Loading...
HomeMy WebLinkAboutWWP2703273.2W a V a G.i v a W_ W a a ��g��QO�m PORTION OF THE N.E. 1/4,, OF SEC. 15, TWN 23 N., RGE 5 E., W.M. CITY OF RENTON, WASHINGTON J ry w D 0 O o U z Q W z w O ry Q w w or L W 03 0 V � W Y y O U 3 3 3 < Q o W �o0 o uiuiI? L_ U_ >_ m _ a Lp r� to 0 0 01 (U cu O rn 3: c_n w w z -> -> � W W o o Q U U tU Q_ w m Li a W a 3 D (0 N z z 0 0 0 o Q T Ln } `� w w of a (`M N i 0 0 MORTAR FILLET 101 MANHOLE FRAME AND COVER SEE DRAWING BR29 ADJUSTMENT (4" MIN.) CONE RUBBER GASKETED JOINTS IN ACCORDANCE WITH ASTM C-443 STEPS - 3/4" DEFORMED BAR STEPS SHALL BE INCLUDED CONCRETE RISER BY PIPE INC., OR APPROVED EQUAL. MAX. PIPE SIZE - 21" I.D. LADDER -STD. ALUMINUM OR GALVANIZED STEEL CONCRETE SHELF PRECAST BASE SECTION OR CAST IN SHELF, SANITARY MANHOLE TYPICAL DETAIL NOT TO SCALE 6" BUILDING SEWER PIPE TEE WITH 6" SIDE OUTLET 6" SIDE SEWER AND BUILDING SEWER 60" ALLOWABLE MAX. FOR CAST IRON PIPE OR DUCTILE IRON PIPE. 1:3:5 MIX tx� CONCRETE -�- BLOCKING r—� M 6" SIDE OUTLET TEE SEWER MAIN 6" MIN. CONCRETE BLOCKING ANGLE OF TEE AT MAIN OVER 25 ELEVATION SEWER MAIN Z_ 0 1 n NOTES: 1. STEPS TO BE 3/4" 0 DEFORMED BAR GALVANIZED SAFETY STEPS OR EQUAL. 2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTIONS ARE INSTALLED. 3. CASTING TO BE PER DRAWING BR29. 4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE. 5. ALL JOINTS SHALL BE GROUTED. 6. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING, COATED (SEALED) WITH A HIGH SOLIDS URETHANE COATING; WASSER MC-CONSEAL OR APPROVED EQUAL; COLOR OF COATING SHALL BE WHITE. 7. RUBBER GASKETED JOINTS SHALL BE IN CONFORMANCE WITH ASTM C-443. 8. CHANNEL HEIGHT SHALL BE A MINIMUM OF 3/4 THE INSIDE DIAMETER OF THE LARGEST PIPE. 9. CONNECTIONS TO MANHOLE SHALL BE MADE USING GPK ADAPTOR, KOR-N-SEAL BOOTS OR APPROVED EQUAL. PROPERTY LINE 6'- 0" FUTURE BUILDING SEWER n py Ld z 2 x 4 STUD SERVICE MARKER PAINT UPPER PORTION WHITE ANS STENCIL ON SIDE WORDING "SEWER" WITH 3" HIGH BLACK LETTERS. w AND #6 WIRE WRAPPED AROUND THE STUD AND Q- EXTENDED TO THE TOP OF THE STUD. af UNLESS OTHERWISE APPROVED BY THE CITY, MAKE TAP THROUGH CAST IRON SADDLE SECURED TO SEWER MAIN WITH STAINLESS STEEL BANDS WHEN CONNECTING NEW SIDE SEWERS TO EXISTING MAIN. VITRIFIED CLAY, PLAIN AND REINFORCED CONCRETE, D1 PIPE AND C1 PIPE SEWER MAINS ARE TO BE CORE DRILLED OU GO 2% MIN SLOPE - HORIZONTAL TYPICAL SIDE SEWER ELEVATION NOTE: UNLESS OTHERWISE SHOWN ON PLAN, SIDE SEWER SHALL HAVE A MINIMUM 2.5' COVER AT PROPERTY LINE OR 3-5' LOWER THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER. STANDARD SIDE SEWER INSTALLATION DETAIL NOT TO SCALE 5-�27'�AS 10" 9„ 8-3/4" 1-1/4" 1/2" 2" SQUARES SPACED - 3/4" NDICATED - HT. 1 /8" 1/2" RAISE-1/2" WIDE BORDER 5 /8„ 2-7/8" CAST IRON RING AND COVER NOTE: IN UNIMPROVED AREAS POUR 1'-0" THICK 2'-0" SQUARE CONCRETE, CLASS 3000, PAD AROUND RING AND COVER. IN ASPHALT ROADWAYS RESTORE AROUND CLEANOUT RING AND COVER AS REQUIRED BY STANDARD DETAIL DRAWING BR36. FIBER PACKIf 45- (1 /8) PIPE MATERIAL AS SPECIFIED BY THE ENGINEER 2'-0" PLUG TO BE SEALED IN SAME MANNER AS MAIN SEWER JOINTS. SANITARY SEWER CLEANOUT DETAIL NOT TO SCALE CONCRETE CLASS 3000 3/4" SANITARY SEWER NOTES AND SPECInCAI)ONS 1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATION OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS. 2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION' PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF RENTON STANDARD SPECIFICATIONS J. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. 4. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION S1 TE. 5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 6. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS. 7. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS 8. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS-BUIL T DRAWING OF THE SANITARY SEWER SYSTEM, WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR. 9. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED, 10, OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAY SHALL BE BACKFILLED WITH CRUSHED ROCK AND MECHANICALLY COMPACTED. CUTS INTO THE EXISTING ASPHALT SHALL BE NEATLINE CUT WITH SAW IN A CONTINUOUS LINE. A TEMPORARY MIX PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILL AND COMPACTION A PERMANENT HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS. 11. DATUM SHALL BE CITY OF RENTON, 1988 NAVD. 12. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 13. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7 OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE. 14, SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 15, IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCHES AND MAXIMUM 12 INCHES ABOVE FINISHED GRADE IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. RECOMMENDED FOR APPROVAL BY EXPIRES 11/30/06 BY CallBY before you CHECKED FOR COMPLIANCE Dj g. Tp CITY STANDARDS 1-800-424-5555 DAM UNDERGROUND SERVICE (USA) DINE AVOID CUTTING UNDERGROUND UTILITY LINES. ITS COSTLY DATE NOTE: EXISTING UTILITY LOCATIONS SHOWN HEREON ARE APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UNDER- GROUND UTILITIES PRIOR TO COMMENCING CONSTRUCTION. NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES ARE SHOWN HEREON. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES NOT SHOWN IN THEIR PROPER LOCATION. CALL BEFORE YOU DIG: 1-800-424-5555. " SCANNED MAY 0 12006