Loading...
HomeMy WebLinkAboutTED4003245.3O O p N O r7 \ I d r7 N Q n ry O z Q LIJ n O ry U CD L1 Li ~ Q z W V V rJ2r ao C CD �z0 c >x 3 w o IX U2 cli 0 40 z�� a a zo m w~ 0� cE z go, O �o O Z Z0 00 W II o oW Of r- _ a g � 0 W yr R> V s w r a 0 Z o Y w U O asa Q O_ d D --D 7) a_ Q O O w N 2 a co L0 w Ln N w O cf) CD Z o LL J O cu H- � z v oLd �Ri z co O � L, cn- O > - w 73 Of - w CD J 0 U Q Q �CD :E O , m o' cnwZ O 7-1 o' >O o � w o w O i CD O CD �D r� N - Z �J PORTION OF THE N.W. 1/4, OF SEC. 32, TWN 24 N., RGE 5 E., W.M. CITY OF RENTON, WASHINGTON -'5 PPP OFF � � F 6 68 �� 50' BUFFER 18"C 2- ' CED co 0 86. _ erg& I4" 0 5 10 20 30 / � 2'CEDAR -- SI�T �� ` 8"R SCALE 1' = 30' NC-E� ' �2"EI 8„ -g2 1-1 1 ; _ SILT F_�. A R # 32 9 06 TEM-PC � �SEOIMI TRAP- Li00/ 2 EFL LLJ +� 041-Y�, r/- - Y z 18" AR 20" IR 26' PRIVATE ACCESS/UTILITY EASEMEN�°� �- Z I 18"FIR PARCEL # 3224059041 1ov= U I -"FIR FIR 2 4"_-2 ,,U 4" I P 4 �L SILT FENCE v z w ROCKED 11,� CONSTRUCTIONS� ENTRANCE 11 S EX.8'SEWER E 'OLE CATCH BASIN 13 RIM=117.93 INV=115.63,12"ADS S STORM MANHOLE RIM=118.69 INV=114.44,8"CONC E INV=113.39,18"CONC E INV=113.39,18"CONC W INV=113.59,12'ADS N A FIR/ \I �o"FIR 8"ICED � R 28"CEDAR �e 'AR SYMBOL LEGEND ® SURVEY MONUMENT SURVEY MONUMENT FOUND TREES TO BE SAVED. (0 SURVEY MARKER FOUND THE REMAINDER WILL EXISTING ❑O GAS METER BE REMOVED o MAILBOX UTILITY POLE ❑ CATCH BASIN Q❑ STORM MANHOLE / OS SEWER MANHOLE b ® WATER METER O/ O M WATER VALVE 00' JQ FIRE HYDRANT 12" F`�+ N� �- ' -6" AR �� 2� Q WATER MANHOLE \ F i06 (D DECIDUOUS TREE AS NOTED 108- 0 MAPLE TREE 2"CEDAR lull 10"CEDAR CEDAR TREE 110 O 16"FIR FIR TREE E/� 112- PINE TREE 114- ALDER TREE O ,116- PROPOSED 10 PROPOSED WATER METER SHED �118- 6„C DAff_ ■ PROPOSED CATCH BASIN �--B ILDING w o I30"FIR HOUSE ; §I C NCRETE � FF=119.5 I 30"FIR C RPORT Lli O � Q CONCRETE 0 30" EDAR R OVER AN G 8"PINE o GRAVEL 20 IR o � I 26'/FI R 36"CEDAR 24"C 3'WOOD FENCE 22�. 24"c 28" EDGE OF - Fj EDGE OF ASPHALT N 40TH ST. CATCH BASIN RIM=118.66 INV=115.66,8"CONC W 6' MIN. 1' MIN. DEPTH OVERFLOW SPILLWAY MIN. 1' DEPTH NATIVE SOIL OR 2"-4" ROCK COMPACTED BACKFILL MIN, 1' DEPTH GEOTEXTILE 3/4"-1.5" WASHED GRAVEL TEMPORARY SEDIMENT TRAP OUTLET N.T.S. 2' SETTING DEPTH 1 � 1.5' SEDIMENT STORAGE 4' 1' MIN, OVERFLOW MIN. DEPTH 3 } �1 S*ALE ' ' L 1' DEPTH MIN. 3/4"-1 1 /2" WASHED GRAVEL NOTE: MAY BE CONSTRUCTED 1' DEPTH BY EXCAVATION OR BY BUILDING 2"-4" ROCK A BERM. TEMPORARY SEDIMENT TRAP N.T.S. APPROXIMATE LOCATION OF EXISTING 12"WATER 10 PARCEL # 3224059081 NOTE ALL BUILDINGS TO BE REMOVED CD / 0 FOUND MON - - --SEWER MANHOLE RIM=122.81 INV=109.61,8"CONC S INV=109.56,8'CONC W \-STORM MANHOLE RIM=122.91 INV=117.91,18"ADS S INV=117.91,18'ADS W EROSION CONTROL NOTES 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON DEVELOPMENT SERVICES DIVISION, PLAN REVIEW PROJECT MANAGER. 