Loading...
HomeMy WebLinkAboutWWP2703346.2Water Utility Notes and Specifications p 16. All watermains 6 inches and larger in diameter shall be 5. It shall be the responsibility of the contractor to obtain 9. All pipe and appurtenances shall be laid on a properly 24. In any area which has been stripped of vegetation and cleaned with pipe cleaning "PIGS" prior to disinfection. The street use and any other related permits prior to any prepared foundation in accordance with Section 7-02.3(1) of where no further work is anticipated for a period 30 days or "Poly pigs" shall be Girard Industries Aqua Swab -AS or construction. the current State of Washington Standard Specification for more, all disturbed areas must be immediately stabilized with 1. THESE NOTES SHALL APPEAR FOR PROJECTS FOR THE approved equal, 2 lb/cu. ft. density foam with 90A Road and Bridge Construction. This shall include necessary mulching, grass planting or other approved erosion control WATER UTILITY. " urethane rubber coating on the rear of PIG" only. 6. Plans approved by the City of Renton, Public Works leveling of the trench bottom or the top of the foundation treatment applicable to the time of year. Grass seeding Department shall take precedence over all other plans. material, as well as placement and compaction of required alone will be acceptable only during the months of April 2.durometer All work material shall be if conformance with the standards and specifications of the City of Renton standards "PIGS" shall be cylinder shaped with bullet nose or 7. A copy of these approved plans must be on the job site bedding material, to uniform grade so that the entire length of the pipe will be supported on a uniformly dense, through September, inclusive. Seeding may proceed, however, whenever it is in the interest of the permitee, but must be Plan nin Buildin Public Works Department and the 1996 g/ g/ p square end. The contractor will perform the cleaning square operation. whenever construction is in progress. unyielding base. All pipe bedding shall be APWA Class 'C' N 9 P�P 9 augmented with mulching, netting or other treatment edition of the WSDOT/APWA Standards and Specifications, as with the exception of PVC pipe. All trench backfill shall be approved by the City of Renton, outside the specified time approved and modified by the City of Renton in the Renton 18. All watermains and services shall be pressure tested to 8. The contractor shall provide the City of Renton with an compacted to minimum 95% for pavement and structural fill period. Standard Plans & Specifications. A set of approved plans a minimum of 20p psi or 150 psi. over operating pressure, in as -built drawing of the sanitary sewer system, which has and 90% otherwise per ASTM D-1557-70. Pea ravel P 9 shall be kept on site at all times during construction. accordance with the specifications of the City of Renton and been stamped and signed by a licensed professional engineer bedding shall be 6 inches over and under PVC pipe, 9 P P 25. For all erosion sedimentation control ponds where the / the Washington State Health Department. All pressure testing or licensed professional surveyor, dead storage depth exceeds 6 inches fis required 9 P � a fence q wa 3. The hours of work in the street right of shall be 9 y shall be done in the presence of a representative of the 10. Galvanized steel pipe and aluminized steel pipe for all with a minimum height of three (3) feet, 3:1 side slopes. limited to 8: 30 AM to 3:30 PM on weekdays unless City of Renton. The quantity of water lost from the 9. Backfill shall be placed equally on both sides of the pipe drainage facilities shall have asphalt treatment 1 or better 9 P # otherwise approved in writing by the Public Works Department main shall not exceed the number of gallons per hour as inside and outside. gravel 26. A temorar temporary construction entrance, 24 feet x 50 at (425) 430-7301. The Police Department, Fire Department, listed in City of Renton Standard Plans &Specifications depth of 8 inches, thoroughly tamping each layer to 95 feet x 8 inches of 4 to 6 inch quarry s alls shall be located q Y P and 911 shall be notified 24 hours in advance of any work in 7-11.3(11). The loss in pressure shall not exceed 5 psi percent of maximum density. These compacted layers must 11. Structures shall not be permitted within 10 feet of the P at all points of vehicular ingress and egress to the P g g the right of way. g y during the 2 hour test period. extend for one pipe diameter on each side of the pipe or to P P P P spring line of any storm drainage pipe, or 15 feet from the construction site. the side of the trench. Materials to complete the fill over top of any channel bank. 4. All locations of existing utilities shown are approximate 19. All watermains and services shall be disinfected by the pipe shall be the same as described. and it shall be the contractor's responsibility to verify the true and correct location so as to avoid damage or injection of a 50 ppm (minimum concentration). 