WATER UTILITY NOTES AND SPECIFICATIONS
w
SW
1 4 OF
1
E
1 i 4
4
_
23 N.
S E.
WM
1. AP R PROJECTS FOR T WATER UTILITY.
THESE NOTES HA APPEAR F OJEC S 0 H W E U L ESE 0 ES SHALL EA 0 E
wa
_
:__
_
<...
_ _ . _<.
:.<.: .....
:.
;.... ,..,..,...
_ ,. <..: , .:..
;__ < :.:. ,
2. All work material shall be in conformance with the standards and specifications of theCity of Renton
w
m n f r
Planning/Building/Public Works De art e t and the 1996 edition o the WSDOT APWA Standards and
P /
;.:
-:,..
Secficatwns as approved and modified by the City of Renton in the Renton Standard Plans & Specifications. ns.
A set of approved plans shall be kept on site at all times during construction.
PP P P 9
3. h h work in the street right of way shall be limited to 8:30 AM 0 PM on weekdays unless
The ours of w r to 3.3 ss
9 Y Y
.......... ,.
o:
Z
......
;..
..
o its e Public Works at 425 430- e olicDepartment, otherwise approved m writing b the ks 7301. Th P e
PP 9 Y( )
Fire 911 shall notified 24 hours in advance of an work in the ri ht of wa
De artment and be
_ .. _._.__: .
....
.:..
4. f existing utilities shown are approximate and it shall b ors responsibility All locations o ex st u ee the contractto
9......
} ..,:,,...
....;
.................
""
v n oast d m e or distur an I I II 48-hour
verify the true and correct location s o avoid damage disturbance. For utility locates call
Y 9 Y
43 0 _ ,
.....
„.
-.
---
:. < ; .
locators 800-424-5555.
a
tiv i v �i t
An approved a Co o b Con430
5. Traffic Control Plan is required to be submitted at the Pre -Construction meeting.
PP q 9
-
<t
!....'.. ...
1 rI
cement line I it i conforming 10 n 11 o latest
6. All watermain pipe is to be cem d ductile on e c to AWWA C1 and C s
P P P 9
F--
cn
II
_
�
<.
.. .
revision thickness Class 52. Cement mortar linen and seal coating shall conform to AWWA C104 or latest t ss g g
: :
revision. - r mechanical in I iron
Pi in t e push -on o ec ant al joint. Bedding to be Class C. All ductile o pipe n e joints o b o c B C as C and
P P J 9 PP J
.:; ..
.
shall bepolyethylene wrapped Per ANSI/AWWA C105/A21.5-93 Standards.
.---fittin9s
:.....
..
7. Cast iron and ductile iron fittings shall be cement lined pressure rated as noted on Ions and in
9 P P.......
42
DI WAT
R
.. .-
•--:
4�
accordance with ANSI/AWWA C110/A21.10 87. Cement lining shall be in accordance with ANSI/AWWA
U
_ 1
C1 4 4 1 If fittings are 3 to 2 inches in diameter and have mechanical rots the fittings shall
0 2 4 90.ca o s be
/ /1 9
A TFR
. _. .
Q
- - -
C110 1.1 WWA C1 T inch
in accordance with either ANSI AWWA A2 0 87 or ANSI A 53 A21.53 94. Three 3 n to 12
!...
_....
,. ......:.
7 F .:..:. DI
nc diameter fittings, wh is d b a ce with
inch which have mechanical joints and/or flanged joints, shall a in accordance
9 J / 9 J
_..
-
- ------
:
--�-�-
---
., < , ,
- - ANSI AWWA C1 10 A21.10.87 or a combination of ANSI AWWA C1 10 A21 87 and ANSI AWWA C153 A21.53 94
:.
< .
::..
STA 3+0
f: i,�4 s, RT
CO
- 4
s n f the fitting with a mechanical joint(s) s may be with A I AWWA C153 A21.53 9 and
such that the portion o e NS
P 9 J O Y / /
_ I
;..