2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING CONSTRUCTION. 3. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR OTHER CONSTRUCTION TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORILY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETED AND POTENTIAL FOR ONSITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITTEE. 4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS, AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITTEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITTEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 5. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS OR RETENTION FACILITIES. 6. DURING THE TIME PERIOD OF NOVEMBER 1 THROUGH MARCH 31, ALL PROJECTS DISTURBED SOIL AREAS GREATER THAN 5,000 SQUARE FEET THAT ARE TO BE LEFT UNWORKED FOR MORE THAN TWELVE (12) HOURS SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING. 7. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD OF 30 DAYS OR MORE, ALL DISTURBED AREAS MUST BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR IN QUESTION. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF APRIL THROUGH SEPTEMBER INCLUSIVE. SEEDING MAY PROCEED, HOWEVER, WHENEVER IT IS IN THE INTEREST OF THE PERMITTEE, BUT MUST BE AUGMENTED WITH MULCHING, NETTING OR OTHER TREATMENT APPROVED BY THE CITY OF RENTON, OUTSIDE THE SPECIFIED TIME PERIOD. 8. FOR ALL EROSION/SEDIMENTATION CONTROL PONDS WHERE THE DEAD STORAGE DEPTH EXCEEDS 6 INCHES, A FENCE, A MINIMUM OF 3 FEET HIGH IS REQUIRED WITH 3:1 SIDE SLOPES. 9. A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 24' X 50' X 8" OF 4"-6" QUARRY SPALLS SHALL BE LOCATED AT ALL POINTS OF VEHICULAR INGRESS AND EGRESS TO THE CONSTRUCTION SITE. 9A. ALL WATER MAINS AND SERVICES SHALL BE PRESSURE TESTED TO A MINIMUM OF 200 PSI OR 150 PSI OVER OPERATING PRESSURE IN ACCORDANCE WITH THE SPECIFICATIONS OF THE CITY OF RENTON AND THE WASHINGTON STATE HEALTH DEPARTMENT. ALL PRESSURE TESTING SHALL BE DONE IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY OF RENTON. 9B. ALL WATER MAINS AND SERVICES SHALL BE DISINFECTED BY THE INJECTION OF A 50 PPM (MINIMUM CONCENTRATION) CHLORINE/WATER SOLUTION. DRY CALCIUM HYPOCHLORITE SHALL NOT BE PLACED IN THE PIPE AS LAID. CHLORINE SHALL BE METERED/INJECTED IN ACCORDANCE WITH SECTION 7-11.3(12)E OR 7-11.3(12)F OF THE STANDARD SPECIFICATIONS REFERENCED IN 1 ABOVE. 10. A PRECONSTRUCTION CONFERENCE IS REQUIRED PRIOR TO ANY CONSTRUCTION. A MINIMUM OF 10 (10) WORKING DAYS NOTICE IS REQUIRED FOR SCHEDULING. PRIOR TO SCHEDULING THE PRECON A PERMIT INFORMATION SHEET MUST BE SUPPLIED TO THE UTILITY ENGINEERS OFFICE. TWENTY-FOUR HOUR NOTICE WILL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. 11. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. 12. INSTALLATION OF CORPORATE STOPS, WATER SERVICES, LINES AND METERS SHALL NOT BE DONE UNTIL ALL SERVICE AGREEMENTS, METER APPLICATIONS, CONSTRUCTION PERMITS, AND PAYMENT OF FEES HAVE BEEN MADE TO THE CITY OF RENTON. 13. ALL CONNECTION TO EXISTING MAINS TO BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO NOTIFY THE CITY INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. THE CONTRACTOR AS WELL AS THE ENGINEERS SHALL KEEP AS -BUILT DRAWINGS. 15. CONTRACTOR TO PROVIDE PLUGS AND TEMPORARY BLOWOFF ASSEMBLIES FOR TESTING AND PURITY ACCEPTANCE PRIOR TO FINAL TIE-IN. 16 ALL JOINT RESTRAINT SYSTEMS (SHACKLE RODS, NUTS, BOLTS, ETC.) SHALL BE AS MANUFACTURED BY THE STAR MANUFACTURING COMPANY OF COLUMBUS OHIO OR EQUAL APPROVED IN WRITING BY TE WATER UTILITY SECTION. 17, ASPHALT AND CONCRETE STREET PAVING SHALL BE SAWCUT TO A MINIMUM DEPTH OF TWO INCHES. OIL MAT STREETS MAY BE SPADE CUT. ALL SURFACE CONCRETE, PAVEMENT, SIDEWALKS, CURB, GUTTERS AND DRIVEWAY APPROACHES SHALL BE SAWCUT TO A MINIMUM DEPTH OF TWO INCHES OR REMOVED TO AN EXISTING EXPANSION JOINT. 18. A TEMPORARY COLD MIX ASPHALT PATCH SHALL BE PLACED ON THE DAY ON INITIAL EXCAVATION WITH A PERMANENT, SEALED PATCH TO BE PLACED, TO CITY OF RENTON POLICY, WITHIN TEN DAYS. CALL FOR SUBGRADE PRIOR TO PLACEMENT OF FINAL PATCH. TRENCHES WILL NOT BE LEFT OPEN OVER NIGHT WITHOUT PRIOR WRITTEN APPROVAL OF THE INSPECTOR. 19. FOR CITY PROJECTS SUCH AS TELEMETRY CONDUIT, THE PVC USED SHALL BE SCHEDULE 40 IN UNIMPROVED AREAS AND SCHEDULE 80 UNDER IMPROVED AREAS. ALL CHEMICAL PROCESS LINES SHALL BE SCHEDULE 80 PVC PIPE. PROVIDE FULL WIDTH OF INGRESS/EGRESS AREA ROCKED CONSTRUCTION ENTRANCE N.T.S. 2"X4" WOOD POST, STEEL FENCE POSTS, REBAR, OR EQUIVALENT 2"x2"x14 GA. WIRE OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED FILTER FABRIC - MINIMUM 4"x4" TRENCH BACKFILL TRENCH WITH NATIVE SOIL OR 3/4" -1.5" WASHED GRAVEL ~�_t�_ti OF ylrQ AVOID CUTTING UNDERGROUND UTILITY LINES. IT'S COSTLY a Call before you I 11332 STE�1 D `' � • SjONAL EXPIRES 11/30/06 1-800-424-5555 UNDERGROUND SERVICE (USA) NOTE: 10. 5' 2.0' 12" SILT FENCE DETAIL N.T.S. RECOMMENDED FOR APPROVAL BY BY CHECKED FOR COMPLIANCE y� TO CITY STANDARDS DATE DATE DATE EXISTING UTILITY LOCATIONS SHOWN HEREON ARE APPROXIMATE ONLY IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL; AND HORIZONTAL LOCATION OF ALL EXISTING UNDER- GROUND UTILITIES PRIOR TO COMMENCING CONSTRUCTION. NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES ARE SHOWN HEREON. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES NOT SHOWN IN THEIR PROPER LOCATION. CALL BEFORE YOU DIG: 1-800-424-5555 cc>-3cf -.1503 S SCANNED OCT 2 7 2006