A EXPANSION
MATERIAL CEM. CONC. CURB AND GUTTER
1 /4"R AT JOINTS
GENERAL NOTES:
SCORE LINES JOINTS: DUMMY JOINTS SHALL BE PLACED NOT TO EXCEED 15' C/C NOR LESS THAN 10' C/C. THEY SHALL
NOT BE LESS THAN 3/16" IN THICKNESS AND SHALL BE EXTENDED 2" BELOW THE GUTTER LINE.
B B 1/2" THRU JOINTS SHALL BE PLACED AT ALL COLD JOINTS AS DIRECTED BY ENGINEER AND SHALL
EXTEND 1 BELOW CONCRETE,
WHERE THE SIDEWALK IS TO BE PLACED AGAINST THE CURB AND GUTTER, THE JOINT SHALL BE A COLD JOINT.
1 /2"X 5" EXPANSION MATERIAL SHALL BE PLACED FROM P.C.'S TO P.T.'S AT ALL CURB RETURNS. 1 /2"X4"
EXPANSION MATERIAL SHALL BE PLACED AT EVERY FOURTH SIDEWALK PANEL. THE CONCRETE MIX FOR SIDEWALKS
SHALL CONFORM TO THE REQUIREMENTS OF CLASS B (3/4") WITH AIR ENTRAINMENT,
THE CONCRETE SHALL HAVE A BROOM FINISH WITH ALL EDGES HAVING A 21/2" TOOLED FINISH,
SUBGRADE COMPACTION SHALL BE 90% (MODIFIED PROCTOR)
1 /2"X5" EXPANSION MATERIAL
1 /4"/FT. SLOPE CURB RETURN ONLY
7 1 /2"R 1 /4"/FT. SLOPE
1 /2"R ® 4" 1 /2"R
`J PAVEMENT AS PER PLANS
4" PAVEMENT AS PER PLANS
STANDARD CEM. CONIC. PARKWAY STANDARD CEM. CONIC.
CURB AND GUTTER CURB AND GUTTER
SECTION A —A SECTION B—B
SEE SHEET 2.5.1 FOR ROADWAY DEVELOPMENT STANDARDS
t R 51. R
vi" R —Top of curb
at approach
T; '' y=" 61/2"
CEMENT CONCRETE BARRIER ADOPTED
CI'rYOFREi•PrCIN
CURB AND GUTTER ,ate
+ Standard Plans
¢�,N Lst DatcMar 1. 3 1992
-01 SP PAGE F001
CURB 8c GUTTER
2-r3
"
S-i�-92
Rwiw�1 b�rOsr curb tttlw.
NTS
(TYP)
ALTERNATE 1 � A �✓
SIDEWALK AND PLANTER STRIP
2 (TYP)
�`r�Q� j'�s•
I DATE
I REVISION
I BY
(APPR
SIDEWALK
NTS
2
7
(TYP) VZ."
Gu. A
DRIVEWAY OR ALLEY
SEE ZONING CODE FOR
FOR MAX & MIN WIDTHS
L-10" COMMERCIAL ZONE
6" RESIDENTIAL ZONE
0
cw,
A
v
6' MIN
L,-v
OQ
2 (TYP)
U
CL
mQ
CURB AND GUTTER SHOWN
HOWEVER, OTHER CURBS
MAY BE USED.
(SEE STANDARD PLANS)
TYPICAL SIDEWALK
ADOPTED
U\ 'n CITY OF RENTON
STANDARD PLANS
'AiN t O� LST DATE: 12/96
DWG, NAME: FR-02 SP PAGE: F007
R-3Il605
�18°W
SEE DETAIL "A'°
SECTION A -A
?s
JOINT
3/16"' SCORE LINE
2
ALTERNATE ERNATE 2 /
B
SIDEWALK NEXT TO CURB 10" COMMERCIAL ZONE
(NO PLANTER STRIP)
�18°'
6" RESIDENTIAL ZONE
THICKENED BASE OF CURB & GUTTER
DETAIL A
TO MATCH APPROACH THICKNESS
ON COMMERCIAL APPROACHES. (TYP)
APPROACH WITH
NOTES:
MONOLITHIC CURB
1.
DUMMY JOINTS SHALL BE PLACED NOT TO EXCEED 15' C/C NOR LESS THAN 10' C/C. THEY SHALL
SEE NOTE 5
NOT BE LESS THAN 3/16" IN THICKNESS AND SHALL BE 2-1/4" DEEP.
2.
1 /2" THRU JOINTS SHALL BE PLACED AT BACK, SIDES AND FRONT (BEHIND CURB) OF APPROACH,
AND IN CURB/GUTTER TO DUMMY JOINTS,
CEMENT
CONCETE APPROACH
3.
CEMENT CONCRETE SHALL BE CLASS 3000 AIR ENTRAINED.
4,
ALL JOINTS SHALL BE CLEANED AND EDGED.
FOR
DRIVEWAYS AND ALLEYS
5.
APPROACH SHALL NOT BE POURED INTEGRAL WITH CURB AND GUTTER, BUT MAY BE POURED
Y
ADOPTED
6.
INTEGRAL WITH STANDARD CURB (SEE DETAIL "A").
SUBGRADE COMPACTION SHALL BE 95% MODIFIED PROCTOR.
CITY OF RENTON
7.
APPROACH CENTERLINE TO MATCH THE DRIVEWAY/ALLEY CENTERLINE,
F
STANDARD PLANS
THE APPROACH WIDTH WILL BE 10' WIDER THAN THE DRIVEWAY/
N (�
LST DATE: 12/96
ALLEY WIDTH. 10/22/96 Edited graphics, text. Added note 7.
jDCV I DRT
DATE REVISION
I BY 1APPR'DI DWG. NAME:
FR01 N SP PAGE: F006
DRIVEWAY APPROACH (4
NTS 7
SURVEYED: SCALE:
CNN 19
HOR ZONTAL. NAD 1983/1991 i►
DESMED: J. CITY OF
LSK .�
DRAWN; RENTON
LSK
ONE INCH DATUM
CHECKED; SK AT FULL SCALE Planning/Building/Public Works Dept.
IF NOT ONE INCH
NO. REVISION BY DATE APPR SCALE ACCORDINGLY I
SCANNI'O APR 2 2 Yv6
RECOMMENDED FOR APPROVAL
BY: DATE:
BY: DATE:
BY: DATE:
BY: DATE:
DATE:
DALPAY SHORT PLAT 9-28-04
FOR JIM DALPAY FlELD0001f:
PAGE:
DRAWING NO:
DRAINAGE & ROAD DETAILS %
t1EET: or:
7 9
A N N AA
T.