Loading...
HomeMy WebLinkAboutWTR2703214.11PROPOSED UTILITY METER. METER BASE AND ENCLOSURE BY CONTRACTOR TO SERVING UTILITY REQUIREMENTS. METER BY PUGET SOUND ENERGY. PRIMARY SERVICE PER SERVING UTILITY P1 REQUIREMENTS. PROPOSED PAD -MOUNTED I ONL- 0NNECTED EQUIPMENT IS SHOWN ON THE ONE -LINE DIAGRAM. S E ; F� u�I= DWG N0, E05 : �:R COMPLETE PANEL SCHEDULE. J, I TRANSFORMER INSTALLED 120/24OV, ( 2 20012 BY PUGET SOUND ENERGY, 103-W I �--~ TM INSTALL PER SERVING P3 50/2 UTILITY STANDARDS. SEE TM PROPOSED ELECTRICAL SITE EMERGENCY GENERATOR PLAN FOR MORE 117' INFORMATION. PROPOSED 50 AMP GENERATOR I CONNECTION RECEPTACLE I � � Imo: #6 BARE COPPER GROUND L- n ELECTRODE CONDUCTOR TO I GROUND ELECTRODES PER N.E.C. SEE DWG NO. E04 FOR GROUNDING DETAILS. PROPOSED GROUND RODS (TYPICAL) PER N.E.C. SEE DWG NO. E04 FOR GROUND ROD �- — — — DETAIL. INSIDE 7 20/1 20/1 TM RESERVOIR LIGHTING OUTDOOR LIGHTING ---- --- 30/2 20/1 TVSS TM TM SEISMIC CONTROL VALVE F 20/T 20/1 TELEMETRY PANEL VENTILATION FAN TM 20/1 20 TM BUILDING LIGHTING -.: BUILDING RECEPTACLESTM 20%�- 20s1 ;. RESERVOIR RECEPTACLES EE MOTORIZED GATE OPERATOR TM , 20/T-- SEWER TELEMETRY =( METER VAULT SUMP PUMP fT-M --._ e 20/1____ TM OUTDOOR LT. CNTRL. PNL. 1 20/fi-TM SEISMIC VLT. SUMP PUMP GND BUS NEUTRAL �--- - ONE -LINE DIAGRAM NO SCALE 10'-O" 4" PC' € GFI 1'-6" pg P8 r P7 Al Al 20A» " "LA-1" G L TO OUTDOOR I M ! \� WP LIGHTING CONTROL I »L» 1 PANEL A2 - _. 0 I j I GFI _ k j III i j I SINGLE GANG BOX SURFACE MOUNTED TO WALL ©1 TO OUTDOOR LIGHTING CONTROL PANEL s''• C1 PROPOSED TELEMETRY r PANEL, "RTU", BY OTHERS. INSTALLED BY CONTRACTOR. I ^__Al s A1; PROVIDE AND INSTALL C3 GFI DOOR KICK -STOP "RTU" D „L„ I C2 � i C6 11 C9 O "RTU"' o 0 C10 J1 C4 CONTINUTED TO SEISMIC ". „ CONTROL PANEL 0 PROPOSED .P 5 LIGHTING 6 4 P6 PANELBOARD, »L„ ___ M; 9 „» 3 I?B P4 , Z2 20A I J2 C5 P2 I L i'-10„ 2 n �I P13 P14 PROPOSED J P17 UTILITY METER I_ ---._ 21 24 P3 P11 P1 20 J4 P10 / J5 19 19 �1 ELECTRICAL BUILDING ELECTRICAL PLAN 1 j2" = 1'-0" PROPOSED SEISMIC CONTROL PANEL 6'-0" x 6 A 0 DOUBLE E PROPC FF D EDGE OF PRECAST WALL CONCRETE FOOTING C 16" 3" 2» 4 , CAST-IN-PLAC NOT TO SCALE iJL' ` ILJ. ELECTRICAL NOTES 4LD H. xA SEE DWG NO. E05 FOR ELECTRICAL EQUIPMENT AND INSTRUMENTATION SCHEDULE. 2, THE CONTRACTOR SHALL REMOVE ?HE TOP 6" OF NATIVE MATERIAL. THE SUBGRADE SHALL BE INSPECTED BY THE OWNER'S REPRESENTATIVE PRIOR TO PLACEMENT OF i ✓' ; GRAVEL TO ENSURE THAT IT IS FIRM AND UNYIELDING. AT THE REPRESENTATIVE'S DISCRETION, ANY SOFT SPOTS SHALL BE EXCAVATED AND REPLACED WITH CLEAN CRUSHED 16 - 727 ROCK IF OVER EXCAVATED DEPTH IS LESS THAN 24" THICKNESS OR CDF IS GREATER THAN 24", THE CONTRACTOR SHALL PROVIDE NOTICE FOR INSPECTION OF SUBGRADE THREE WORKING DAYS PRIOR TO