Loading...
HomeMy WebLinkAboutWTR2703206.30 WATERMAIN NOTES AND DETAILS z 0 0 Y Z O U o z 3 w � a o vsi cj) J_ cr Q to H wz Q w w � U zz U O Q Er w �v w=Om O L- O zZ U Z O w av a � J 0 > E— Q U co �z a O w L +; O a� vv 0 n rr� T U) 0 � of r�w � W o 0- c� M E w Q ► folmE E O, � °1.— c IV ri c v ° m m o am 0 D zZ Q Q cai �z w� cl 0 _> J Z z � O U z O a o II eN J r W a I _ U N 0 w w 0 z o Z o o w Y U 0 w > C Q ry m m m m m a y!iy Y Y Y Q m,0 0 0 0 w N N (V \ \ 1 O 0l - iQ IL N x 4mN �m'�c33 m CL Y m m n EZ U U a C u) v) cn z 0 U 0 0 N 2 III Z cn 2 O z p Q I (>n V n 0 a' U j o'It w. 0 c 13- ''; w w w o_ o_ o_ v) c E E�j w Q z in r7 NH ci w EXISTING WATER LINE TESTING DETAIL PLAN VIEW :-W WATER LINE PSEE NOTES VERTICAL CROSS (MJxFL) FOR POL YPIGGING ONE BLIND FLANGE ON TOP WITH 2" TAP & 2" PLUG (MJ) ONE BLIND FLANGE ON BOTTOM ONE 2" TEMPORARY BLOW -OFF TEMPORARY BLOCK CUT -IN (BY CITY FORCES) - TEE (FLxFL) W/ CONC. BLOCK 3- GATE VALVES (FLxMJ) 2- SOLID SLEEVES (MJ) OR RO-MAC COUPLINGS 1- PLUG (MJ) W/2 "TAP & TEMP. BLOW -OFF TEMP. BLOCK EXISTING WATER LINE �- EXISTING WATER LINE NOTES: CONTRACTOR SHALL POTHOLE AND VERIFY THE HORIZONTAL AND VERTICAL ALIGNMENT OF EXISTING LINE OR STUB AND SHALL START LAYING THE NEW LINE AT THE SAME HORIZONTAL AND VERTICAL ALIGNMENT OF THE EXISTING STUB. CITY FORCES WILL PERFORM THE FINAL CONNECTION FROM THE NEW LINE TO THE EXISTING STUB WITH D.I. SLEEVE AND D.I. SPOOL CITY OF RENTON, WATER CONNECTION DETAIL -,--�3 VALVES CUT —IN INSTALLATION NOT TO SCALE FINISHED GRADE ELEVATION 3 FT MIN. COVER (10-INCH DIAMETER AND UNDER) 4 FT MIN. COVER (12-INCH DIAMETER AND OVER) NEW WATER MAIN F___ POLYPIG 1 TEMPORARY 2" GALVANIZED PIPE AND 2" GATE VALVE INSTALL 2" PLUG ON TOP BLIND FLANGE AFTER REMOVAL OF POLYPIG w. a VERTICAL CROSS FOR POLYPIGGING STATION. SIZE OF VERTICAL CROSS SHALL BE THE SAME AS SIZE OF MAIN LINE VERTICAL CROSS (MJ X FL) ONE BLIND FLANGE ON TOP OF CROSS WITH 2" TAP & 2" TEMPORARY BLOW -OFF ASSEMBLY (REMOVE BLOW -OFF ASSEMBLY AND INSTALL 2" PLUG AFTER REMOVAL OF CLEANING "POLY -PIG") ONE BLIND FLANGE ON BOTTOM OF CROSS ONE PLUG (MJ) ON END OF CROSS CONCRETE BLOCKING ALL DEBRIS AND POLYPIGS SHALL BE REMOVED FROM SUMP OF VERTICAL CROSS BEFORE DISINFECTION OF NEW WATER MAIN CITY OF RENTON, WATER MAIN POLYPIGGING STATION VERTICAL CROSS FOR POLYPIGGING OT TO SCALE FINAL CONNECTION DETAIL NEW WATER LINE SEE NOTES AFTER ALL TESTING, CLEANING BY POLYPIG, AND DISINFECTION, REMOVE TEMP. BLOCK & BLOW -OFF & CONNECT WITH SLEEVE (MJ) & D.I. SPOOLS FINAL CONNECTION BY CITY FORCES EXISTING WATER LINE II TAPPING TEE (MJxFL) TAPPING GATE VALVE (FL XMJ) TEMPORARY PLUG (MJ) WITH 2-INCH TAP AND 2-INCH BLOW -OFF ASSEMBLY CONCRETE BLOCKING TESTING DETAIL jo cr EXISTING D.I. WATER LINE 2 LINE vanin-AL unvaa tmJxrc/ FOR POLYPIGGING ONE