"
REM
REMOVE
X PLUG
-
that portion of the fitting with flanged Joints(s) shall be in accordance with AWWA C110/A21.10 87.R
IT
_
Acceptance testing in accordance with section 53.53 of ANSI AWWA section 10 4.3 of ANSI AWWA
P 9 / /
1 _
V
VERTICAL
CROSS. -MJ
� �
l--
1 8 x6 -T
E M' F
,{, Jx L)
- the contractor transmitted to h
C1 b obtained b o tractor and trans t the owner.
10 A21.10 87 shall eVALVE.
1 -
x4 R..
EDUG
R �,-
C.
_.
= : :
1 _ AT
6 G EFL.
_
0 rin I disc with vice and
8. all be iron body, bronzed -mounted, doub e d t bronze wed in de
Ywedging
Gate valves shall 9
-
1
GAT E VALE
MJxFL _;
':_.:
1 FIR HY
E
.
A SSY
r min r client seated type AW A 509 Valves hall designed for a minimum stuffingx WA C500 0 of resilient d W C s be box AW
1AP MJ
..
'
n No. A2380 or M &
water operating pressure of 200 psi. Gate valves shall be Clow List 14 Mueller Company
2 KING
..
..:
:..
--
H.
p
against r (opening with the pressure) or compressiono nin a a
9. Fire hydrants shall be Coe type t ess type e
�----
0 RZ 1 = 20
-
V l 1
tR
�
-1
--
- -
- -
A -85 with a 6 inch mechanical joint inlet an mom valve opening
pressure) conforming to AWW C502 d a
P ) 9 J P 9
......
-- :-
-
- <-- ,
M.V.O. i of 5-4 inch, two 2-1/2 inch hose nozzles with National Standard Threads 7-1/2 threads per inch
1
Threads: the new Sea Seattle Pattern 6 threads per inch 60 degrees V. a pumper nozzle with t tt and one 4 inch u_
outside diameter ofmale thread 4.875 and root diameter 4.6263. Hydrants shall have a 1-1/4 inch
o operating nut opened b turning counter clockwise (left).
pentagon P 9 P Y 9 ( )
:
2
shall f' itnthr d withoperating ntofth
10. The two 2-1/2 inch hose nozzles a be fitted with cast o threaded caps w t u e
;...
;-
same desi n and ro ortions as the hydrant stem nut. Caps shall be fitted with suitable neoprene gaskets
9 P P Y P P 9
;. Z
._..
..
for positive water tightness under test pressures.
100'
VG
11. The 4 inch pumper nozzle shall be fitted with a Storz adapter, 4 inch Seattle Thread x 5 inch Storz.�
Q
w
o -�
O
o
extrude 1-T aluminum alloy, har anodized. Threaded end
Storz adapter shall be forged and/or d 606 6 u y, dcoat a o e
C7
-(- ,� .. __ �C
LO
,n
portion shall have no lugs and two set screws 180 degrees apart. Storz face to be metal, no gasket to
43Q i•I•• 4
O d - :-:p-
weather. Storz cap to have synthetic molded rubber gasket, and shall be attached to hydrant adapter with
W
<
PO
ai
1/ 8 inch, coated, stainless steel, aircraft cable.
¢ 0
f-�
t -J a
:aa
J
`C
mod;.
o
od
r'
12. Fire hydrants shall be painted with two coats of point. Preservative paint number 43-655 safetyyellow
Z
_
:..;.
II
or approved equal.
13. All pipe and appurtenances shall be laid on a properly prepared foundation in accordance with Section
O
(�Q
(.)
