Loading...
HomeMy WebLinkAboutTRO4103430.10 (2)w CD N 0 U 0 0 / V) Ln Ln 0 / z 0 z w / v w ry n OR GENERAL JOINT UTILITY TRENCH PLAN NOTES 2 � EXISTING 1. UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY /® J P41 "`� _ COORDINATION, LAYOUT, SURVEYI NG, TRENCHING, EXCAVATION, BEDDING, BACKFILL 8 ® Gp AND RESTORATION FORTHE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE / 17 // v PLAN THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE /® F _ — _ 19 9-- FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE 0 5 10 20 40 60 GAS, COMCAST, AND CENTURYLINK. 3 r 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE / / f � � SCALE IN FEET / J2 / / 3 APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL co CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE I I J TOR SHALI BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE { /® /� 4 � � � \ � � � � � `� WALGREEN'S CONTRACTOR � � REQUIREMENTS , REILLY S 1 / , / FRANCHISE UTILITIES. 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL J3 f CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS CONVERSION. 4. THE CONTRACTOR CONDUITS M / �� , / / ' •' � ... ) / C WILL FURNISH AND INSTALL ALL VAULTS AND „ONDI�ITS FOR THE CITY OF RENTON. �'co 5. COMC.AST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED � 1 FOR THEIR CONVERSION. \1— ® — — — _ _ J 1 - _ v L- G _ G—�� �c�! 1 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE � ✓ MADE MA�E. BY THE FRANCHISE UTILITIES - — -- — . 7. UNDERGROUND SERVICE CONNECTI ONS FOR POWER SHALL BE MADE BY THE a „r jT 4 `�. ` ®` PROPERTY OWNER FROM THE RIGHT-OF-WAY TO EXISTING PRIVATE METERS. 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS C2 AND 7 - PROFILE SHEETS 1.4 192. ADJUST THE HORIZONTAL ALIGNMENT AND J 1 Imo- ��,P - u UG VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND G G GP UGP-- —UGP UGP UGP -�� ��� ` w ��p-- u I _ /` \ `� ` PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM w — — — sWG UGP -a �- I — / \ ®a COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER / UGP U- UGP---}- UhP GP UGP--- U -- Z— / _ \\ �'` UNDERGROUND UTILITIES, T (' T T GP . UGP UZP Q14 e DERGRO_ ND HE CONTRACTOR RACTQR SHALL VERTICALLY ICALLY TRANSITION THE e ® // // // / • •... •, , \ ®� TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE _ UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE T / / 1 / UGp e U E 0 / / 1+ I I // // °::'•:`•••GN\\ '� AID IN THE LAYOUT OF THE TRENCH, SHEETS 180-192. o /23 // �G �� \ 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL Cn / �, EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS _;7,; / / , , , ,,•,, • „ ' 46CL I I //UGp ��� •,� COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, oc,, 47 / ::::....,, ``� �Go CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY STRUCTURES NO LONGER IN USE. • 10 INCLUDE ILLUMINATION AND SIGNAL. CONDUIT IN JOINT TRENCH WHERE POSSIBLE. f/ RAINIER AVE S f I I / \� �G SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER > o :::.•:::::•::•::. °:::.. I p'4--. �y DESIGN. CALL 2 DAYS BEFORE YOU DIG 1-800-424-5555 JOINT UTILITY TRENCH LEGEND FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. WALKER'S RENTON SUBARU CONSTRUCTION NOTES 4" DIAMETER CONDUIJ-CENTURYLINK (2 CONDUIT) 3" DIAMETER CONDDPIT-COMCAST (1 CONDUIT) 3" DIAMETER C09DUIT-COMCAST (3 CONDUIT) A6" DIAMETER CONDUIT-PSE GAS (1 CONDUIT) A6" DIAMETER CONDUIT-PSE POWER (2 CONDUIT) AEND INSTALLATION OF 6" DIAMETER CONDUIT-PSE GAS - APPROXIMATE STA 47+40, LT 753 9th Avenue N 2502 Jefferson Avenue Seattle, WA 98109 Tacoma, WA 98402 (206) 286-1640 (253) 627.0720 www,kpg.com 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TC RE- AIN. VAULT SCHEDULE ID VAULT FRANCHISE UTILITY ID OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN/FROM LEFT CONDUIT OUT/TO RIGHT Q13 264 TA #925 CENTURYLINK CENTURYLINK CONTRACTOR 29q,30q 31 q,32q C24 2436 MEDIUM DUTY VAULT - COMCAST COMCAST CONTRACTOR 40c,41 c,50c 43c,44c,45c Q14 264 TA #926 CENTURYLINK - CENTURYLINK CONTRACTOR 31q,32q - C25 2436 MEDIUM DUTY VAULT - COMCAST COMCAST CONTRACTOR 43c,44c,45c - C28 17" 00" - COMCAST COMCAST CONTRACTOR 50c 1-3" P41 CONNECT TO EX. VAULT PV03 PSE - CONTRACTOR - 42p,43p P42 CONNECT TO EX. VAULT SW04 PSE - CONTRACTOR - 40p,41p P43 CONNECT TO EX. VAULT J24 PSE - CONTRACTOR 40p,41 p,42p,43p - P83 CONNECT TO EX. VAULT SWO3 PSE - CONTRACTOR 38p,39p - C39 INTERCEPT POINT - COMCAST - CONTRACTOR 1-3" - CITY OF RENTON B i D Public Works Department DOCUMENTS APPRXR CONSTRUCTION BY: DATE: 41" ,/-. T-3430113 CORRESPONDING SHEETS CATEGORY SHEET RIGHT OF WAY PLANS 16 EXISTING CONDITIONS 64 SITE PREPARATION & TESC PLAN 78 ALIGNMENT PLAN 90 ALIGNMENT PROFILE _ DRAINAGE PLANS 102 113 DRAINAGE PROFILE 123,124 WATER PLAN 141 WATER PROFILE - 155 JOINT UTILITY TRENCH PLAN - JOINT UTILITY TRENCH PROFILES 189 PROPERTY RESTORATION PLANS 204 CHANINELIZATION & SIGi'�ING PLAN 22:� ILLUMINATION PLANS 237 IRRIGATION PLAN 291 LANDSCAPE PLAN 303