10. 0 en cut road crossings s for utilit trenches on existing P 9 Y 9 12. All catch basin grates shall be depressed 0.10 feet below pavement level. disturbance. For utility .locates call 48-hour locators chlorine/water solution. Dry Calcium Hypochlorite shall NOT traveled roadway shall be backfilled with crushed rock and 800-424-5555. be placed in the pipe as laid. Chlorine shall be mechanically compacted. Cuts into the existing asphalt 13. Open cut road crossings through existing public right of metered/injected in accordance with Section 7 11.3(12)E or shall be neatline cut with saw in a continuous line. A way will not be allowed unless specifically approved by City 5. An approved Traffic Control Plan is required to be 7-11.3(12)F of the Standard Specifications referenced above. temporary mix patch must be placed immediately after of Renton Planning/Building/Public Works Administrator. submitted at the Pre -Construction meeting, backfill and compaction. A permanent hot mix patch shall be 20. A pre -construction conference is required prior to any placed within 10 days and shall be per City of Renton 14. Rock for erosion protection of roadside ditches, where 6. All watermain pipe is to be cement lined ductile iron pipe P P P�P construction. A minimum of five 5 working days notice is O 9 Ys current standards. required, shall be of sound quarry. rock placed to a depth of conforming to AWWA C110 and C111 or latest revision, required for scheduling. one (1) foot and must meet the following specifications: thickness Class 52. Cement mortar lining and seal coating 11. Datum shall be City of Renton, 1988 NAVD. 4 - 8 inch rock / 40 - 70% passing; shall conform to AWWA C104 or latest revision. Pipe joints to be push -on or mechanical joint. Bedding to be Class C. 21. Twenty-four (24) hours notice will be required prior to starting new construction. 12. All disturbed areas shall be seeded and mulched or 2 - 4 inch rock / 30 - 40% passing; and All ductile iron pipe and fittings shall be polyethylene otherwise stabilized to the satisfaction of the Department less than 2 inch rock / 10 - 20% passing. wrapped per ANSI/AWWA C105/A21.5-93 Standards, 22. It shall be the contractor's responsibility to secure all for the prevention of on -site erosion after the completion of construction. 15. All building downspouts and footing drains shall be 7. Cast iron and ductile iron fittings shall be cement lined, necessary permits prior to starting construction, connected to the storm drainage system, unless approved by13. pressure rated as noted on plans, and in accordance. with 23. Installation of corporate stops, water services, lines and All pipe and appurtenances shall be laid on a properly the City plan reviewer or Surface Water Utility Section. An ANSI/AWWA C110/A21.10-87. Cement lining shall be in meters shall not be done until all service agreements, meter prepared foundation in accordance with Section 7 of the current State of Washington Standard Specifications for Road accurately dimensioned, certified as -built drawing of this drainage system .will be submitted to the City upon accordance with ANSI/AWWA C104/421/4-90. If fittings are applications, construction permits, and payment of fees and Bridge Construction. This shall include necessary leveling completion. 3 to 12 inches in diameter and have mechanical joints, the have been made to the City of Renton. of the trench bottom or the top of the foundation material, fittings shall in accordance with either ANSI/AWWA C110-A21.10-87 or ANSI AWWA C153 A21.53-94. Three 3 / / O 24. All connection to existing mains is to be accomplished as well as placement and compaction of required bedding material, to uniform grade so that the entire length of the 16. Issuance of the building or construction permits by the City of Renton does not relieve the owner of the continuing inch to 12 inch diameter fittings, which have mechanical 9 by the City of Renton, except wet taps, which may be made by approved wet tap contractors with prior approval from pipe will be supported on a uniformly dense, unyielding base. legal obligation and/or liability connected with storm surface joints and or flanged joints, shall be in accordance with / 9 � the Public Works Department All necessary excavation and Pie bedding shall be ea ravel 6 inches above and below P 9 P g water disposition. Further, the City of Renton does not P y ANSI/AWWA C110/A21.10.87 or a combination of ANSI/AWWA materials are to be supplied by the contractor and be the pipe. accept any obligation for the proper functioning and C110/A21.10.87 and ANSI/AWWA C153/A21.53-94 such that on -site prior to City notifications. maintenance of the system rovided durin construction. P g the portion of the fitting with a mechanical joint(s) may be 14. Sanitary sewer pipe shall be polyvinyl chloride (PVC) with ANSI/AWWA C153/A21.53-94 and that portion of the 25. Inspection will be accomplished by a representative of rubber gasketed ASTM D 3034, SDR 35, or ductile iron class 17. The Contractor shall be responsible for providing fitting with flanged joints) shall be in accordance with the City of Renton. It shall be the contractor's 50, adequate safeguard, safety devices, protective equipment, flaggers, and any other needed actions to protect the life, AWWA C110/A21.10-87. Acceptance testing in accordance responsibility to notify Development Services twenty four (24) 15. In unimproved areas, manhole to extend minimum 6 health, and safety of the public, ands protect property in with section 53.53 of ANSI AWWA section 10-4.3 of hours in advance of backfilling all construction. The inches and maximum 12 inches above finished grade. In connection with the performance of work covered by the ANSI AWWA C110 A21.10-87 shall be obtained b the / / Y contractor, as well as the engineers, shall keep as -built paved area, cover must slope in all directions to match contract. An work within the traveled right of way that may Y 9 Y Y contractor and transmitted to the owner. drawings. paving interrupt normal traffic flow shall require a traffic control plan approve by the Public Works Department, TransportationSystems 8. Gate voles shall be iron body, bronzed -mounted, double 26. Contractor to provide plugs and temporary blow -off Division. All sections of the WSDOT Standard disc with bronze wedging device and O-ring stuffing box assemblies for testing and purity acceptance prior to final Surface Water Drainage Notes and Specifications 1-07-23 Traffic Control shall apply. (AWWA C500) or of resilient seated type (AWWA C509). tie-in. Valves shall be designed for a minimum water operating Specifications 18. Special drainage measures will be required if the project pressure of 200 psi. Gate valves shall be Clow List 14, 27. All joint restraint systems (shackle rods, nuts, bolts, location is within the aquifer protection area (APA). Mueller Company NO. A2380 or M & H. etc.) shall be as manufactured by the Star Manufacturing 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY EROSION CONTROL Company of Columbus Ohio, or equal, approved in writing by OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH 9. Fire hydrants shall be Corey type (opening with the the Public Works Department. THE CITY OF RENTON PLAN REVIEWER. 19. All limits of clearing and areas of vegetation preservation pressure) or compression type (opening against pressure) as prescribed on the plan(s) shall be clearly flagged in the conforming to AWWA C-502-85 with a 6 inch mechanical 28. Asphalt and concrete street paving shall be sawcut to a 2. All construction shall be in accordance with the current field and observed during construction. joint inlet and a main valve opening (M.V.O.) of 5-1/4 inch, minimum depth of two (2) inches. Oil mat streets may be Standard Specifications for Road, Bridge and Municipal two 2-1/2 inch hose nozzles with National Standard Threads spade cut. All surface concrete, pavement, sidewalks, curb, Construction prepared by WSDOT and the American Public 20. All required sedimentation/erosion control facilities must 7-1/2 threads per inch and one 4 inch pumper nozzle gutters, and driveway approaches shall be sawcut to a Works Association (APWA), as amended by the City of be constructed and in operation nor to land clearing P prior 9 with the new Seattle Pattern 6 threads per inch, 60 degrees de pth epth of two (2) inches or removed to an existing Renton Public Works Department. and/or construction to ensure that sediment laden water V. Threads: outside diameter of male thread 4.875 and expansion joint. 3. the surface water drainage system shall be constructed does not enter the natural drainage system. All erosion and root diameter 4.6263. Hydrants shall have a 1-1/4 inch pentagon operating nut opened by turning counter 29. A temporary cold mix asphalt patch shall be placed on according to the approved plans, which are on file in the sediment facilities shall be maintained in a satisfactory y condition until such time that clearing and/or construction clockwise (left). the day of initial excavation with a permanent, sealed patch Public Works Department. Any deviation from the approved is complete and potential for on -site erosion. has passed. P P p to be placed, to City of Renton policy, within 10 days. Call plans will require written approval from the City of Renton P q PP Y The implementation, maintenance, replacement and additions 10. The two 2-1/2 inch hose nozzles shall be fitted with for subgrade inspection prior to placement of final patch. # Public Works Department, Surface Water Utility Section. to erosion/sedimentation control systems shall be the cast iron threaded caps with operating nut of the some 30. For Cityprojects such as telemetry conduit, the PVC P Y 4. A co of these approved plans must be on the job site PY PP P responsibility of the permitee. design and proportions as the hydrant stem nut. Caps shall 9 P P Yd P be fitted with suitable neoprene gaskets for positive water pipe used shall be All chemical process lines shall be whenever construction is in progress, 21. The erosion and sedimentation control systems depicted tightness under test pressures. schedule 80 PVC pipe. Schedule 40 in unimproved areas and schedule 80 PVC pipe under improved areas. 5. Datum shall be NAVD 88 unless otherwise approved by on this drawing are intended to be minimum requirements to the City of Renton Public Works Department. Reference meet anticipated site conditions. As construction progresses 11. The 4 inch pumper nozzle shall be fitted with a Storz benchmark and elevations are as noted on the plans, and unexpected or seasonal conditions dictate, the permitee adapter, 4 inch Seattle Thread x 5 inch Storz. Storz Sanitary Sewer Notes and Specifications shall anticipate that more erosion and sedimentation control adapter shall be forged and/or extruded 6061-T6 aluminum 6. All sedimentation/erosion facilities must be in operation facilities will be necessary to ensure complete siltation y P alloy, hardcoat anodized. Threaded end portion shall have no lugs and two set screws 180 degrees apart. Storz face 1. All work materials shall be in conformance with the prior to clearing and building construction, and they must be control on the proposed site. During the course of construction, it shall be the obligation and responsibility of 9 P Y to be metal, no gasket to weather. Storz cap to have standards and specification of the City of Renton Utility satisfactorily maintained until construction is completed Y P and the potential for on -site erosion has passed. the permitee to address an new conditions that may be P Y Y synthetic molded rubber gasket, and shall be attached to Department and the latest edition of the WSDOT/APWA created by the activities and to provide additional facilities, hydrant adapter with 1 8 inch, coated, stainless steel, Yd P / Standards and Specifications. 7. All retention/detention facilities must be installed and. in over and above minimum requirements, as may be needed, aircraft cable. 2. All construction shall be in accordance with "Standard operation prior to or in conjunction with all construction to protect adjacent properties and water quality of the receiving drainage system. 12. Fire hydrants shall be painted with two coats of paint. " Specifications for Municipal Public Works Construction P P activity unless otherwise approved by the Public Works Department, Surface Water Utility Section. Preservative paint number 43-655 safety yellow or approved prepared by Washington State Chapter American Public Works 22. Approval of this plan is for erosion/sedimentation control equal. Association, latest edition (APWA) and City of Renton 8. Grass seed may be applied by hydroseeding. The grass only. It does not constitute an approval of storm drainage Standard Specifications. seed mixture, other than City of Renton approved standard design, size nor location of pipes, restrictors, channels, or 13. Pumper connection to face roadway assembly. mixes, shall be submitted by a Landscape Architect and retention facilities. 14. Fire hydrants shall be installed per City of Renton 3. All locations of existing utilities shown are approximate and it shall be the contractor?s responsibility to verify the approved by the Public Works Department, Surface Water Utility Section. 23. During the time period of October 1st through April Standard Detail for fire hydrants, latest revision. true and correct location so as to avoid damage or 30th, all project distributed soil areas greater than 5,000 disturbance. square feet, that are to be left un-worked for more than 15. All watermains 10 inches and smaller to maintain a 12 hours, shall be covered by mulch, sodding or plastic minimum cover of 36 inches below finish .grade. All 4. Contractor is solely responsible for the means, methods covering. watermain 12 inches and larger shall be at a minimum of and sequences of construction and for the safety of workers 48 inches below finish grade. Where utility conflicts occur, and others on the construction site. watermains are to be lowered to clear. _ r n ,, _ v r �nJ o you r �Ul o C Q� IE1i g UI C0C2L�an 01 )9 ad F 31741 O� CONSULTING ENGINEERS/CIVIL AND STRUCTURAL 7oNAL E'\ 1519 West Valley Highway North, Suite 101 Auburn, WA 98001 EXPIRES 12/13/2Q07 1 TEL (253) 833-7776 FAX (253) 939-2168 S:\06\06019\Civil\C4-019.dwg Drafter Name: A. PAUL i Plot Date: SEP 29 2006 10: 05: 24 1 Last Modified Date: AUG 31 2006 17: 01: 03 1 Submittal: REVISION CITY OF RENTON Approved By. Date:`Q Approved Date: Approved By. Date: Approved By. Date: 334 �,ode t1CT 2 7 20