-
13. Pumper connection to face roadway assembly.
7 of the current State of Washington Standard Specifications for Road and Bridge Construction This shall
r:
` " ' "
14. Fire hydrants shall be installed per City of Renton Standard Detail for fire hydrants, latest revision.
Y P Y Y ,
m necessary
elude ssa leveling of the trench bottom or the to of the foundation material as well as
rY P
tri
N
:- ;-
f
15. All watermains 10 inches and smaller to maintain a minimum cover of 36 inches below mesh grade. All
•9
placement and compaction of required
p p qu ed bedding material, to uniform grade so that the entire length of the
42
watermain 12 inches and larger shall be at a minimum of 48 inches below finish grade. Where utility
will be supported n i
pipe s pp ed o a uniformly dense, unyielding base. Pipe bedding shall be pea gravel 6 inches
XISTING GRA
EAT
N
conflicts occur, watermains are to be lowered to clear.
above and below the pipe.
f3.Oa
ENTERLINE
N
"PIGS"
16. All watermains 6 inches and larger m diameter shall be cleaned with pipe cleaning PIGS prior to
14. Sanitary sewer pipe shall
ry p p a be polyvinyl chloride (PVC) rubber gasketed ASTM D 3034, SDR 35, or ductile
.. . ._
„
disinfection The Pol pigs" shall be Girard Industries Aqua Swab -AS or approved equal, 2 lb/cu. cu. ft. density Y P 9 q PP q � / Y
iron class 50.
`-
foam with 90A durometer urethane rubber coatingon the rear of PIG onl Y
»
15. In unimproved areas manhole
p to extend minimum 6 inches and maximum 12 inches above finished
grade. IN paved area cover must slope in
g P pe all directions to match paving.
AM
�.
--
PROPOSED
GRADE
17. PIGS shall be cylinder shaped with bullet nose or square end. The contractor will perform the cleaning
Y P q P 9
"�,�,�+
g
AT CENTERL
NE - -
t--- - w
42
operation.
SURFACE WATER DRAINAGE NOTES
TES AND SPECIFICATIONS
o
w: .
18. All watermains and services shall be pressure tested to a minimum of 200 psi or 150 psi over operating
P P P P 9
; :
-
_
1 2Jr :
�
�_
Lr_1 N
pressure, in accordance with the specifications of the City of Renton and the Washington State Health
p p y g
_
1. BEFORE ANYCONSTRUCTION:
BE 0 E OR DEVELOPMENT ACTIVITY OCCURS, A PRE CONSTRUCTION MEETING MUST
L : ..
F 4
:..
{'
Department. All pressure testing shall be done in the presence of a representative of the City of Renton.
BE HELD WITH THE CITY OF RENTON PLAN REVIEWER.
. : :
W
¢ `r ,x
The quantity of water lost from the main shall not exceed the number of gallons per hour as listed in City
q y g p y
2. All construction shall be in accordance w
with the current Standard Specifications for Road, Bridge and_.,.k-•
of Renton Standard Plans & Specifications 7 11.3(11). The loss in pressure shall not exceed 5 psi during
Municipal Construction prepared b WSDOT and the American Public Works Associations APWA as
C.
Z O
.
the 2 hour test period.
amended by the City of Renton Public Works Department.
19. All watermains and services shall be disinfected b the injection of a 50 m minimum concentration
Y J PP ( )
3. The surface water drainage system shall be constructed according to the approved Ions which are
9 Y 9 PP P
STA 0+2
LT ;
... .
chlorine/water solution. Dry Calcium Hypochlorite shall NOT be placed in the pipe as laid. Chlorine shall be
on file m the Public Works De artment.
p Any deviation from the approved plans will regwre written
from the City Renton Public Works Department, Surface Water Utility Section.
y
1 - $
ERTICAL CRO
S MJ L
W
TER
�,
metered injected in accordance with Section 7-11.3 12 E or 7-11.3 12 F of the Standard Specifications
/ J ( ) ( ) P
approval of
PP Y P Y o
„
'
S
RV1GE
3
referenced above.
4. A copy of these approved plans must be on the job site whenever construction is in progress.
-„ -
-
1 8 x
-REDUCEP
fit'
--�-� -
20. A re -construction conference is required prior to any construction. A minimum of five (5) working days
P
5. Datum shall be NAVD 88 unless otherwise approved b the City of Renton Public Works Department.
PP Y Y P
Reference benchmark the
4'10
:_
1 - 4::
y
ATE V _ V
ALL
v, L),
notice is required for scheduling.
and elevations are as noted on plans.
' --
1'0^
41V
21. Twenty-four (24) hours notice will be required prior to starting new construction.;
6. II sedimentation/erosionf A acilities must be in operation prior to clearing and building construction, and
..: -BLO
KfNG
EF
22. It shall be the contractors responsibility to secure all necessary permits prior to starting construction.
P Y rY P P g
the must be satisfactorily maintained nil
y y until construction is completed and the potential for on site
- -
SERVICE
i
23. Installation of corporate stops, water services, Imes and meters shall not be done until all service
erosion has passed. p
• • •
7. All retention detention facilities must be installed and in operation prior to or m conjunction with all
/ P P
STA 1 +
,,
7: 5 LT
permits, n payment off have n m h City of
agreements, meter applications, constructionpe m ts, and pay e t fees a e been ode to y
.. 1
_,_; __;._.. , _
,_; ..
;.:_. .__;.. ,
_:_ . ;_,_:
- -
-
1 2-
-BLOWOFF -A
SY ::
•�
Renton.
..
construction activity unless otherwise approved by the Public Works Department, Surface Water Utility
y
-
»
1 - 4
CA P (MJ)
24. All connection to existing moms is to be accomplished by the City of Renton, except wet taps, which may
P All
Section.
8. Grass seed may be applied by hydroseeding. The grass seed mixture, other than City of Renton
40�
1, - B
EKING
405
be made by approved wet tap contractors with prior approval from the ublic Works Department.
necessary excavation and materials are to be supplied by the contractor and be on site prior to City
approved standard mixes, shall be submitted by a Landscape Architect and approved by the Public Works
notifications.
Department, Surface Water Utility Section.
'
25. Inspection will be accomplished by a representative of the City of Renton It shall be the contractors
9. All pipe and appurtenances shall be laid on a properly prepared foundation in accordance with Section
responsibility to notify Development Services twenty four (24) hours in advance of backfilling all construction
7-02.3(1) of the current State of Washington Standard Specification for Road and Bridge Construction.
The contractor, as well as the engineers, shall keep as -built drawings.
keep
This shall include necessary leveling of the trench bottom or the top of the foundation material, as well
26. Contractor to provide plugs and temporary f assemblies for testing and purity acceptance prior to
as placement and compaction of required bedding material, to uniform grade so that the entire length of
fin
final tie-in.
the pipe will be supported on a uniformly dense, unyielding base. All pipe bedding shall be APWA Class
All joint restraint systems (shackle rods, nuts, bolts, etc.) shall be as manufactured by the Star
., „
C , with the exception of PVC pipe. All trench backfill shall be compacted to minimum 95% for
Manufacturing Company of Columbus Ohio, or equal, approved in writing by the Public Works Department.
Pavement and structural fill and 90% otherwise per ASTM D-1557-70. Pea gravel bedding shall be 6
28. Asphalt and concrete street paving shall be sawcut to a minimum depth of two (2) inches. Oil mat
inches over and under PVC pipe.
10. Galvanized steel pipe and aluminized steel pipe for all drainage facilities shall have asphalt treatment
streets may be spade cut. All surface concrete, pavement, sidewalks, curb, gutters, and driveway approaches
#1 or better inside and outside.
shall be sawcut to a minimum depth of two (2) inches or removed to an existing expansion joint.um
11. Sturctures shall not be permitted within 10 feet of the spring line of any storm drainage pipe, or
29. A temporary cold mix asphalt patch shall be placed on the day of initial excavation with a permanent,
15 feet from the top of any channel bank.
sealed patch to be placed, to City of Renton policy, within 10 days. Call for subgrade inspection prior to
12• All catch basin grates shall be depressed 0.10 feet below pavement level.
placement of final patch. *
13. Open cut road crossing through existing public right of way will not be allowed unless specifically
30. For City projects such a telemetry conduit, the PVC pipe used shall be All Chemical process lines shall be
approved by City of Renton Planning/Building Public Works Administrator.
schedule 80 PVC pipe. Schedule 40 in unimproved areas and schedule 80 PVC pipe under improved areas.
