HomeMy WebLinkAboutWWP2703325.6C° Li
o
o N
Lei g o
Z �o
rn
gJ
W
Lid
O
�®z
n
Q
0LLJ
=
Q
LLl
0
Cn
cn
z
>_
(
z
Qn
I—
Q
QZ
Q
WO
Q
o
3N
o
Z
Qc
N
�a
to
i
p
�0
o
ti
z
U
W
O
�
U
n
a
W
0
SA NI TAR "r SEWER N O TES & SPECIFICATIONS
1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND
SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST
EDITION OF THE WSD T/APWA STANDARDS AND SPECIFICATIONS.
2. THE HOURS OF WORK /N THE STREET RIGHT-OF-WAY SHALL BE LIMITED TO 8: 30
A.M. TO 3: 30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY
THE DEPARTMENT OF PUBLIC WORKS AT 235-2620. ALL STREET CLOSURES,
PARTIAL, OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24
HOURS IN ADVANCE. THE POLICE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24
HOURS /N ADVANCE.
J. ALL CONSTRUCTION SHALL BE /N ACCORDANCE WITH "STANDARD SPECIFICATIONS
FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE
CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND
CITY OF RENTON STANDARD SPECIFICATIONS.
4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL
BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT
LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE.
5. A PRE -CONSTRUCTION CONFERENCE AND A 24 HOURS NOTICE SHALL BE REQUIRED
PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING
CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTA PVE OF
THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILL ALL
CONSTRUCTION.
6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF
CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE
CONSTRUCTION SITE.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE
AND ANY RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE
PRECEDENCE OVER ALL OTHER PLANS.
9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT
DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND
SIGNED BY A LICENSED PROFESSIONAL ENGINEER OF LICENSED
PROFESSIONAL SURVEYOR.
11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE /N LAYERS
WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 81 INCHES,
THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE
COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE
PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS HOT MIX PATCH SHALL BE
PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT
STANDARDS.
13. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G. S.
14. ALL DISTURBED AREAS SHALL BE SEEDED MULCHED OR OTHERWISE STABILIZED TO
THE SA TISFA C TION OF THE DEPAR TMEN T FOR THE PREVENTION OF ON- SI TE EROSION
AFTER THE COMPLETION OF CONSTRUCTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION /N ACCORDANCE WITH SECTION 7- 02. 3(1) OF THE CURRENT S TA TE OF
WASHINGTON STANDARD SPECIFICA PONS FOR ROAD AND BRIDGE CONSTRUCTION.
THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF
THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED
BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE
WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING
SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE.
16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED
ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50.
17. IN UN -IMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18
INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE /N ALL
DIRECTIONS TO MATCH PAVING.
1/8" RAISE-1/2" WIDE
BORDER
I 0 ,.
9"
r8 3/4 "
7"
7 3 4"
8»
15"
CAST IRON RING AND COVER
f--
RON
PIPE MA TERIAL
AS SPECIFIED.
3/4" SPACES SPACED-3/4" 72"
AS INDICATED -HT 1/8" FIBER J0,
PA CKING
PROPER TY LINE
SIDE SEWER MAIN TO BUILDING SEWER
? FUTURE
6.O'
6" SEWER PIPE ' � BLDG SEWER
'--6" SIDE OUTLET TEE ?; 2"X4" STUD SERVICE ARKER
PAINT UPPER PORTION WHITE
w AND STENCIL ON SIDE WORD
� "SEWER " WITH 3 " HIGH
BLACK LETTERS.
6" SIDE SEWER & BUILDING SEWER
PLAN
6" SIDE SEWER
1: 3: 5 MIX NOTE.
CONCRETE 60° ALLOWABLE MAX SIDE SEWER SHALL HA VE A
BLOCKING FOR CAST OR MINIMUM 5' COVER AT PROPERTY
UCTILE IRON PIPE. LINE OR 3-5' LOWER THAN THE
6"M/N 45' M� X LOWEST HOUSE ELEVATION WHICH-
25 + MIN EVER IS LOWER.
6 "MIN HORIZONTAL
6" SIDE OUTLET TEE
SEWER MAIN
CONC. BLOCKING ANGLE
OF TEE A T MA /N OVER 25 °
ELEVA TION
2% MIN SLOPE
TYPICAL SIDE SEWER
ELEVA TI ON
EXISTING SEWER MAIN
f 6 " SIDE SEWER
6 "TEST TEE
TO BE INSTALLED
A T CONNECTION
NO TE.
