Loading...
HomeMy WebLinkAboutWWP2703357.5�- go,Mr'ARY SEWER NOTES AND SPECIFICATIONS o1 ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND Y m z Z SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION o w Q w OF THE WSDOT APWA STANDARDS AND SPECIFICATIONS. (f) 2. THE HOURS OF WORK IN THE STREET RIGHT-OF-WAY SHALL BE LIMITED TO 8:30 A.M. TO 3:30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235-2620. ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE 6" BUILDING SEWER PIPE DEPARTMENT, FIRE DEPARTMENT AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE.CL - a- 3. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE CHAPTER TEE WITH s" SIDE OUTLET AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF RENTON Q STANDARD SPECIFICATIONS. (D 4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE W CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO s" SIDE SEWER AND BUILDING SEWER AVOID DAMAGE OR DISTURBANCE. O Z 5. A PRECONSTRUCTION CONFERENCE AND A 24-HOUR NOTICE SHALL BE REQUIRED PRIOR TO t) STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL Wco° _ a BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE Q 'v1 CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. W (n cn 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF it CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. o Q 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY o OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. Z Q PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE 1:3:5 MIX o� co PRECEDENCE OVER ALL OTHER PLANS. CONCRETE 7 P BLOCKING � 5 'L 9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION N M� IS IN PROGRESS. R E TY OF RENTON WITH AN AS BUILT DRAWING OF SE 1/4 SECTION 18 AND SW 1/4 SECTION 17, TWP. 23 N., RGE. 5 E., W.M. PROPERTY LINE z 6'-0'. o r- FUTURE 1h BUILDING SEWER W Z \ ` 2"x 4" STUD SERVICE MARKER PAINT UPPER PORTION WHITE ANS STENCIL ON SIDE WORDING 'SEWER" WITH 3" HIGH a BLACK LETTERS. AND #6 WIRE WRAPPED AROUND THE STUD AND EXTENDED TO THE a TOP OF THE STUD. UNLESS OTHERWISE APPROVED BY THE CITY, MAKE TAP THROUGH CAST IRON SADDLE SECURED TO SEWER MAIN WITH STAINLESS STEEL BANDS WHEN CONNECTING NEW SIDE SEWERS TO EXISTING MAIN. PLAIN AND REINFORCED CONCRETE, DI PIPE AND CI PIPE SEWER MAINS ARE TO BE CORE DRILLED. VITRIFIED CLAY PIPE SHALL BE CUT AND HAVE A NEW TEE SECTIONED IN. 60" ALLOWABLE MAX. FOR CAST IRON PIPE OR DUCTILE IRON PIPE. Q 10. THE CONTRACTOR SHALL P OVIDE TH CI - THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR. 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH 6" SIDE OUTLET TEE SEWER MAIN 6" MIN. CONCRETE BLOCKING ANGLE LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND OF TEE AT MAIN OVER 25 C) CD FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. ELEVATION ® MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED. cn or O i 12. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAY C �° SHALL BE BACKFILLED WITH CRUSHED ROCK AND MECHANICALLY COMPACTED. CUTS INTO [-� THE EXISTING ASPHALT SHALL BE NEATLINE CUT WITH SAW IN A CONTINUOUS LINE. A v TEMPORARY MIX PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILL AND SEWER MAIN COMPACTION. A PERMANENT HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND NOTE: E- 4 W SHALL BE PER CITY OF RENTON CURRENT STANDARDS. UNLESS OTHERWISE SHOWN ON PLAN, SIDE SEWER SHALL HAVE N '_1A MINIMUM 2.5' COVER AT PROPERTY LINE OR 3-5' LOWER F�-1 C' 13. DATUM SHALL BE CITY OF RENTON U.S.C. AND G.S. THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER. , J 14. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE m SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 2 E- C 15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN c ACCORDANCE WITH SECTION 7-02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD a_ SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6 INCHES ABOVE AND BELOW THE o� � PIPE. o zz � � �a o 16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED �o ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50. �s 17. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCHES AND MAXIMUM 3" DOUBLE CHECK VALVE ASSEMBLY PER 18 INCHES ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL CITY OF RENTON STANDARD PLAN B101 DIRECTIONS TO MATCH PAVING. SEE SHEET SD4 PARKING.. GARAGE. FF .EL=34..8.9.... z _. ........ z - BOTTOM. OF GARAGE SLAB EL=34.39 z o o z o ��Q � o z� w a, Q 3...ELBOW . IE=31.64 (6" FROM . ... a. . . . . . . . . . OIL/WATER SEPARATOR)... 3" DISCHARGE TO SSCO _......__ _.... ............. _. _ ..:........_... _ _SEE SHEET S2 o w a Z Z o Y a p - e► 3" ELBOW in o ¢ o csi a ¢ - . . . . . . - 3" DISCHARGE Q Q ¢ ¢ Q d � � 7) _..._..... ....... ..........._ .......... _...... IE=31.1.-0 .... .. ....... Q w ......... oc 0 0 C,4 r7 rn r \ ^ _ \ \ r_ \ i- . . . b r O \ z m -LO .. _. ...... ... C. . UU U Ua] .. ........ __. . . . . . . . . . HW ALARM EL=26.75- ww w Z 3 CHECK VALVES ... _ ..... - ....: .. OQ U = v Z w PUMP #2 ON EL=25.50 = : :: I O C.. _:: P C 'Z w cn ..:: a J a M i3O_ O� .d Q Z w PUMP ON EL=24,25 - 4 2160' MANHOLE, w z' PER DETAIL SHEET SD4 w Z U w lO Ll_ O (n O_ EL . . . . . . �. 0 . . . . . o a o �'� PUMP OFF EL=23.00- �: 00 W U . . . . . r � ! ��w p a .......... ...... _.. _ BOTTOM OF MH EL=21.75= o w L,.i w� o_ (n ® � . . . . . . . . . . . PUMP #1 AND.#2 SHALL BE PACO MODEL# 1570-0 o w p 1HP,: 1750. RPM, 37PHASE 460 VOLT,: EXPLOSION PROOF, AND w RAIL MOUNTED AND INCLUDE ALL FITTINGS, PIPING, VALVES AND ED - (n af APPURTENANCES. CONTROL. PANEL_SHALL BE:.L.O:CATED IN UTILITY ROOM. CONTRACTOR SHALL PROVIDE SEPARATE CONDUIT FOR POWER � AND CONTROLS. SEE MANUFACTURER SPECIFICATIONS FOR ADDITIONAL w � Q SSMH#2 W/DUPLEX PUMP (TO BE INSTALLED AND REQUIINSPECTED UNDER THE BUILDING PERMIT) it W l!7 04 r O Z 1 "7' \/ U 10 17 Edlted note DCV AG DATE REVISIONI BY APPR uiu ci rNor HORIZONTAL STANDARD SIDE SEWER INSTALLATION (SEWER MAIN TO PROPERTY LINE) 1 ADOPTED CITY OF RENTON STANDARD ]?I.AN3 iSe DATE: 04/04 DWG. NAME: B078 SP PAGE: 8078 SD 660-SA 450 Gallon Capacity 6'-0' BACKFILL MATERIAL (SEE NOTE 5) - CONCRETE CLASS C (SEE NOTE 8) - FOUNDATION LEVEL (CLASS A DESIGN) W (SEE NOTE 4) BACKFILL MATERIAL (SEE NOTE 5) - BEDDING MATERIAL FOR RIGID PIPE (SEE NOTE 6) - FOUNDATION LEVEL (CLASS B. C, D. DESIGN) BEDDING FOR RIGID PIPE f - W (SEE NOTE 4) BEDDING MATERIAL FOR FLEXIBLE PIPE (SEE NOTE 7) FOUNDA11ON LEVEL (CLASS F DESIGN) BEDDING FOR FLEXIBLE PIPE PROVIDE UNIFORM SUPPORT UNDER BARREL HAND TAMP UNDER HAUNCHES. COMPACT BEDDING MATERIAL TO 95% MAX. DENSITY EXCEPT DIRECTLY ER PIPE. HAND TAMP ONLY. SEE "EXCAVATION AND PREPARATION OF TRENCH" IN THE SANITARY