HomeMy WebLinkAboutTED4003197.4NW 1/4, NW 1/4, SEC. 16, TWP. 23 N., RGE. 5 E., W.M.
w
Q
z
LLJ
a_
E
Q
v
0
0
m
3
0
tV
V
N
U
01
m
w
CL
01
0.
01
01
P
u�
CL
CL
LU
Q
0
LL
w
LU
0
0
v;
UNDERGROUND LOCATOR SERVICE
CALL BEFORE YOU DIG.
1-800— 424-5555
T*O - (to -,lp lo;p
'Com
DESIGN
14711 N.E. 29th Place, # 101
Bellevue, Washington 98007
425.885.7877 Fax 425.885.7963
CORE Job No. 99 7 21
S,p 33251
IDS ONAL
FRES 22-04-04 I NO.
70-7-04
REVISION
DATE I APPR
SUIT&YED:
DESIGNED:
R H STEVENS
DRAWN:
J E HAYWOOD
CHECKED:
R H STEVENS
APPROVED:
R H STEVENS
SCALE
1 = 20
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL• NAVD 1988
HORIZONTAL NAD 198311991
Ali:��
DATUM
CONTOUR INTERVAL
TWO FOOT CONTOUR INTERVAL
VERTICAL DATUM
CITY OF RENTOW NA VD 88
BENCHMARK
BENCH MARKS PER CITY OF RENTON SURVEY ON NA VD 1988 DATUM
PT. 11884 3-%2" BRASS DISC STAMPED "HAFF-1990" ON CONCRETE MONUMENT.
ELEV. .340.93
PT. 11502 4" CONC. MONUMENT W 2" BRASS DISC & PUNCH AT INTERSECTION
MONROE A VE N.E. & N. E. 4TH (M/ COR. SEC. 16) ELEV. 341.39
REFERENCES
1. RECORD OF SURVEY FOR STEVE HARER BY JOHN E. CRAMER IN VOL. 127, PC..
98 REC. NO 9901269002
LEGEND
INLET FlL TER
SEDIMENT POND
CONS TR, UC TION SEQUENCE
1. CONTRACTOR SHALL SCHEDULE AND ATTEND A PRECONSTRUCTION MEETING WITH THE
Cl TY OF REN TON INSPEC TION PERSONNEL B Y PHONING 425- 430- 7200.
2. SURVEYORS SHALL STAKE CLEARING LIMITS IN THE FIELD.
J. INSTALL FILTER FABRIC FENCES AND CONSTRUCTION ACCESS AS SHOWN ON THE PLAN.
4. INSTALL TEMPORARY PIPE FROM CB 5 TO SEDIMENT POND.
5. INSTALL TEMPORARY SEDIMENT POND WITH STANDPIPE.
6. CLEARING AND GRADING MA Y NOW COMMENCE.
7. DURING THE GRADING PROCESS, THE CON TRA C TOR SHALL PA Y SPECIAL A TTEN TION
TO MAINTAINING FIL TER FABRIC FENCES.
8. UPON COMPLETION OF GRADING, EXPOSED AREAS SHALL BE HYDROSEEDED AS
SOON AS POSSIBLE.
9. INSTALL UTILITIES AND ROAD IMPROVEMENTS PER THEIR RESPECTIVE PLANS ONCE
THE SI TE IS TO GRADE.
10. CONSTRUCT INLET FIL TERS A T THE CA TCH BASINS AS UTILITY INSTALLA TION ALLOWS
AND/OR UPON FINISH GRADING.
11. DIRECT RUNOFF TO THE INLET/SUMP FIL TERS. CLEAN SUMPS AND STORM DRAINAGE
UTILI TIES AS NECESSAR Y.
12. ONCE FINAL GRADING IS COMPLETE, HYDROSEED, LANDSCAPE OR SOD ALL REMAINING
EXPOSED AREAS.
13. FLUSH PERMANENT STORM DRAINAGE SYSTEM.
14. TERMINA TE EROSION CON TROL FA CIL I TIES WHEN PERMANEN T FA CIL I TIES A RE COMPL ETE
AS REQUIRED FOR PA I/ING. THE REMAINING EROSION CONTROL FAC.iLITIES MA Y BE
TERMINATED WHEN ALL CONSTRUCTION, LANDSCAPING, AND CLEAN-UP ARE COMPLETE
AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED.
1?qbV31fP1P
SCALE: 1" = 20'
0 10 20 40
CHECKED FOR COMPLIANCE
TO CITY STANDARDS
�C Date
Date
Date
CITY OF STOR-HOUSE SELF STORAGE 08/18/04
�r FIELDBOOK:
R E N TO N EROSION CONTROL PLAN PAGE
Planning/Building/Public Works Dept.
C2.01