14. Rock for erosion protection of roadside ditches, where required, shall be of sound quarry rock placed
SANITARY SEWER NOTES AND SPECIFICATIONS
to a depth of one (1) foot and must meet the following specifications:
1. All work materials shall be in conformance with the standards and specification of the City of Renton
4-8 inch rock / 40-70% passing;
Utility Department and the latest edition of the WSDOT/APWA Standards and Specifications.
2-4 inch rock / 30-40% passing; and
2. All construction shall be in accordance with "Standard Specifications for Municipal Public Works
less than 2 inch rock / 10-20% passing.
•�
Construction prepared by Washington State Chapter American Public Works Association, latest edition (APWA)
15. All building downspouts and footing drains shall be connected to the storm drainage system, unless
and City of Renton Standard Specifications.
approved by the City plan reviewer or Surface Water Utility Section. An accurately dimensioned, certified
3. All locations of existing utilities shown are approximate and it shall be the contractor's responsibility to
as -built drawing of this drainage system will be submitted to the City upon completion.
verify the true and correct location so as to avoid damage or disturbance.
16. Issuance of the building or construction permits by the City of Renton does not relieve the owner of
4. Contractor is solely responsible for the means, methods and sequences of construction and for the safety
the continuing legal obligation and/or liability connected with storm surface water disposition. Further,
of workers and others on the construction site.
the City of Renton does not accept any obligation for the proper functioning and maintenance of the
5. It shall be the responsibility of the contractor to obtain street use and any other related permits prior to
system provided during construction.
any construction.
17. The Contractor shall be responsible for providing adequate safeguard, safety devices, protective
6. Plans approved by the City of Renton, Public Works Department shall take precedence over all other plans.
equipment, flaggers, and any other needed actions to protect the life, health, and safety of the public,
7. A copy of these approved plans must be on the job site whenever construction is in progress.
and to protect property in connection with the performance of work covered by the contract. Any work
8. The contractor shall provide the City of Renton with an as -built drawing of the sanitary sewer system,
within the traveled right of way that may interrupt normal traffic flow shall require a traffic control plan
which has been stamped and signed by a licensed professional engineer or licensed professional surveyor.
approved by the Public Works Department, Transportation Systems Division. All sections of the WSDOT
9. Backfill shall be place equally on both sides of the pipe in layers with a loose average depth of 6
Standard Specifications 1-07-23 Traffic control shall apply.
inches, maximum depth of 8 inches, thoroughly tamping each layer to 95 percent of maximum density.
18. Special drainage measures will be required if the project location is within the aquifer protection area
These compacted layers must extend for one pipe diameter on each side of the pipe or to the side of the
(APA).
trench. Materials to complete the fill over pipe shall be the some as described.
10. Open cut road crossings for utility trenches on existing traveled roadway shall be backfilled with crushed
rock and mechanically compacted Cuts into the existing asphalt shall be neatline cut with saw in a
continuous line. A temporary mix patch must be placed immediately after backfill and compaction. A
permanent hot mix patch shall be placed within 10 days and shall be per City of Renton current standards.
11. Datum shall be City of Renton, 1988 NAVD.
12. All disturbed areas shall be seeded and mulched or otherwise stabilized to the satisfaction of the
Department for the prevention of on site erosion after the completion of construction.
PITTMAN ENGINEERING
Civil Engineering and Consulting
John J. Pittman, P.E. 12819 SE 38th Street, *159
Bellevue, WA 98006
(425) 562-7226
'•pp9
0 1 PER CITY OF RENTON COMMENTS
x 2 MOVED PROPOSED FIRE HYDRANT
4
*31070
EXPIRES 10/14/088 ( NO. I REVISION
%qw�lwsp
I TLE PRIVATE LI
SCAL HOr: 20'; =5
EROSION CONTROL
19. All limits of clearing and areas of vegetation preservation as prescribed on the plan(s) shall be
clearly flagged in the field and observed during construction.
