Loading...
HomeMy WebLinkAboutTED4003417.11W m 0 ono z a U gN0 z Y N V LU w A, oLLz 00, w�w m �6w Y N = OPO N Q aa� BLUELINE FILTER FABRIC MATERIAL 60" WIDE ROLLS. USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE. j 2 BY 2" 14 GA. WIRE / FABRIC OR EQUIV. 2,T0„J� i 1 2° 1 l 6' MAX l i FILTER FABRIC MATERIAL - 2" BY 2" BY 14 GA. - WIRE FABRIC OF EQUIV. PROVIDE 3/4" - 1.5" WASHED GRAVEL BACKFILL IN TRENCH AND ON BOTH SIDES OF FILTER FENCE FABRIC ON THE SURFACE. 2" BY 4" WOOD POST ­' ALT: STEEL FENCE POSTS, BRUSH BARRIER NTS NOTES I. FOR SHEET RUNOFF OR FOLLOWING DISCHARGE FROM A SEDIMENT TRAP OR POND. 2. MAXIMUM SLOPE STEEPNESS PERPENDICULAR TO FENCE LINE IS 1:1. 3. MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE FENCE OF 100 FT. 4. IF 50% OR LESS OF THE SOIL, BY WEIGHT, IS FINE PARTICLES SMALLER THAN THE U.S. STANDARD SIEVE NO. 200, THE EOS SHOULD BE EQUAL TO OR SMALLER THAN THE SIEVE 517E THAT 85% OF THE SOIL CAN PASS THROUGH. BURY BOTTOM OF FABRIC MATERIAL IN 8" BY 12" TRENCH 5. THE TRENCH SHALL BE BACKFILLED NTH 3/4" MINIMUM DIAMETER WASHED GRAVEL. 6. FII TFR FABRIC FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED. 7. FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS SHALL BE MADE IMMEDIATELY. FILTER FABRIC FENCE DETAIL ADOPTED 6 CITY OF RENTON STANDARD PLANS UST DATE,: 04/04 nAT--RFvicln�l aY APPR n DWG. NAME: 8066 SP PAGE: 3066 h�C3 W S q��0 � r 0 1 � 32126 �FSI STE' S/ONAL EXPIRES: 5/5/10 ASmBLJILT 1 1 AS -BUILT Rol R/W m c) � LL "o F- <LL'Z r V1C`TI nIn nnnllAln W Ili EXISTING GROUND 100' MIN. (MAY BE REDUCED TO 50' MIN FOR SITES WITH LESS THAN 1 ACRL OF LXPOSLD SOIL.) R=25 cif I 15' .MIN. Pi AN EXISTING DRIVEWAY - RAMP OR SITE ACCESS ROAD PLAN NTS 1. Use 4" to 8" quarry spoils or crushed rock for surfacing as shown. Material wUh 'fines' is not acceptable. 2. The 100' minimum length shall be lengthened as necessary to insure material is not tracked into the public right-of-way. TEMPORARY CONSTRUCTION ENTRANCE ADOPTED CITY OF RENTON 1 v O DWG. NAME: STANDARD PLANS IST DATE: 04/04 8068 SP PAGE: B068 f1ATPn - RF1/ISIfIIJ -- RY APPR n 4. 77 777 REVISION WOP BY I DATE I APPR R=341715 SURVEYED-. PROJECT MANAGER: BRAN J. DARROW, PE PROJECT ENGINEER: NICOLE HERNANDEZ, PE PROJECT DES04ER: JORDAN M. AL-KAHTANI ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY EROSION/SEDIMENTATION CONTROL - PLAN NOTES 1. THE APPROVED CONSTRUC77ON SEQUENCE SHALL BE AS FOLLOWS.• A. CONDUCT PRE- CONS TRUC7ION MEETING. B. FLAG OR FENCE CLEARING LIMITS C. OBTAIN A DEM0LI77ON PERMIT AND DEMOLISH/REMOVE EXIS77NG BUILDINGS AS SHOWN ON SHEET 2. D. POST SIGN WITH NAME AND PHONE NUMBER OF TESC SUPERVISOR. E. INSTALL CATCH BASIN PROTECTION AS REQUIRED. F. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). G. INSTALL PERIMETER PRO7ECT70N (SILT FENCE, BRUSH BARRIER, ETC.). H. GRADE AND STABILIZE CONSTRUC77ON ROADS. L CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. J. CLEAR AND GRADE LOTS K. MAINTAIN EROSION CONTROL MEASURE /N ACCORDANCE WITH CITY OF RENTON STANDARDS AND MANUFACTURERS RECOMMENDATIONS. L. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE, THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY TESC MINIMUM REQUIREMENTS. M. COVER ALL AREAS WITHIN THE SPECIFIED 77ME FRAME WI7H STRAW, WOOD FIBER MULCH, COMPOST, PLAS77C SHEETING, CRUSHED ROCK OR EQUIVALENT. N. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN 7 DAYS. 0. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. P. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BEST MANAGEMENT PRAC77CES REMOVED IF APPROPRIATE. 2. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONS77TUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G., SIZE AND LOCAT70N OF ROADS, PIPES, RESTR/CTORS, CHANNELS, RETENT70N FACILITIES, UTILITIES, ETC.). J. THE IMPLEMENTATION OF THIS ESC PLAN AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES /S THE RESPONSIBILITY OF THE PERM/TTEE/CONIRA CTOR UN77L ALL CONSTRUCTION /S APPROVED. 4. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE SET BY SURVEY AND CLEARLY FLAGGED /N THE FIELD BY A CLEARING CONTROL FENCE PRIOR TO CONSTRUCTION. DURING THE CONSTRUCT70N PERIOD, NO DISTURBANCE OR REMOVAL OF ANY GROUND COVER BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE PERM/T7EE/CONTPA CTOR FOR THE DURA77ON OF CONSTRUCTION. 5. THE ESC FACIL177ES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL CLEARING AND GRADING AC77077ES IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT -LADEN WATER DOES NOT ENTER THE DRAINAGE SYSTEM OR VIOLATE APPLICABLE WATER STANDARDS. WHEREVER POSSIBLE, MAINTAIN NATURAL VEGETA77ON FOR SILT CONTROL. 6. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACIL177ES SHALL BE UPGRADED (E.G, ADDITIONAL SUMPS, RELOCAT70N OF DITCHES AND SILT FENCES, ETC.) AS NEEDED FOR UNEXPECTED STORM EVENTS ADD177ONALLY, MORE ESC FACIL177ES MAY BE REQUIRED TO ENSURE COMPLETE SILTATION CONTROL. THEREFORE, DURING THE COURSE OF CONSMUC77ON IT SHALL BE THE OBLIGA77ON AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDIT70NS THAT MAY BE CREATED BY HIS AC77077ES AND TO PROVIDE ADDIT70NAL FACILITIES OVER AND ABOVE THE MIN/MUM REQUIREMENTS AS MAYBE NEEDED. 7. THE ESC FACIL177ES SHALL BE INSPECTED BY THE PERMITTEE/CONIRA CTOR DAILY DURING NON -RAINFALL PERIODS, EVERY HOUR (DAYLIGHT) DURING A RAINFALL EVENT, AND AT THE END OF EVERY RAINFALL, AND MAINTAINED AS NECESSARY TO ENSURE THEIR CON77NUED FUNCTIONING. IN ADD/T70N, TEMPORARY SILTA7ON PONDS AND ALL TEMPORARY S/LTA77ON CONTROLS SHALL BE MAINTAINED IN A SA77SFACTORY CONDIT70N UN77L SUCH TIME THAT CLEARING AND/OR CONSTRUCT/ON /S COMPLETED, PERMANENT DRAINAGE FACIL/77ES ARE OPERATIONAL, AND THE POTENTIAL FOR EROSION HAS PASSED. WRITTEN RECORDS SHALL BE KEPT DOCUMEN77NG THE REVIEWS OF THE ESC FACILITIES. 8. THE ESC FACILITIES ON INAC77VE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 48 HOURS FOLLOWING A STORM EVENT. 