PLACEMENT OF GRAVEL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXPOSED SUBGRADE TO ENSURE A FIRM ANDdals'aaa°� UNYIELDING SURFACE. TONAL r 3. SEAL ALL PENETRATIONS WATERTIGHT AND PROVIDE FLASHING 'WHERE APPLICABLE, PROVIDE ALUMINUM BUG SCREEN AT ALL VENTS. SIGNED: 061291074. CONTRACTOR SHALL COORDINATE WITH PREFAB CONCRETE BUILDING MANUFACTURER TO LOCATE AND PROVIDE BLOCKOUTS FOR CONDUIT AND HVAC. CORE DRILLING IN FIELD SHALL NOT BE ALLOWED UNLESS PREVIOUSLY COORDINATED WITH MANUFACTURER. IIJ I PROPOSED SECONDARY SERVICE TO PROPOSED UTILITY TRANSFORMER CONNECTION. SEE PROPOSED ELECTRICAL SITE PLAN FOR CONTINUATION. 6. PROPOSED MOTORIZED INTAKE LOUVER ACTUATOR, "LA-1", 120 VAC, 10. SEE DWG NO. E05 FOR LOUVER AND DAMPER SCHEDULE. �i7 7. PROPOSED EXHAUST FAN, "EF-1", 120 VAC, 10. SEE DWG NO. E05 FOR VENTILATOR SCHEDULE. XXX 8. SEE DWG NO. E05 FOR CONDUIT AND CONDUCTOR SCHEDULES. i Al 9. SEE LIGHTING FIXTURE SCHEDULE ON DWG NO. E05. SIGNED: 06/29/07 10. CONDUIT AND CONDUCTORS TO THE PROPOSED RESERVOIR LEVEL TRANSMITTER, SEE PROPOSED ELECTRICAL SITE PLAN FOR CONTINUATION. SEE DWG N0, E03 AND E04000 FOR DETAILS. �1 11. CONDUIT AND CONDUCTORS TO THE RESERVOIR OVERFLOW FLOOD SWITCH AND INTRUSION SWITCHES. SEE PROPOSED ELECTRICAL SITE PLAN FOR CONTINUATION. SEE DWG NO. E03 AND E04 FOR DETAILS, RESERVOIR ACCESS HATCH INTRUSION ALARM — RESERVOIR OVERFLOW ALARM 12. CONDUIT AND CONDUCTORS TO THE RESERVOIR VANDAL SHIELD INTRUSION SWITCH, SEE PROPOSED ELEU TRICAL SITE PLAN FOR CONTINUATION. SEE DWG NO. E03 FOR I DETAILS. 13, CONDUIT AND CONDUCTORS TO THE INLET AND OUTLET FLOW METER AND VAULT FLOOD SWITCH LOCATED IN THE FLOW METER VAULT, SEE PROPOSED ELECTRICAL SITE PLAN FOR CONTINUATION. SEE DWG NO. E03 AND E04 FOR DETAILS. - RESERVOIR INLET FLOW (4-2OmA) - RESERVOIR INLET FLOW (TOTALIZER) - RESERVOIR INLET FLOW METER POWER (24 VDC) - RESERVOIR OUTLET FLOW (4-20mA) - RESERVOIR OUTLET FLOW (TOTALIZER) I - RESERVOIR OUTLET FLOW METER POWER (24 VDC) - METER VAULT FLOOD SWITCH (' 14. CONDUIT AND CONDUCTORS TO SEISMIC VALVE VAULT FLOOD SWITCH LOCATED AT THE SEISMIC ISOLATION VALVE VAULT. SEE PROPOSED ELECTRICAL SITE PLAN FOR ° CONTINUATION. SEE DWG NO. E03 AND E04 FOR DETAILS. - SEISMIC VALVE VAULT FLOOD SWITCH z 15. CONDUIT AND CONDUCTORS TO ACCESS GATE MOTORIZED OPERATOR, SEE PROPOSED ELECTRICAL SITE PLAN FOR CONTINUATION. O 16. PROPOSED CONDUIT CONTAINING CONDUCTORS TO RESERVOIR LIGHTING AND RECEPTACLE LOCATED AT THE TOP OF THE RESERVOIR, SEE PROPOSED ELECTRICAL SITE PLAN FOR CONTINUATION. SEE DWG NO, E03 AND E04 FOR DETAILS. 7 17. PROPOSED CONDUIT CONTAINING CONDUCTORS TO SEWER TELEMETRY RECEPTACLE LOCATED AT THE TOP OF THE RESERVOIR. SEE PROPOSED ELECTRICAL SITE PLAN FOR f CONTINUATION. SEE DWG NO. E03 AND E04 FOR DETAILS. 