Loading...
HomeMy WebLinkAboutTRO4103430.1 (2)u7 Q0 0 z O z w ry / w O ry r .—. JOINT UTILITY TRENCH LEGEND JT P T C G X# X# JOINT UTILITY TRENCH INSTALL X" DIAMETER CONDUIT - PSE POWER INSTALL X" DIAMETER CONDUIT - CENTURYLINK INSTALL X" DIAMETER CONDUIT - COMCAST INSTALL X" DIAMETER CONDUIT - PSE GAS TRENCH SECTION X#, SEE SHTS 175-179 ® INSTALL 264 TA VAULT - CENTURYLINK ® INSTALL PEDESTAL - CENTURYLINK o EX. SERVICE WIRE BOX - COMCAST INSTALL 5106 DEEP VAULT - PSE ® INSTALL. J-BOX - PSE • INSTALL SECONDARY HANDHOLE - PSE ❑� INSTALL ABOVE GROUND TRANSFORMER - PSE • INSTALL INTERCEPT POINT - PSE I� INSTALL TOTAL UNDERGROUND TRANSFORMER - PSE rg INSTALL 2436 VAULT - COMCAST ® INSTALL 2424 VAULT - COMCAST INSTALL 17"x3O" VAULT - COMCAST 0 INSTALL ROUND VAULT - COMCAST W-A INSTALL 253 TA - COMCAST - — — — — — — — — - APPROXIMATE CONSTRUCTION LIMITS — — PERMANENT EASEMENT ROW LINE - - PROPERTY LINE CALL 2 DAYS BEFORE• 1-800-424-5555 C CD C PLAN 0 5 10 20 40 60 SCALE IN FEET cw"k 753 9th Avenue N 2502 Jefferson Avenue Seattle, WA 98109 Tacoma, WA 98402 (206) 286-1640 (253) 627.0720 www,kpg.com GENERAL JOINT UTILITY TRENCH PLAN NOTES 1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE GAS, COMCAST, AND CENTURYLINK. 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL. CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE FRANCHISE UTILITIES. 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS CONVERSION. 4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR. LO THE CITY OF RENTON. cfl 5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED w FOR THEIR CONVERSION. w 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE CD MADE BY THE FRANCHISE UTILITIES. N7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE PROPERTY OWNER FROM THE RIGHT—OF—WAY TO EXISTING PRIVATE METERS. 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS AND PROFILE SHEETS 174-192. ADJUST THE HORIZONTAL ALIGNMENT AND z VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND _► PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER Q UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO AID IN THE LAYOUT OF THE TRENCH, SHEETS 180-192. 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY STRUCTURES NO LONGER IN USE. 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER DESIGN. 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. VAULT SCHEDULE ID VAULT FRANCHISE UTILITY ID OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN/FROM LEFT CONDUIT OUT/TO RIGHT P1 5106 DEEP VAULT PV01 PSE PSE CONTRACTOR 6-6" 2p,4p Q1 264 TA #913 CENTURYLINK CENTURYLINK CONTRACTOR 1q 2q,3q C1 2436 MEDIUM DUTY VAULT - COMCAST COMCAST CONTRACTOR 1c,2c 3c,4c P2 THREE PHASE J-BOX J03 PSE PSE CONTRACTOR 4-4" 1p,3p,1-4" Q2 C2 264 TA 2436 MEDIUM DUTY VAULT - - CENTURYLINK COMCAST CENTURYLINK COMCAST CONTRACTOR CONTRACTOR - - 1q 1c2c P27 INTERCEPT POINT IP01 A PSE - CONTRACTOR - 2-4" P28 INTERCEPT POINT IP01 A PSE - CONTRACTOR - 2-6" P29 INTERCEPT POINT IP01A PSE - CONTRACTOR - 2-6" P30 INTERCEPT POINT IP01 A PSE - CONTRACTOR - 2-4" 1 P55 REMOVE VAULT PV01A PSE - CONTRACTOR - - P56 REMOVE VAULT J04 PSE - CONTRACTOR - - P82 SECONDARY HANDHOLE H1A PSE PSE CONTRACTOR - - P84 INTERCEPT POINT IP01 A PSE - CONTRACTOR - 2-6" j"al- CITY OF RENTON BID Public Works Department DOCUMENTS APPROVED FOR CONSTRUCTION BY: DATE: ! 44�/ T=3430104 CORRESPONDING SHEETS CATEGORY SHEET RIGHT OF WAY PLANS 7 EXISTING CONDITIONS 55 SITE PREPARATION & TESC PLAN 69 ALIGNMENT PLAN 81 ALIGNMENT PROFILE _DRAINAGE PLANS 93 104 _ _ DRAINAGE PROFILE _ 114 WATER PLAN 132 If WATER PROFILE 146 JOINT UTILI"f'Y TRENCH P`=_AN� JOINT UTILITY TRENCH PROFILES 180 PROPERTY RESTORATION PLANS 195 CHANNELIZATION & SIGNING PLAN 217 ILLUMINATION PLANS 228 — IRRIGATION PLAN 282 LANDSCAPE PLAN ! 294