BLIND FLANGE ON TOP WITH 2" TAP & 2" PLUG (MJ) ONE BLIND FLANGE ON BOTTOM ONE 2" TEMPORARY BLOW -OFF TEMPORARY BLOCK FINAL CONNECTION DETAIL AFTER ALL CLEANING BY POLYPIG, PRESSURE TESTING AND DISINFECTION, REMOVE TEMPORAY BLOCK & BLOW -OFF AND CONNECT TO VALVE WITH D.I. SLEEVE (MJ) & D.I. SPOOLS FINAL CONNECTION BY CITY FORCES TESTING DETAIL 18 FT NEW D.I. WATER LINE REMOVE PLUG 12"X10" REDUCER (FLXMJ) VERTICAL CROSS (MJxFL) FOR POLYPIGGING 10" GATE VALVE (MJXFL) ONE BLIND FLANGE ON TOP WITH 2" TAP & 2" PLUG (MJ) TEMPORARY PLUG (MJ) WITH 2-INCH TAP ONE BLIND FLANGE ON BOTTOM AND 2-INCH BLOW -OFF ASSEMBLY ONE 2" TEMPORARY BLOW -OFF CONCRETE BLOCKING TEMPORARY BLOCK NOTES. 1. TAPPING TEES SHALL BE MADE OF CAST IRON, DUCTILE IRON OR EPDXY - COATED STEEL. 2. NO SIZE ON SIZE TAPS ON CAST-IRON WATER LINES. TAP SHALL BE AT LEAST 2" SMALLER DIAMETER THAN THE EXISTING MAIN. J. NO WET TAP ON ASBESTOS CEMENT LINE OR STEEL LINE 4. WET -TAP SHALL BE DONE ONLY BY CITY -APPROVED CONTRACTORS CITY OF RENTON WATER LINE CONNECTION DETAIL TO SCALE NOTES. 1. TAPPING TEES SHALL BE MADE OF CAST IRON, DUCTILE IRON OR EPDXY - COATED STEEL. 2. NO SIZE ON SIZE TAPS ON CAST-IRON WATER LINES. TAP SHALL BE AT LEAST 2" SMALLER DIAMETER THAN THE EXISTING MAIN. J. NO WET TAP ON ASBESTOS CEMENT LINE OR STEEL LINE 4. WET -TAP SHALL BE DONE ONLY BY CITY -APPROVED CONTRACTORS CITY OF RENTON WATER LINE CONNECTION DETAIL OT TO SCALE FINAL CONNECTION DETAIL NEW D.I. WATER LINE AFTER ALL CLEANING BY POLYPIG, PRESSURE TESTING AND DISINFECTION, REMOVE TEMPORAY BLOCK & BLOW -OFF AND CONNECT TO VALVE WITH D.I. SLEEVE (MJ) & D.L SPOOLS FINAL CONNECTION BY CITY FORCES By: By: O Q) ct RECOMMENDED FOR APPROVAL 4111-1 7 REVISED PER ASBUILT CK AS 6/1/05 \� A H y 6 ADDED HANDRAIL AND LANDSCAPE NOTE PER CITY BW DKB 11/09/04 5 REVISED PER CITY REVIEW COMMENTS PRA DKB 10/27/04 4 REVISED PER CITY REVIEW COMMENTS KIB DKB 9/22/04 o� 72 �o �� /DNA L LNG 3 REVISED PER REVIEW COMMENTS LK AS 8/01/04 2 REVISED PER CITY REVIEW COMMENTS BSW AS 2/12/04 1 ADDED FIRELINE TO BUILDING BW AS 1/19/04 EXPIRES 9 23 05 NO. REVISION BY APPR. DATE Date: m Date: - 'aC Date — Date CITY OF REN DEPARTMENT OF PU cl) J Qlzi) W W Q w U w Z Z U Q O w1 w IL O Q 0 LL O h5 U 0-Z O J z_ Q U a -1 o�c w W � � O J O UO J J LL J r W O) N Lo W Qcp r a Z OD W W W a J O Z 0 Q co a: W � co tea. \O Uw 0 0 r L'J �-- Z > ® g V o_ J X Q z w z w gZ >Q N rr) N N CD N 00 z- z 00 CN 0�0 w w N I I w nn Z_ � , CN = w u L J N Z / N N 00 Y J a_ U ccn V> Z ♦ i z w V 0 - 40 G0 TON BLIC WORKS DESIGNED AS DRAWN PRA DATE 10/27/04 FILE NO. _ CHECKED AS SCALE 1 p=4O� FIELD BOOK PAGE____ APPROVED C16` 16 oiREcroR of PUBLIC WORKS SHEET OF I C) 6 o 0 X 0 T E 0 II a� C) U 0 0 N O Qo O E 0 0 I 0 0 i 0 I C Q) c LiJ i Q) 0D co 0 0 a_ Q) Li If- 0 mks A'S - -,Z- 320c�,0 7