8 18. PROPOSED CONDUIT AND CONDUCTORS TO SITE LIGHTING. SEE PROPOSED ELECTRICAL SITE PLAN FOR CONTINUATION. SEE DWG N0, E03 AND E04 FOR DETAILS. 19. SPARE CONDUITS. SEE PROPOSED ELECTRICAL SITE PLAN AND THE CONDUIT ,AND CONDUCTOR SCHEDULE ON DWG NO. E05 FOR MORE INFORMATION. 20 20. CONDUIT AND CONDUCTORS TO SEISMIC SOLENOID CONTROL VALVE AND LIMIT SWITCH LOCATED AT THE SEISMIC ISOLATION VALVE VAULT, SEE PROPOSED ELECTRICAL SITE (0-- PLAN FOR CONTINUATION, SEE DWG NO. E03 AND E04 FOR DETAILS. - VALVE OPEN FALL - VALVE CLOSE CALL � - VALVE FULL CLOSED STATUS - VALVE FULL OPEN STATUS ' I I 21 21, PROPOSED 50 .AMP, 2-POLE, EMERGENCY GENERATOR, BACK -FED CIRCUIT BREAKER. PROPOSED CIRCUIT BREAKER SHALL BE MANUALLY INTERLOCKED TO MAIN SERVICE M� DISCONNECT TO PREVENT BOTH CIRCUIT BREAKERS FROM BEING ENERGIZED AT THE SAME TIME, 22 '` 22. PROPOSED OUTDOOR LIGHTING CONTROL PANEL. SEE DETAIL ON DWG NO. E06. 123 23. CONDUIT AND CONDUCTORS TO METER VAULT SUMP PUMP RECEPTACLE. SEE PROPOSED ELECTRICAL SITE PLAN FOR CONTINUATION. w- I 2� i 24, CONDUIT AND CONDUCTORS TO SEISMIC VALVE VAULT SUMP PUMP RECEPTACLE. SEE PROPOSED ELECTRICAL SITE PLAN FOR CONTINUATION, 4" .___._I : 4 � N T� PROPOSED INTAKE_­'2,ENGINEERING, INC. 4" THICK CONCRETE LOUVER SYSTEM 12" L, www.rh2.com ENTRANCE LANDING WITH �� 12"H, 4"D}. MOTOR �-h2.com 4x4 W1.4xW1.4 WWM. PROVIDE MIN, 6" THICK 8052 GRAVEL BASE COMPACTED TO AND THERMOSTAT 95% OF MAXIMUM DRY PROVIDED WITH� _EMBEDDED ANGLE OR BELLINGHAM OFFICE DENSITY PER ASTM D1557 PRE -FABRICATED CHANNEL, CONTINUOUS 36c.676.0836 (STANDARD PROCTOR) BUILDING. 454 ''Rest Horton Road BOTHEL.L OFFICE OPOSED GENERATOR` 425.951.54-00 NNECTION RECEPTACLE Zia MIN. % 1' t 2» 12100 NE 195th Street, Suite 1& D. .. . EAST WENATCHEE dFFIC>= A A _- -_- 509.886.2900 DEPTH SPLIT CAST -IN -PLACE" ANCHOR PLATE �0 on Sheet. Su to 5 ACED CMU WALLS .4 4. W/ (2) r06" A307 BOLTS WELDED 0 ORCHARD OFFICE TO PLATE, TYP EA CORNER OF BLDG. 1-6.7960 POSED UTILITY METER. 00 K:+,sae Street, su+te 101 -ALL PER SERVING UTILITY (2) #5 CONTINUOUS UIREMENTS. GRIND SPLIT E BLOCK SMOOTH FOR r �,ONTINUOUS CONCRETE �' ELECTRI AL BUILDING �. SECTION A UNDISTURBED NATIVE MATERIAL, PROOF -ROLLED SCALE: SHOWN fNTING OF ALL OUTDOOR 1" 0 2" ICES, TYP. FOUNDATION PER - 1 /2" _ 1'-0" BUILDING DRAWING IS NOT TO SCALE RED MANUFACTURER DING, IES, INC. )NS FOR ­�4 W=321434 REVISED TO CONFORM 7/7 TRUC ION CORDS 06 08 09 RH2 ENGINEERING INS DATE s REVISED TO CONFORM TO CONSTRUCTION RECORDS ADDENDUM / ISSUED FOR CONSTRUCTION No, REVISION 4 IF BAR 1S NOT 2" LONG PLOT. 24 DWG No. ENGINEER: CMR E-02 REVIEWED: MLM DATE: SEP 14, 2009 SHEET NO, DY KJS 06/08/09 CLIENT: REN ZO BTE MM 10/09/07 JOB No.: 105-049 734 BY REVIEW DATE I FILENAME: HAZEN—D—ELECO2