WEIRS SECTION OF THE STANDARD SPECIFICTATIONS FOR TRENCH WIDTH AND TRENCHING OPTIONS. THE PIPE ZONE WILL BE THE ACTUAL =NCH WIDTH, EXCEPT FOR CLASS A BEDDING. THE MINIMUM CONCRETE )TH SHALL BE 1-1/2 I.D. + 18". TRENCH BACKFILL SHALL CONFORM TO "BACKFILLING SEWER TRENCHES" THE SANITARY SEWERS SECTION OF THE STANDARD SPECIFICATIONS, ^EPT THAT ROCKS OR LUMPS LARGER THAN 1" PER FOOT OF PIPE METER SHALL NOT BE USED IN THE BACKFILL MATERIAL SEE "BEDDING MATERIAL FOR RIGID PIPE" IN THE AGGREGATES SECTION THE STANDARD SPECIFICATIONS FOR THE MATERIAL SPECIFICATIONS. SEE "BEDDING MATERIAL FOR FLEXIBLE PIPE" IN THE AGGREGATES 'TION OF STANDARD SPECIFICATION FOR THE MATERIAL SPECIFICATIONS. PIPE MUST BE ANCHORED IN SUCH A MANER AS TO ENSURE FLOW E IS MAINTAINED. For Baffle and Weir Plates PLAN VIEW Typical Cover Not Shown, See Cover Plan 1 1/2' Dia. Lift Hole 1 Each Side, 2 Sides INLET PIPE Contractor To Plug (Grout) With Sampling Tee After Installation IE=32 22 � . (6' IN) 0 8° Dia. Hole a' D•' s. a I 1'-4° OR OF VAULT EL=34.89 OUTLET PIPE With Sampling Tee 0 8' Dia. D Hole IE=31.72 a (6' OUT) a v o s C � Grit/ Sludge 3 Retainer Wei ' s�' M 0 iu 1'-0' 1'-9" SECTION AA Oil Retainer Baffle - Flow Diffuser Baf fle LIMITS OF PIPE ZONE -T, LIMITS OF PIPE ZONE LIMITS OF PIPE ZONE 1' r0" BEDDING CLASS DESIGN DIMENSION CLASS A CLASS B CLASS C CLASS D CLASS F A 6" MIN. 1/4 I.D. 12" MAX. 6" MIN. 6" MIN. ZERO 8" MIN. B 1/4 O.D. 1/2 O.D. 1/8 O.D. ZERO O.D. C 3/4 O.D. 1/2 O.D. 1/8 O.D. O.D. - 1-31-05 111pdate DlmenzWo in Table MB 4-4-97 lCwrected note 4 DCV DT 2-21-91 Revlsd nuts, 4,5,7,t 8. Added note 8 KJ ---- DATE REVISION BY APPR No, 3030P Galvanized Diamond Plate Cover No. 1012P Galvanized Diamond Plate Cover 2 Places 1-3/4' Dia. Lift Insert 4 Places COVER VIEW INSTALL 1-12' RISER PIPE BEDDING FOR SANITARY SEWER ADOPTED CITY OF RENTON ♦ I� i♦ BTeNDM I?I,ANB O ISP DATE: 01/05 DWG. NAME: B077 SP PAGE: B077 I 0" 15" SECTION A -A SECTION B-B ►!\ 95 \ : 6 rem PIPE MATERIAL AS SPECIFIEI BY THE ENGINEER NOTES: 1. 6' CLEANOUT RING AND COVER SHALL BE EAST JORDAN IRON WORKS, INC. No. 3675. CLEAN OUT SHALL BE A WATER TIGHT ASSEMBLY. 2. IN UNIMPROVED AREAS, POUR A 1'-0" THICK, 2'-0" SQUARE CONCRETE, CLASS 3000, PAD AROUND THE RING AND COVER. 3. IN ASPHALT ROADWAYS, RESTORE AROUND CLEANOUT RING AND COVER AS REQUIRED BY STANDARD DETAIL DRAWING BR36. 04/10/03 1 Revised notes. IJDH I DMC IDA7196 I Added notes. IDCV I AG DATE I REVISION I BY APPR 9-335703 RECOMMENDED FOR APPROVAL By: Date: py: Date: moo" zs�s o �� es F0�STERF S/�NA L E�� By: EXPIRES 2/5/08 By: 12./ Date Date /4„ GHT I PLUG TO BE SEALED -f IN SAME MANNER AS ® MAIN SEWER JOINTS. 6 INCH CLEANOUT Y ADOPTED G CITY OF RENTON sTnrmaRD prr►Ns NetO ISf DATE: 04/04 DWG. NAME: B076 SP PAGE: B076 DEVELOPER: SDI RENTON, LLC 2100 124TH AVENUE NE �G A& -A SUITE 112 �lw BELLEVUEUE, WA 98005 �e (425) 641-3939 " Z CONTACT: BILL SHERMAN ENGINEER: n \ o v 18215 72ND AVENUE SOUTH 20G �g A 2 (425)251-6222E N G (425)251-8782 FAX CITY OF RENTON E�EPAF?TMf=NT OP PIJBL_IC WORKS SANITARY SEWER NOTES AND DETAILS Smithers' Place DESIGNED BHE DATE 4/02/02 FILE NO. DRAWN BHE CHECKED RJA SCALE NA FIELD BOOK PAGE APPROVED SHEET S3 OF 3 DIRECTOR OF PUBLIC WOFKS 0" 7 0 o� l- I N r- N x w Z w w cn 0 N _II U a 0 0 0 N N N a; E i= 0 I N c c N Ln N / cn 0 0 0 0 i N LL LO cq