9. ALL DENUDED SOILS MUST BE STABILIZED WITH AN APPROVED TESC METHOD (E.G. SEEDING, MULCHING, PLAS77C COVERING, CRUSHED ROCK) WITHIN THE FOLLOWING TIMELINES.• * MAY 1 TO SEPTEMBER 30 - SOILS MUST BE STABILIZED WITHIN 7 DAYS OF GRADING. * OCTOBER 1 TO APRIL 30 - SOILS MUST BE STABILIZED WITHIN 2 DAYS OF GRADING. 10. AT NO 77ME SHALL MORE THAN 1' OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 11. STABILIZED CONSTRUC77ON ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUC77ON AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDIT70NAL MEASURES, SUCH AS WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURAT70N OF THE PROJECT. 12. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY /S TO FUNC77ON UL77MATELY AS AN /NFIL IRAT70N OR DISPERSION SYSTEM, THE FACILITY SHALL NOT BE USED AS A TEMPORARY SETTLING BASIN. NO UNDERGROUND DETENT70N TANK, DETENTION VAULT, OR SYSTEM WHICH BACKS UNDER OR INTO A POND SHALL BE USED AS A TEMPORARY SETTLING BASIN. 13. WHERE SEEDING FOR TEMPORARY EROSION CONTROL /S REQUIRED, FAST GERM/NA 77NG GRASSES SHALL BE APPLIED A T AN APPROPR/A TE RA TE (EXAMPLE: ANNUAL OR PERENNIAL RYE APPLIED AT APPROXIMATELY 80 POUNDS PER ACRE). 14. WHERE STRAW MULCH IS REQUIRED FOR TEMPORARY EROSION CONTROL, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF 2': 15. ALL ERGS/ON/SED/MENTAT70N CONTROL PONDS WITH A DEAD STORAGE DEPTH EXCEEDING 6" MUST HAVE A PERIMETER FENCE WITH A MINIMUM HEIGHT OF 3. 16. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CITY OF RENTON STANDARDS AND SPECIFICA TIONS 17. THE ESC FACILITIES SHALL BE CONSTRUCTED /N ACCORDANCE WITH THE DETAILS ON THE APPROVED PLANS. LOCA77ONS MAY BE MOVED TO SUIT FIELD CONDITIONS, SUBJECT TO APPROVAL BY THE ENGINEER AND THE CITY OF RENTON INSPECTOR. 18. A COPY OF THE APPROVED EROSION CONTROL PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 19. ALL LOTS ADJOINING OR HAVING ANY NATIVE GROWTH PROTECTION EASEMENTS (NGPE) SHALL HAVE A 4' HIGH TEMPORARY CONSTRUCTION FENCE (CYCLONE OR PLASTIC MESH) SEPARATING THE LOT (OR BUILDABLE PORTIONS OF THE LOT) FROM THE AREA RESTRICTED BY THE NGPE AND SHALL BE INSTALLED PRIOR TO ANY GRADING OR CLEARING AND REMAIN /N PLACE UNTIL A DWELLING IS CONSTRUCTED AND OWNERSHIP TRANSFERRED TO THE FIRST OWNER/OCCUPANT. 20. CLEARING LIMITS SHALL BE DELINEATED WITH A CLEARING CONTROL FENCE. THE CLEARING CONTROL FENCE SHALL CONSIST OF A 4' HIGH TEMPORARY CONSTRUC77ON FENCE ADJACENT THE DRIP LINE OF TREES TO BE SAVED, WETLAND OR STREAM BUFFERS, AND SENSITIVE SLOPES. CLEARING CONTROL FENCES ALONG WETLAND OR STREAM BUFFERS OR UPSLOPE OF SENSITIVE SLOPES SHALL BE ACCOMPANIED BY AN EROSION CONTROL FENCE. IF DETERMINED APPROPRIATE BY CITY OF RENTON A 6-FT. HIGH CHAIN LINK FENCE MAY BE REQUIRED. 