Loading...
HomeMy WebLinkAboutTED4003203.4rl J U LLI O pli X O2J W W z Z Z Y V > x a Q Q I w Q z GENERAL NOTE 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CITY OF RENTON CODE, KING COUNTY ROAD STANDARDS (KCRS), KING COUNTY SURFACE WATER DESIGN MANUAL (KCSWDM) AND THE CONDITIONS OF PRELIMINARY SUBDIVISION APPROVAL. IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE PROFESSIONAL CIVIL ENGINEER TO CORRECT ANY ERROR, OMISSION, OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THESE PLANS, ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST OR LIABILITY TO THE CITY OF RENTON. 2. THE DESIGN ELEMENTS WITHIN THESE PLANS HAVE BEEN REVIEWED ACCORDING TO THE CITY OF RENTON, SOME ELEMENTS MAY HAVE BEEN OVERLOOKED OR MISSED BY THE CITY PLAN REVIEWER. ANY VARIANCE FROM ADOPTED STANDARDS IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY OF RENTON PRIOR TO CONSTRUCTION, 3. APPROVAL OF THIS ROAD, GRADING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AN APPROVAL OF ANY OTHER CONSTRUCTION (E.G., DOMESTIC WATER CONVEYANCE, SEWER CONVEYANCE, GAS, ELECTRICAL, ETC.), 4, BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRECONSTRUCTION MEETING MUST BE HELD BETWEEN THE CITY OF RENTON, THE APPLICANT, AND THE APPLICANTS CONSTRUCTION REPRESENTATIVE. 5, A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS, 6. CONSTRUCTION NOISE SHALL BE LIMITED IN ACCORDANCE WITH KING COUNTY CODE (SECTION 12.88); NORMALLY, THIS IS 7A.M. TO 10 P.M, ON WEEKDAYS AND 9 A.M. TO 10 P.M. ON WEEKENDS. 7. IT SHALL BE THE APPLICANT'S/CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL CONSTRUCTION EASEMENTS NECESSARY BEFORE INITIATING OFF --SITE WORK WITHIN THE ROAD RIGHT-OF-WAY. 8. FRANCHISED UTILITIES OR OTHER INSTALLATIONS THAT ARE NOT SHOWN ON THESE APPROVED PLANS SHALL NOT BE CONSTRUCTED UNLESS AN APPROVED SET OF PLANS THAT MEETS ALL REQUIREMENTS OF THE CITY OF RENTON IS SUBMITTED TO CITY INSPECTION SECTION THREE DAYS PRIOR TO CONSTRUCTION. 9, DATUM SHALL BE NAVD 1988 UNLESS OTHERWISE APPROVED BY DOES. 10. GROUNDWATER SYSTEM CONSTRUCTION SHALL BE WITHIN A RIGHT-OF-WAY OR APPROPRIATE DRAINAGE EASEMENT, BUT NOT UNDERNEATH THE ROADWAY SECTION. ALL GROUNDWATER SYSTEMS MUST BE CONSTRUCTED IN ACCORDANCE WITH SECTION B15.02 OF THE APWA STANDARD SPECIFICATIONS. 11. ALL UTILITY TRENCHES SHALL BE BACKFILLED AND COMPACTED TO 95 PERCENT DENSITY. 12, ALL ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO 95 PERCENT DENSITY (WSDOT 2-06.5). 13. OPEN CUTTING OF EXISTING ROADWAYS IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY OF RENTON AND NOTED ON THESE APPROVED PLANS. 14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACTOR. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AT LEAST ONE FLAGGER FOR EACH LANE OF TRAFFIC AFFECTED. SECTION 1-07.23, "TRAFFIC CONTROL," OF THE WSOOT STANDARD SPECIFICATIONS SHALL APPLY IN ITS ENTIRETY. 1, BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRECONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON DEVELOPMENT SERVICES DIVISION, CONSTRUCTION SERVICES (277-5570). 2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE "STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION" PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION {APWA) AS AMENDED BY THE CITY OF RENTON, 3. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS WHICH ARE ON FILE WITH THE CITY OF RENTON. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE CITY OF RENTON DEVELOPMENT SERVICES DIVISION. 4. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 5, DATUM SHALL BE U.S.C. AND G.S. UNLESS OTHERWISE APPROVED BY THE CITY OF RENTON. REFERENCE BENCH MARK AND ELEVATION ARE NOTED ON THE PLANS. 6. ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED. 7, ALL RETENTION/DETENTION/INFILTRATION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN CONJUNCTION WITH ALL CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE DEVELOPMENT SERVICES DIVISION. 8. GRASS SEED MAY BE APPLIED BY HYDROSEEDING. THE GRASS SEED MIXTURE, OTHER THAN CITY OF RENTON APPROVED STANDARD MIX, MUST BE SUBMITTED BY A LANDSCAPE ARCHITECT AND APPROVED BY THE DEVELOPMENT SERVICES DIVISION, 9. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7--02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORM DENSE, UNYIELDING BASE. ALL PIPE BEDDING SHALL RE APWA CLASS "C" WITH THE EXCEPTION OF PVC PIPE. ALL TRENCH BACKFILL SHALL BE COMPACTED TO MINIMUM 95 PERCENT FOR PAVEMENT AND STRUCTURAL FILL AND 90 PERCENT OTHERWISE PER ASTM D-1557-70. PEA GRAVEL BEDDING SHALL BE 6 INCHES OVER AND UNDER PVC PIPE. 10. GALVANIZED STEEL PIPE AND ALUMINIZED STEEL PIPE FOR ALL DRAINAGE FACILITIES SHALL HAVE ASPHALT TREATMENT #1 OR BETTER INSIDE AND OUTSIDE. 11. STRUCTURES SHALL NOT BE PERMITTED WITHIN 10 FEET OF THE SPRING LINE OF ANY STORM DRAINAGE PIPE, OR 15 FEET FROM THE TOP OF ANY CHANNEL. 12. ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10-FOOT BELOW PAVEMENT LEVEL. 13. OPEN CUT ROAD CROSSINGS THROUGH EXISTING PUBLIC RIGHT-OF-WAY WILL NOT BE ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY OF RENTON, 14, ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A DEPTH OF ONE FOOT AND MUST MEET THE FOLLOWING SPECIFICATIONS: 4"-8"/40%-70% PASSING; 2"-4" ROCK/J09.-407. PASSING; AND 2" ROCK/10%-20% PASSING. 15. ALL BUILDING DOWNSPOUTS AND FOOTNG DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM UNLESS APPROVED BY THE DEVELOPMENT SERVICES DIVISION. AN ACCURATELY DIMENSIONED CERTIFIED AS --BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE SUBMITTED TO THE CITY OF RENTON UPON COMPLETION. 16. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMIT BY THE CITY OF RENTON DOES NOT RELIEVE THE OWNER OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY CONNECTED WITH STORM SURFACE WATER DISPOSITION. FURTHER, THE CITY OF RENTON DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDED DURING CONSTRUCTION, 17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACT. ANY WORK WITHIN THE TRAVELED RIGHT-011 THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AN APPROVED TRAFFIC CONTROL PLAN BY THE TRANSPORTATION DIVISION, ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-07-23. TRAFFIC CONTROL, SHALL APPLY. 18. SPECIAL DRAINAGE MEASURES WILL BE REQUIRED IF THE PROJECT LOCATION IS WITHIN THE AQUIFER PROTECTION AREA. Td0 - toe -- jjw3 TERNATE 1 SIDEWALK AND PLANTER STRIP 2 (TYP) Z Q�- O ® A DRIVEWAY OR ALLEY SEE ZONING CODE FOR s FOR MAX & MIN WIDTHS /! J" COMMERCIAL ZONE RESIDENTIAL ZONE 2 (n•P) oP��P��, PQxj��P�Q o /12 A ALTERNATE 2 4 SIDEWALK NEXT TO CURB NO PLANTER 10" COMMERCIAL ZONE ( STRIP ) 6" RESIDENTIAL ZONE THICKENED BASE OF CURB & GUTTER TO MATCH APPROACH THICKNESS NOTES: ON COMMERCIAL APPROACHES. (TYP) 1. DUMMY JOINTS SHALL BE PLACED NOT TO EXCEED 15' C/C NOR LESS THAN 10' C/C. THEY SHALL NOT BE LESS THAN 3/16" IN THICKNESS AND SHALL BE 2-1/4" DEEP. 2. 1/2" THRU JOINTS SHALL BE PLACED AT BACK, SIDES AND FRONT (BEHIND CURB) OF APPROACH, AND IN CURB/GUTTER TO DUMMY JOINTS. 3. CEMENT CONCRETE SHALL BE CLASS 3000 AIR ENTRAINED. 4, ALL JOINTS SHALL BE CLEANED AND EDGED. 5. APPROACH SHALL NOT BE POURED INTEGRAL WITH CURB AND GUTTER, BUT MAY BE POURED INTEGRAL WITH STANDARD CURB (SEE DETAIL "A"). 6. SUBGRADE COMPACTION SHALL BE 95% MODIFIED PROCTOR. 7, APPROACH CENTERLINE TO MATCH THE DRIVEWAY/ALLEY CENTERLINE. THE APPROACH WIDTH WILL BE 10' WIDER THAN THE DRIVEWAY/ ALLEY WIDTH. h.DWG. FRO1 N N.T.S. Rmp-3703" 1" CURB AND GUTTER SHOWN HOWEVER, OTHER CURBS MAY BE USED. (SEE STANDARD PLANS) 6' MIN w = c> (o m U � m Q U SEE DETAIL "A" SECTION A A 6" JOINT 3/16' SCORE LINE 18„ DE- IL A APPROACH WITH MONOLITHIC CURB SEE NOTE 5 - - - - -li__ DRIVEWAY LOCATION NOT TC RECOMMENDED FOR APPROVAL BY: ATE: BY: DATE: BY: DATE: f. Call 2 Working Days Before You Dig 1-800-424-5555 Utilities• • • • Location Center • REVISIONS NO. DESCRIPTION/DATE _ i - - ------- - Z O F- 0 _Z J b _j Oz V) w 0 z CIO >. m L Q � 0 > < Er W 0 z 2 Lij �t R - rn ,n V) M 0CV4� v C� a: uJ 0 a v Uj Kw- V a C C ® U J J Z s Z� Uj 4° t a`s N v Z c:' rn A � U W E >� 3 O 0 0 V) C 0 Z Z° __ > as 43) r 'U 0 � U� r U) m E to Q3 3 �. 3 vY C L C0 Cc w0 Ud -A CS WASII*' <tn 22884 ASS O NAL (_C EXPIRES 10/19/05 i JOB NO.: 994-005-6u. DWG. NAME: DT-0' DESIGNED BY: F DRAWN BY: CJR CHECKED BY: DATE: 1 1 -QO 1 - ' TE OF N T: DT-01 6 V SHEETS SCANNED APR Z 2 f-