Loading...
HomeMy WebLinkAboutWWP2703363.8M M, N w Q z F- U w O Iml9/ywAlw4AriLAq I"wm IN VER T 425. f EXIS T 8 WES T - EXIST 8" EAST /ER T -+ 425.67 MAIN CHANNEL (E & S) N = SHALL MA TCH CROWNS ti W zC/� SSM H #7 CH AN N ELI ZATI ON NO SCALE SA WCUT EXISTING ASPHALT (TYP) MIN. 6' MAX. PA YL I MI T WA TER MAIN TRENCH BEDDING AND BACKFILL PAY LIMIT OF TRENCH 4' EXISTING ASPHALT THICKNESS VARIES 1' MIN. WATER MAIN TRENCH ONL Y NOTES: 8" HMA CLASS 112" PG 64-22 6" CRUSHED SURFA CING TOP COURSE PAY LIMIT TRENCH BACKFILL 6'-0" FOR 12" SANITARY SEWER LINES 4'-0 FOR ALL WATER MAINS 1'-0" 6" f IA/ 1 IT r\/I/'.TIA In A ­1 I A I T /T\/ N SEE DETAIL FOR ASPHALT CONCRE T PA VEMEN T RESTORA TION REQUIREMENTS BACKFILL MA TERIAL NA TI VE IF APPRO VED BY ENGINEER OR IMPORT PER SECTION 9- 03. 79 (SELECT BACKFILL) OF THE SPECIAL PROVISIONS. PROPOSED 72" SEWER PIPE PROPOSED 7 6 " WATER PIPE FOR SEWER PIPE: PIPE ZONE MA TERIAL PER SECTION NO TES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. J. COMPACT PIPE ZONE MATERIAL TO 90% MINIMUM DENSITY EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE HAND TAMP ONL Y. 4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE FLOW LINE IS MAINTAINED. 5. ALL EXCA VA TION AND BEDDING AND BACKFILL MATERIALS BEYOND PAY LIMIT OF TRENCH SHALL BE INCLUDED WITHIN THE TRENCH EXCA VA TION SAFETY SYSTEMS BID ITEM. 9- 03.12(3) GRAVEL BACKFILL FOR PIPE ZONE BEDDING. FOR WATER PIPE: PIPE ZONE MATERIAL SHALL BE NA TI VE MATERIAL UNLESS DEEMED UNSUITABLE BY THE ENGINEER, THEN BANK RUN GRAVEL FOR TRENCH BACKFILL PER SECTION 9-03.19. SANI TAR Y SEWER AND WA TER PIPES TYPICAL TRENCH BEDDING AND BACKFILL EXCA VA TION OF UNSUITABLE SOIL AND BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY) DEPTH AS APPROVED BY ENGINEER. MA TERIAL SHALL MEET SECTION 9-03.9(l) BALLAST (MA �S 112" 54-22 SHED ING TOP E WATER MAIN TRENCH BEDDING AND BACKFILL PAY LIMIT OF TRENCH 4' EXISTING ASPHAL T THICKNESS VARIES 1. ALL TRENCHES IN ROADWAY AREAS SHALL BE BACKFILLED AND PATCHED PER SPECIAL PROVISION 5-06.1 AT END OF EACH WORKDAY. THIS WORK IS INCIDENTAL TO ALL TRENCH RESTORATION WORK. 2. THE JOINTS FOR FINAL PATCHES SHALL BE A MINIMUM OF 1' BEYOND THE UNDISTURBED EDGE OF THE TRENCH. JOINTS SHALL BE SAW CUT AS DESCRIBED IN THE PATCH DETAILS UNLESS APPROVED BY THE ENGINEER. 3. ALL TEMPORARY PATCHES ON UTILITY TRENCHES SHALL BE PERMANENTLY PATCHED WITHIN TWO (2) WEEKS OF COMPLETION OF THE INSTALLATION OF THAT UTILITY WORK UNLESS APPROVED BY THE ENGINEER. THE ENGINEER WILL ALLOW PORTIONS OF TEMPORARY PATCHES TO REMAIN WHERE ADDITIONAL TRENCHING WILL BE REQUIRED FOR ANOTHER UTILITY. 4. THE FINAL PATCH SHALL BE 8" HMA CLASS 1 /2" PG 64-22. 5. ALL ASPHALT PATCH AREA OUTSIDE OF PAY LIMIT SHOWN SHALL BE CONSIDERED INCIDENTAL TO OTHER ITEMS OF WORK. 6. ASPHALT PATCH CONFIGURATION AT 8TH AND 10TH SHALL BE DETERMINED IN THE FIELD BY THE ENGINEER BASED UPON TRENCH LIMITS. 5'+ SEWER MAIN TRENCH BEDDING AND BACKFILL PAY LIMIT OF TRENCH 6' PARALLEL WA TER AND SEWER MAIN TRENCHS ASPHALT CONCRETE PA VEMEN T RESTORA TION DETAILS N TS A S-BUIL T INFORMATION BASED UPON FIELD SURVEY PERFORMED MA Y 1, 2008 BY PLS, INC. - A IAI-I IT -III --1A In A --I 1 A I T /-I i N S-336308 EXISTING WA TER 7 4'+ SEWER MAIN MAIN TRENCH PA TCH TRENCH BEDDING AND BACKFILL PAY LIMIT OF TRENCH 6' SURVEYED: SCALE: VERTICAL• NAVD 1988 NTS HORIZONTAL: NAD 1983/1991 DESIGNED: MAB DRAWN: MAB 1 AS—BUIL T DRAWINGS MAB ! q 0-0Q CHECKED: ONE INCH C T CHECKED:.... AT FULL J SCALE I''' ----- IF NOT ONE INCH NO, REVISION BY DATE APPR APPROVED: SCALE ACCORDINGLY DMC / AG SEWER MAIN TRENCH ONL Y 4A 3 112 " 4-22 'ED G 'SE HORN 4� of wgsti� 1U 23169 �FG I STER�� �F �SS/ONAL ENG\ EXPIRES 8 21 09 CITY OF D U V A L L A V E NE FIE DBOOK. 14-07 RENTON WATER SEWER PROJECT DRAWING NO: Planning/Building/Public Works Dept. M I SCELLAN I OU S DETAILS S-3363 S11 OF D11 1 j I I I I . S 3363 v 2