21. OFF -SITE STREETS MUST BE KEPT CLEAN AT ALL TIMES. IF DIRT IS DEPOSITED ON THE PUBLIC STREET SYSTEM, THE STREET SHALL BE IMMEDIATELY CLEANED WITH POWER SWEEPER OR OTHER EQUIPMENT. ALL VEHICLES SHALL LEAVE THE SI7F BY WAY OF THE CONSTRUC77ON ENTRANCE AND SHALL BE CLEANED OF ALL DIRT THAT WOULD BE DEPOSITED ON THE PUBLIC STREETS 22. ANY CATCH BASINS COLLEC77NG RUNOFF FROM THE SITE, WHETHER THEY ARE ON OR OFF THE SITE SHALL HAVE THEIR GRATES COVERED WITH FILTER FABRIC DURING CONSTRUCTION. CATCH BASINS DIRECTLY DOWNSTREAM OF THE CONSTRUCTION ENTRANCE OR ANY OTHER CATCH BASIN AS DETERMINED BY THE CITY INSPECTOR SHALL BE PROTECTED WITH A 'r/LTER FABRIC SOCK" OR EQUIVALENT. 23. THE WASHED GRAVEL BACKFILL ADJACENT TO THE FILTER FABRIC FENCE SHALL BE REPLACED AND THE FILTER FABRIC CLEANED IF IT IS NONFUNCT70NAL BY EXCESSIVE SILT ACCUMULA7ON AS DETERMINED BY THE CITY OF RENTON. ALSO, ALL INTERCEPTOR SWALES SHALL BE CLEANED IF SILT ACCUMULATION EXCEEDS ONE -QUARTER DEPTH. 24. ROCK FOR EROSION PROTECTION OF ROADWAY DITCHES, WHERE REQUIRED, MUST BE OF SOUND QUARRY ROCK, PLACED TO A DEPTH OF 1' AND MUST MEET THE FOLLOWING SPECIFICATIONS. • 4"-8" ROCK/409-709 PASSING; 2"-4" ROCK/309-40Y. PASSING, AND 1"-2" ROCK/109-20/ PASSING. 25. IF ANY PART(S) OF THE CLEARING LIMIT BOUNDARY OR TEMPORARY EROSION/SEDIMENTATION CONTROL PLAN IS/ARE DAMAGED, 1T SHALL BE REPAIRED IMMEDIA TEL Y. 26. ALL PROPERTIES ADJACENT TO THE PROJECT SITE SHALL BE PROTECTED FROM SEDIMENT DEPOS177ON AND RUNOFF. 2Z DO NOT FLUSH CONCRETE BY-PRODUCTS OR TRUCKS NEAR OR INTO THE STORM DRAINAGE SYSTEM. IF EXPOSED AGGREGATE IS FLUSHED INTO THE STORM SYSTEM, IT COULD MEAN RE -CLEANING THE EN77RE DOWNSTREAM STORM SYSTEM, OR POSSIBLY RE-LAYING THE STORM LINE. 28. PRIOR TO THE OCTOBER 1 OF EACH YEAR (THE BEGINNING OF THE WET SEASON), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED /N PREPARATION FOR THE WINTER RAINS. THE IDENTIFIED DISTURBED AREA SHALL BE SEEDED W/TH/N ONE WEEK AFTER OCTOBER 1. A SITE PLAN DEPICTING THE AREAS TO BE SEEDED AND THE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE PUBLIC WORKS CONSTRUCTION INSPECTOR. THE INSPECTOR CAN REQUIRE SEEDING OF ADDITIONAL AREAS /N ORDER TO PROTECT SURFACE WA TERS, ADJACENT PROPERTIES, OR DRA/NA GE FACILITIES. 29. DURING THE WET SEASON (OCTOBER 1 - APRIL 31), STOCK PILES AND STEEP CUT AND FILL SLOPES ARE TO BE PROTECTED IF UNWORKED FOR MORE THAN 12 HOURS. JO. DURING THE WET SEASON (OCTOBER 1 - APRIL 31), COVER MATERIAL SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE STOCKPILED ON S1 TE. 31. DURING THE WET SEASON (OCTOBER 1 - APRIL 31), FIFTY LINEAR FEET OF SILT FENCE PER ACRE OF DISTURBANCE MUST BE STOCKPILED ON SI TE. 32. DURING THE WET SEASON (OCTOBER 1 - APRIL 31), THE FREQUENCY OF MAINTENANCE REVIEW INCREASE FROM MONTHLY TO WEEKLY. WRZONTAAL- o 19L0i19s 1 ,, TESC DETAILS & NOTES 6/3/2006 •. CITY OF �� � FlELDB�K: RRENTON PARK VIEW S'' PACE DATUM � DRAWING N0: Planning/Building/Public Works Dept. LUA 06- 1 32-SHPL 05- 1 03 LND-20-0470 SHEET: 5 OF-1 1 0 2007 THE BLUELINE GROUP