MAKE TAP THROUGH CAST IRON
SADDLE SECURED TO SEWER MAIN
WITH STAINLESS STEEL BANDS
WHEN CONNECTING NEW SIDE
SEWERS TO EXISTING MAIN.
VITRIFIED CLAY, PLAIN &
REINFORCED CONCRETE, DI &
C1 PIPE SEWER MAINS ARE TO
BE CORE DRILLED.
SIDE SEWER SERVICE DETAIL
6" MIN.
i
1 /2 BLIND FLANGE AS DAM
D.I.P. TEE CL.50 —
ONE LENGTH OF DUCTILE IRON
PIPE (CLASS 50) TO SOLID
BEARING WHEN SPAN
IS MORE THAN 4'.
L FLEXIBLE b
JOINT
4 3/4" BACKFILL WITH
COMPACTED MATERIAL
AS DIRECTED BY
ENGINEER.
D.I.P. C1.50 6" MIN. —
WITH MIN. 4
SHACKLE RODS !
PLUG TO BE SEALED /N SAME
MANNER AS MAIN SEWER JOINTS.
CLEAN —OUT DETAIL
CEMENT CONCRETE
CLASS C BLOCK
POURED IN PLACE
D.I.P. 90° BEND
CL.50(MJ X PE)
DUCTILE IRON
DROP CONNECTION
1/2 PLUG AS DAM
TYPICAL � TEE
MANHOLE \
'---TYPICAL MANHOLE —�
FOUNDATION
CONSTRUCTION
OUTSIDE DROP SSMH
CONCRETE ENCASED
DROP CONNECTION
CASTING INLAND FDr?y
IR EQUAL. PT#714
EE DETAIL 5.1.4
I DJUSTMEN T 4" M/V.
'ONE
fORTAR JOINTS
TEPS— 3/4 " DEFOrtwED BAR
> TEPS SHALL BE 1ACLUDED
112"
NRETE RISER BY PIPE INC.
APPROVED EQUAL
MAX. PIPE SIZE-21 " I.D.
LADDER —STD. ALWINUM
OR GALVANIZED STEEL.
CONCRETE SHELF
PRECAST BASE S4C TION
OR CAST IN PLAGr
6" MIN.
6" MIN.
SANITARY MANHOLE TYPICAL DETAIL
(NTS)
T YP. SEE SH TS. 11 & 12
NOTES:
1. STEPS TO BE 3/4" 0 DEFORMED BAR GALVANIZED SAFTTY STEPS OF EQUAL
2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTI❑NS ARE INSTALLED
3. CASTING TO BE ❑LYMPIC FOUNDRY MH30 WITH MH30 D/T OR EQUAL. OER DWG. BR29
4. MANHOLE SECTIONS TO BE OF REINF❑RCED PRECAST CONCRETE
5. ❑PENING SHOULD BE ON DOWNSTREAM SIDE.
6, ALL JOINTS SHALL BE GROUTED,
7, SANITARY SEWER MANHOLES SHALL HAVE ALL INTERI❑R
SURFACES, INCLUDING CHANNELING, COATED (SEALED)
WITH A HIGH SOLIDS URETHANE C❑ATING)
WASSER MC-CONSEAL OR APPROVED EQUAL;
F-6" MIN. COLOR ❑F COATING SHALL BE WHITE.
C.�11l
S..332506
ONE LENGTH OF DUCTILE IRON
PIPE (CLASS 50) TO SOLID
BEARING WHEN SPAN
IS MORE THAN 4'.
-LEXIBLE JOINT
BACKFILL WITH
COMPACTED MATERIAL
AS DIRECTED BY
ENGINEER.
CEMENT CONCRETE CLASS C POURED IN PLACE
90` BEND
;TYTON U-651)
RECOMMENDED
FOR APPROVAL
IIlm
DATE
DATE
DATE
DATE
DATE
"AS —BUILT" NOTE:
AS-BU/L T" IS BASED ON AACTUAL FIELD SURVEY
BY TOUMA ENGINEERS AND'NFORMA 77ON SUPPLIED
BY CONTRACTOR.
�Zg H.
WA.
1
9470
ISM
SI�NALyG
�?RES 6/22/07
SIEIW