HomeMy WebLinkAboutTED4003310.4U It PROPERTY LINE CDo CD o SANITARY SEWER NOTES &� SPECI EI CA TI ON S 0'4Y z SIDE SEWER MAIN T O � BUILDING SEWER o Q w Lai 3 W oo SANJ TA R Y SEWER NOTES AND SPECIFICATIONS I I -- -- -- z 1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WI TH THE STANDARDS AND z o SPECIFICATION OF THE CITY OF RENTON UTILITY" DEPARTMENT AND THE LATEST EDITION OF �IFUTURE 6'SEWER PIPE 6.0 'I BLDG SEWER z THE WSDOT/APWA STANDARDS AND SPECIFICA TIONS ram_ � 6 SIDE OUTLET TEE ? "X4 " �ARKER 2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ?STANDARD SPECIFICATIONS FOR 2 STUD SER t/l CE MUNICIPAL PUBLIC WORKS CONSTRUCTION? PREPARED BY WASHINGTON STATE CHAPTER PAINT UPPER PORTION WHITE I- AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF RENTON l W AND S TEN Cl L ON SIDE WORD Q STANDARD SPECIFICA TIONS_ I Iq I 1 ° "SE WER " Wl T H 3 " HIGH Q' J. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE BLACK LETTERS. (� CONTRACTOR?S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO 6" SIDE SEWER & BUILDING SEWER —1 AVOID DAMAGE OR DISTURBANCE. PI a n/ t tL/ it v 4. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF O Ld CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE � 6" SIDE SEWER � 5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY 1: 3: 5 MIX NOTE: CONCRETE `60' cn W OTHER REL A TED PERMITS PRIOR TO ANY CONSTRUCTION. ALLOWABLE MAX SIDE SEWER SHALL HAVE A BLOCKING FOR CASTOR MINIMUM 5' COVER AT PROPERTY W6. UJ PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE MAX DUCTILE IRON PIPE. LINE OR 3-5' LOWER THAN THE U PRECEDENCE OVER ALL OTHER PLANS. 6 MIN 4 LOWEST HOUSE ELEVATION, WHICH- 25 i iv1IN I EVER !S LOWER. O 7. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION 6"MIN HORIZONTAL t IS IN PROGRESS T6" SIDE OUTLET TEE \,-SEWER 8. THE CONTRACTOR SHALL PROVIDE THE CITY OF PEN TON WITH AN AS -BUILT DRAWING OF MAIN EXISTING SEWER MAIN THE SANITARY SEWER SYSTEM, WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED CONC. BLOCKING ANGLE 6" SIDE SEWER f PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR. ,� OF TEE A T MAIN OVER 25 0 z 9. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A ELEVA TION �, 6 TEST TEE LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING TO INSTALLED N EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND C OJ�� AT CONNECTION ct oU) FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. G�\� NOTE: O MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED. �\� gv0 MAKE TAP THROUGH CAST IRON W 10. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAY A\G�� cAD IL E S��'URED Tn cciAico AA /A1 _ (� UL E `� `'U_vvL_R /VIA//v R� WITH STAINLESS STEEL BANDS G N o SHALL BE BACKFILLED WITH CRUSHED ROCK AND MECHANICALLY COMPACTED. CUTS INTO THE P l� O� WHEN CONNECTING NEW SIDE EXISTING ASPHALT SHALL BE NEATLINE CUT WITH SAW IN A CONTINUOUS LINE. A 25` G SEWERS TO EXISTING MAIN. TEMPORARY MIX PATCH MUST BE PLACED IMMEDIA TEL Y AFTER BACKFILL AND COMPACTION. A V J �, nrn T /1T I\/ T/1/ / e"t t At t Mr- nt Anrn IAlt Tt I/At 4/1 r-% A \/!^ A Atn r`t / t t nr PER n/r\/ nr PE MANENI HV! Mll( PA1Ur , -iLL OL l-'LH(.tU VVlIl7/!V lV UH 1J 9/VU Ji7ALL Dt rEIT (I!l ! Vi nQ1 AA/A/ C`/ IIOC ���/ L/o fvffly N-vr� HORIZONTAL VITRIFIED CLAY, PLAIN & W RENTON CURRENT STANDARDS. J ° 0 TYPICAL SIDE SEWER REINFORCED CONCRETE, DI & OO N 11. DA TUM SHALL BE Cl TY OF RENTON, 1988 NA VD. Cl PIPE SEWER MAINS ARE TO EL E VA TI ON BE CORE DRILLED. N 12, ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO w THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER SIDE SEWER SERVICE D E TA I L o THE COMPLETION OF CONSTRUCTION. T YP. SEE SH TS. 15 &� 16 1.3, ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FUJ%VDA l fUfV IN ACCORDANCE W TH SECTION 7 OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY MW LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS g PLACEMENT AND COMPACTION OF REQUIRED BEDDING MA TERIAL, TO UNIFORM GRADE SO THA T J < o THE EN TIRE LENG TH OF THE PIPE WILL BE SUPPOR TED ON A UNIFORML Y DENSE, UN YIELDING �U BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE. N� K O 14. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D .JVJ4, SCR 35, OR DUCTILE IRON CLASS 50. 15. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCHES AND MAXIMUM 12 J INCHES ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS QJQ ZO Z = U - TO MA TCH PA VING. U . , 0 2zo O < _ UTILI TY SPECIFICA TIONS Q < C. �SOSK\CITYNOTES�RENTON\UTILLTYSPECIFICATIONSDOC = a = _ } �+ w z w M U Q 11 n 0- I i Q I H. z 0 LLI �SSI�NAL ��1 "AS —BUILT NOTE® EXPIRES 6/22/07 "AS -BUILT" IS BASED ON A ACTUAL FIELD SURVEY BY TOUMA ENGINEERS AND INFORMATION SUPPLIED BY CONTRACTOR. RECOMMENDED FOR APPROVAL BYE DATE BY DATE BY DATE BY DATE BY DATE r .i r EXPIRES 6/22/071 DFZANO: 898001 SITE, DWG SHEET: 4 OF: 4 OCT at t ST❑RM 2w 0 z