Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutSWP2703426.43FINISHED
GRADE
/ \ /
SEE ROADWAY
SECTIONS ON
DWG RS01-RS05
BANK RUN
FOR PAVEMENT
� 1 GRAVEL FOR
RESTORATION 1 TRENCH
BACKFILL
8 TO 14 PIPE_�\`
GRAVEL BACKFILL
FOR PIPE ZONE
BEDDING
F I.D. + ),, � „ & 12y' DIA]
8"-30" SD & SS TRENCH CROSS-SECTION
non
-- ROSEWATER
CLIENTS PEOPLE PERFORMANCE
TuigF� F[I _.
R ' S DMJM HARRIS AECOM APPROVED FOR CONSTRUCTION
Wq �'
10900 NE 8TH STREET, SUITE 750 oe
BELLEVUE, WASHINGTON 98004 —
PHONE: (425) 454-5600 FAX: (425) 454-0220 °�80 \���� CITY OF RENTON DATE
Nk ECG
t2(
REVISION
BY I DATE I APPR
SEE ROADWAY
SECTIONS ON
DWG RS01-RS05
FOR PAVEMENT
!x
RESTORATION
CORRUGATED
POLYETHYLENE
STORM PIPE
(CPEP)
CONSTRUCTION
GEOTEXTILE FOR
SEPARATION
FINISHED
GRADE
BANK RUN
GRAVEL FOR
TRENCH
BACKFILL
v xX
//x
GRAVEL BACKFILL
FOR PIPE ZONE
BEDDING
24" OVER
EXCAVATION*
* UNSUITABLE SOILS
ARE NOTED IN
GEOTECHNICAL REPORT
48" SD TRENCH CROSS-SECTION
N TS
MH OR TYPE 2
1' MIN (TYP) L CB BASE
CONSTRUCTION
GEOTEXTILE FOR 2'
SEPARATION
(MIN. 1' OVERLAP)
QUARRY SPALLS
STRUCTURE FOUNDATION DETAIL
SURVEYED:
DESIGNED:
K. SMITH
DRAWN:
R. EDRALIN
CHECKED:
M. DE LILLA
APPROVED:
K. SMITH
SCALE: VARIES
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
N TS
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATU M
CITY OF
RENTON
Public Works Dept.
FED AID NO.: ARRA-0167(044)
D=342639
RAINIER AVE S (SR 167) L)'t:
IMPROVEMENTS PROJECT
FIELDI
PHASE 1 PAGE:
SHATTUCK AVE S STORMWATER BYPASS DRAW
STORM DRAINAGE & UTILITIES
DETAILS
i
oa©omo©: