Loading...
HomeMy WebLinkAboutWWP2703363.7ERE w Q z I--- U Lu 7) O ry n w Z Ld L� TL# 143765-0150 N � 15 I � I J I lJ 1 �— -- 432 �_- -OH✓ - Nor sNowN ON PSE MAP 00 11835-139th AVE SE TL# 143765-0140 11843 139th AVE SE 14 � TL# 143765-0130 13 IF;S-I. 8" W (WD #90) I -- -- - L —� 3-12"DEC TWIN �-- 0 --- --�__ - --- — —/430 ------� _ = STA. 24+00 o — EW 12" SS>02°o1'oz,W - SSMH 13 - - - - i105 LF 16" D1, CL 52 OL I � Y 12 M W F WR,� � --'— NEW SS CB RIM=428.85 —� —429 �IE 15"CPEP(S)-424.20 — - 428 B-3 I )E-LECT PIPE JOINT 22' RT - ROM STA 23+00 TO 25' RT @24+00 8"DEC 6E 8"DEC NOTE: ANY NON -PAVED AREAS THAT ARE DISTURBED SHALL BE RESTORED TO ORIGINAL CONDITION OR BETTER STA. 24+05, RT. 25' U CONNECT TO EXISTING 16" DI WATER L SEE CONNECTIOL. DETAIL #3 ON SHEET 10 OF 1 TL# 238520-0050 I 1 - 16" SLEEVE (MJ) 16" DI SPOOLS 5 NO NOTE: BORING 2, (LOCATED STA 20+05) WHICH JUST TAPPED BELOW THE TILL INTO THE UNDERLYING OUTWASH AT APPROX DEPTH 2O.5' ENCOUNTERED GAS WHICH MAY HAVE BEEN METHANE TRAPPED IN THE OUTWASH. THIS WILL NOT LIKELY IMPACT CONSTRUCTION DUE TO THE THICKNESS OF LOW PERMEABLE SOILS CAPPING THE OUTWASH. CONTRACTOR SHOULD MONITOR FOR POTENTIAL PRESENCE OF GAS IN THE TRENCH EXCAVATION AT THE TIME OF CONSTRUCTION. 23+00 24+00 430 425 420 415 HIM 8"DEC 71 x Los STA, �— 25+00 8"DEC - 8"DEC TL# 238520-0040 4 25+00 EX. 16" DI (final 6 8"DEC CB RIM=428.53 IE 15"CPEP(N)-423.58 IE 15"CPEP(S)=423.48 11847-139th AVE SE TL# 143765-0120 12 ,I II NO ADDRESS I TL# 102305-9409 TRACT E IE=424.1 15"CMP I IE-423.0 F jl M I I -42' /- �- OHS - -� _� GRAVEL \428 42> �, 2 +00 - SSMH 2 — NEW 12SS —� -- w 8"DEC TL# 238520-0030 3 8"DEC 8"DEC TL# 238520-0020 2 26+00 8"DE CONIC 8"DEC 8"DEC CB RIM=421.33 \ r IE 15"CPEP(N)=422.83 IE 15"CPEP(W)=422.73 WMH-427.50 TOP 16" DI PIPE=423.3 WMH-427.18 TOP 12" DI PIPE=422.7 CB RIM=426.64 IE 15"CPEP(N)=422.54 IE 15"CPEP(W)=422.34 TL# 238520-0010 1 27+00 SD RIM-428.30 2' SSMH /I —EXIS . 16" G � ---EXIST. 12" GV IN VAULT IN VAULT �n \ �o 0 CD 00 SSM C0R# 93 RIM— 26.91 T'I 30.00' 30.00' z CL C NL 12"PVC =416.01 I � r I S-336307 Im ® 0.62.`g 'STA 27+39.84 RT 37.85' INSTALL NEW 48" MH INSTALL NEW 48" MH INSTALL NEW 48" MH 12" SANITARY SEWER 66 ' RIM 429.50' A • 4�' 4 4 RIM 428.74' .k�f RIM 426.68 TO EXIS77NG MH RIM 426.89' . " ..1E 12"(S)-418:28'......................... I ..........:...... ' 1E 12"(S) 417 40.:.........:.........:.........:.........:... " 12"(W)- 416.16' lE 12"(E) 416.00' lE W 41& JE 121(N) 418.31' JE 12"(N) 4I Z 41' IE 121(N) 416.26' REMOVE SHELF AND _ �s� _ REPOUR CHANNEL A 5- BUILT INFORMA TION BASED UPON FIELD SURVEY PERFORMED MAY 1, 2008 BY PLS, INC. EXPIRES 8/21 /09 1 AS —BOIL T DRAWINGS NO. I REVISION SURVEYED: DESIGNED: MAB DRAWN: MAB MAB 10-08 CHECKED: JDH BY DATE APPR APPROVED: DMC SCALE: 1 "=20' ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 :4,_ CITY OF R EN TON DATU M \ Planning/Building/Public Works Dept 08-14-07 D U V A L L AVENUE SEWER MAIN FlELDBOOK: PAGE: D U V A L L AVENUE NE DRAWING NO: NE 8TH STREET TO NE 10TH STREET S-3363 SHEET: OF: 9 OF 'I S I 13131613L-L- > C17 y rN ITI o 04 o W �w z w cn