20. All required sedimentation/erosion control facilities must be constructed and in operation prior to land
clearing and/or construction to ensure that sediment laden water does not enter the natural drainage
system. All erosion and sediment facilities shall be maintained in a satisfactory condition until such time
that clearing and/or construction is complete and potential for on site erosion has passed. The
implementation, maintenance, replacement and additions to erosion/sedimentation control systems shall be
the responsibility of the permitee.
21. The erosion and sedimentation control systems depicted on his drawing are intended to be minimum
requirements to meet anticipated site conditions. As construction progresses and unexpected or seasonal
conditions dictate, the permitee shall anticipate that more erosion and sedimentation control facilities will
be necessary to ensure complete siltation control on the proposed site. During the course of
construction, it shall be the obligation and responsibility of the permitee to address any new conditions
that may be created by the activities and to provide additional facilities, over and above minimum
requirements, as may be needed, to protect adjacent properties and water quality of the receiving
drainage system.
22. Approval of this plan is for erosion/sedimentation control only. It does not constitute an approval of
storm drainage design, size nor location of pipes, restrictors, channels, or retention facilities.
23. During the time period of October list through April 30th, all project disturbed soil areas greater
than 5,000 square feet, that are to be left unworked for more than 12 hours, shall be covered by
mulch, sodding or plastic covering.
24. In any area which has been stripped of vegetation and where no further work is anticipated for a
period of 30 days or more, all disturbed areas must be immediately stabilized with mulching, grass
planting or other approved erosion control treatment applicable to the time of year. Grass seeding alone
will be acceptable only during the months of April through September, inclusive. Seeding may proceed,
however, whenever it is in the interest of the permitee, but must be augmented with mulching, netting or
other treatment approved by the City of Renton, outside the specified time period.
25. For all erosion/sediment??ation control ponds where the dead storage depth exceeds 6 inches, a
fence is required with a minimum height of three (3) feet, 3:1 side slopes.
26. A temporary gravel construction entrance, 24 feet x 50 dwwr x 8 inches of 4 to 6 inch quarry
spalls shall be located at all points of vehicular ingress and egress to the construction site.
EXISTING UTILITY LOCATIONS SHOWN HEREON ARE APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UNDERGROUND
UTILITIES PRIOR TO COMMENCING CONSTRUCTION. NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES
ARE SHOWN HEREON. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES
NOT SHOWN IN THEIR PROPER LOCATION.
JJP 08/02/07 JJP '"ice
JJP 08/10/07 JJP DESIGNED:
BOYD AS NOTED
JJ P
TLR
o,
JJP AT r,_._
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATU M
CITY OF
ML
It RENTON
Planning/Building/Public Works Dept.
S A 1 +59 JINFILTRATION PIT
C - TYPE I TOP=4 9.0
RIM=413.0 IE=40 .5
IE 408.5 10 LF 8" SID ® 5.0%
BENCHMARK
NAVD 88 - MAC NAIL IN ASPHALT ROAD APPROXIMATELY 45
FEET EAST OF SOUTHEAST CORNER OF SITE
ELEVATION=420.31
BASIS OF BEARINGS
MONUMENTED CENTERLINE OF NE 12th STREET BETWEEN
MONUMENT #1843 AND #159
DATUM
DATUM IS PER CITY OF RENTON SURVEY. COORDINATES ARE
WASHINGTON COORDINATE SYSTEM OF 1983/1991 NORTH ZONE.
ELEVATIONS ARE NAVD 88
CALL BEFORE YOU DID 1-800-424-5555
RECOMMENDED CHECKED FOR COMPLIANCE
FOR APPROVAL TO CITY STANDARDS