HomeMy WebLinkAboutWTR2703214.28PROPOSED
POND
MAINTENANCE
ACCESS ROAD
OUTLINE OF
RESERVOIR
FOOTING
PROPOSED
ACCESS ROAD
PROPOSED ACCESS CORRIDOR
AND OPEN SPACE FOR FUTURE
CELLULAR EQUIPMENT
PROPOSED
C.'HAIN-LINK -
PROPOSED
.ACCESS GATE
MOTOR OPERATOR
PROPOSED GATE ENTRY KEYPAD AND PEDESTAL, SEES, �b FOR
DETAILS, STUB UP TELEMETRY CONDUIT TO KEYPAD FOR FUTURE
USE.
PROPOSED BUILDING PAD FOR
ELECTRICAL BUILDING, SEE��
FOR DETAILS
PROPOSED 10'xl6'
PRE -CAST ELECTRICAL
BUILDING. SEE DWG NO.
E02 AND SPECIFICATIONS
FOR DETAILS.
j4
7
IIIIIIIII01
4t�
LOCATE CLEAR OF PROPOSED
FENCE
0- Aaft
'00w 40w, w ww.,
6
/10 4
SE 03, TOWNSHIP 23, RANGE 05
ELECTRICAL NOTES
1. SEE DWG NO. E05 FOR CONDUIT AND CONDUCTOR SCHEDULES,
2 2, PROPOSED PAD -MOUNT TRANSFORMER PROVIDED AND INSTALLED
BY ELECTRICAL UTILITY. CONTRACTOR SHALL PROVIDE EXCAVATION
AND RESTORATION FOR INSTALLATION OF PAD -MOUNT
TRANSFORMER AND TRANSFORMER VAULT PER PUGETSOUND
ENERGY REQUIREMENTS, ELECTRICAL UTILITY SHALL PROVIDE AND
INSTALL PAD -MOUNT TRANSFORMER AND VAULT. ELECTRICAL
UTILITY SHALL CONNECT CONDUCTORS TO THE PRIMARY AND
SECONDARY SIDE OF THE TRANSFORMER.
F
13
335, PROPOSED OUTDOOR AREA LIGHT. SEE DWG NO. E06 FOR
OUTDOOR AREA LIGHT DETAILS.
i A
4, EXISTING UTILITY POLE. ELECTRICAL UTILITY SHALL INSTALL
CONDUIT AND CONDUCTORS ON EXISTING UTILITY POLE BETWEEN
THE PRIMARY POWER CONNECTION ON THE TOP OF THE POLE AND
THE PROPOSED PRIMARY POWER HANDHOLE AT THE BASE OF THE
POLE, THE ELECTRICAL UTILITY SHALL PROVIDE AND INSTALL A
PRIMARY POWER HANDHOLE AT THE BASE OF THE POLE. THE
CONTRACTOR SHALL PROVIDE EXCAVATION AND RESTORATION FOR
INSTALLATION OF HANDHOLE, THE ELECTRICAL UTILITY SHALL
PROVIDE AND INSTALL PROPOSED PRIMARY POWER CONDUIT AND
CONDUCTORS FROM PRIMARY HANDHOLE TO THE PROPOSED
PAD -MOUNT TRANSFORMER. TRENCHING, BACKFILL, AND
RESTORATION SHALL BE PROVIDED BY THE CONTRACTOR PER PUGE T
SOUND ENERGY REQUIREMENTS. CONTRACTOR SHALL COORDINATE
ALL WORK WITH PUGET SOUND ENERGY.
5 5. PROPOSED SPARE CONDUIT WITH PULL STRING TO PROPOSED
ACCESS GATE ENTRY KEYPAD, CAP AND STUB -UP CONDUIT BELOW
KEYPAD.
6, EXISTING GUY WIRE. CONTRACTOR SHALL RELOCATE EXISTING
GUY WIRE FOR INSTALLATION OF PROPOSED FENCE. CONTRACTOR
SHALL COORDINATE WITH ELECTRICAL UTILITY FOR GUY WIRE
RELOCATION. CONTRACTOR SHALL PERFORM ALL REWORK REQUIRED
FOR RELOCATION OF EXISTING GUY WIRE.
.
PROPOSED SPARE CONDUIT WITH PULL STRING BETWEEN UTILITY
POLE AND ELECTRICAL BUILDING, CAP AND STUB -UP CONDUIT AT
UTILITY POLE 20' ABOVE GRADE AND INSIDE ELECTRICAL BUILDING.
8, PROPOSED SPARE CONDUIT HANDHOLE, HANDHOLE SHALL BE
UTILITY VAULT MODEL NO, 3030-LA OR EQUAL. CONTRACTOR
SHALL PROVIDE EXCAVATION AND RESTORATION ORATION FOR INSTALLATION
OF HANDHOLE PROVIDED AND INSTALLED BY CONTRACTOR,
9. CENTERLINE OF (12) 601 AND (10) 3" PVC ELECTRICAL CONDUITS,
CONDUITS SHALL BE 36-INCHES DEEP AND STUBBED UP
36-INCHES ABO"VE GRADE, 3 FEET FROM EDGE OF DITCH. PROVIDE
CORD PER SPECIFICATIONS AND CAP FOR FUTURE USE. DOCUMENT
CONDUIT POSITION AND DEPTH ON AS -BUILT RECORDS, i
10. ELECTRICAL WORK IS REQUIRED AT THE CITYS HIGHLANDS
RESERVOIR SITE. SEE DWG NO,'S C14 AND C15 FOR MORE
INFORMATION.
NOTE- PROPOSED LANDSCAPING NOT
SHOWN, SEE DWG NO. C07 FOR
PROPOSED SITE AND LANDSCAPING PLAN.
SIGNED; 06,.'29,,,,07
.?&iCWAL
SIGNED.' 061,291-107
z
Uj
-.Mir cn
IN=
w
w
W
cl)
0
am
0
M
t�.
".0
RH2 ENGINEERING, INC.
http://www.rh2.com
mailbox*rh2.com
.800.720.8052
BELLINGHAM OFFICE
360.676.0836
454 West Horton Road
BOTHELL OFFICE
425,951.5400
'2100 NE 195th Street, Suite 100
1:BAST WENATCHEE 0-
509.886.2900
.00 Simon Street, Suite 5
PORT ORCHARD OFF]i_i..
360.876.7960
600 Kiltsap Street, Suite 101
SHOWN
W 3 21416
I
0 1 2"
'PAWING 1'5 NOT TO SCAL:'--
I IF HAP IS NOT 2" LONG,
20
ENGINEER (.,MR C17
,`Er:WEPl KAI KA
SEP 14, 2009
10
REVISED TO CONFORM TO CONSTRUCTION RECORDS I DY KJS 06/08/09 .ILIENT PEN
ADDENDUM / ISSUED FOR CONSTRUCTION BTE MM 10/091/0-7 105-049 )/34
-NAM,
N, 0. REVISION h"Y RFEVIEW I Al' f HA_EN -D-CIV",
J 6:t �
P9,*P*_qFV FI Fr.Tglr.Al RITF P1 AV
A r' f7-
PROPOSED PRIMARY
POWER SERVICE