Loading...
HomeMy WebLinkAboutTRO4103430.130CD N N 7D 7D Ln 0 / z 0 z w v w D O Of / IM 7 CONSTRUCTION LIMIT sm WALL C 0 V 7D x SW GRADY WAY NW CORNER AT SW GRADY WAY INTERSECTION PLAN NTS SW CORNER AT SW GRADY WAY INTERSECTION PLAN N TS � 14 LL1 z W .12. > 16 \ Q 6 SOUND FORD U W 3 Z �5 . 4 ` CONSTRUCTION WALL B LIMIT & ROW O 8 9 2 12 4 1 WALL A o i (TYP) 2 6 00 00 . 3' 7 9 O 10 �yA 9 °°00 ° EXPANSION JOINT, TYP. SIDEWALK SCORE JOINT, DO - 10 pp TYP. o° 13 o00o D ° 10 SW GR NE CORNER AT SW GRADY WAY INTERSECTION PLAN NTS DYWAY/ i__� SWCn GRA W � 14 Z W 9 > Q 15 o LLJ % CONSRUCTION LIMIT Z � 12 i 13 i i i f YANKEE GRILL SE CORNER AT SW GRADY WAY INTERSECTION PLAN NTS T-3430209 CONSTRUCTION NOTES O1 INSTALL GATEWAY SIGN WALL (A), SEE DETAILS, SHEETS 270-271. O2 INSTALL DECORATIVE ART POLES, TYP. SEE DETAILS, SHEETS 273-274. O3 INSTALL DECORATIVE CONCRETE FINISH (COLOR A). SEE DETAILS, SHEET 281, AND NOTE, THIS SHEET. ® INSTALL WALL (B & C) WITH SKATEBLOCKS. SEE DETAIL, SHEET 271. �5 INSTALL TRASH RECEPTACLE. SEE SURFACE MOUNT DETAIL, SHEET 281, AND TRASH RECEPTACLE SCHEDULE., THIS SHEET. © INSTALL DECORATIVE CONCRETE FINISH (COLOR B). SEE DETAILS, SHEET 281 AND NOTE, THIS SHEET. O7 SCORED CEMENT CONCRETE SIDEWALK AND CONSTRUCTION JOINT LAYOUT. SEE DETAILS, SHEET 281. �8 PLANTING AREA, TYP. �9 INSTALL DECORATIVE CROSSWALK TREATMENT. SEE DETAIL, SHEET 281. 10 DECORATIVE STAMPED CONCRETE FINISH. 11 DECORATIVE ROADWAY LUMINAIRE, SEE ILLUMINATION PLANS. 12 DECORATIVE SIGNAL POLE WITH MAST ARM AND LUMINAIRE, SEE SIGNALIZATION PLANS. 13 PEDESTRIAN PUSH BUTTON. SEE SIGNALIZATION PLANS. 14 CEMENT CONCRETE SIDEWALK, PER WSDOT STD PLAN F- 30.10-01. 15 CEMENT CONCRETE SIDEWALK. SEE PROPERTY RESTORATION PLANS SHEETS 195-207. 16 INSTALL JUNCTION BOX TYPE 1, SEE DETAILS, SHEETS 271 & 273. LAYOUT POINTS SCHEDULE ITEM : # : STATION OFFSET DESCRIPTION 1 SEE TABLE, SHEET 195 BEGIN CURVE FOR WALL_ A, PRC 2 SEE TABLE, SHEET 195 END CURVE FOR WALL A, PRC 3 10+90.64 83.11 RT LAYOUT PT FOR SCORING* 4 SEE TABLE, SHEET 195 BEGIN CURVE FOR WALL B, PRC 5 SEE TABLE, SHEET 195 END CURVE FOR WALL B, PRC 6 10+59.64 71.92 LT LAYOUT PT FOR SCORING* 7 SEE TABLE, SHEET 195 _ BEGIN CURVE FOR WALL C, PRC 8 SEE TABLE, SHEET 195 END CURVE FOR WALL C, PRC 9 11+15.88 78.88 RT _ RING CONCRETE FINISH, CENTER 10 10+72.28 67.99 LT RING CONCRETE FINISH, CENTER 11 SEE SHEET 81 LAYOUT POINT FOR EDGE OF SCORING 12 SEE SHEET 81 1 LAYOUT POINT FOR EDGE OF SCORING * SIDEWALK SCORING TO BE ALIGNED WITH BACK OF ADA RAMP. NOTE: ENGINEER TO FIELD LOCATE AND VERIFY DECORATIVE CONCRETE FINISH PRIOR TO INSTALLATION. TRASH RECEPTACLE SCHEDULE STATION OFFSET 10+57.72 89.04 LT 11+4.00 79.61 RT 0 5 10 20 30 SCALE IN FEET U �) QZ Q T a N3�Q Q J 11-14-11 Z M ~ Q QF SURVEYED: KPG DRAWN BY: PN DESIGN BY: KPG CHECK BY: PF PROJ MGR: JF FILE: 0655DURB01.dwg Kph 753 9th Avenue N 2502 Jefferson Avenue BID Seattle: WA 98109 Tacoma, WA 98402 (206)2861640 (253)6270720 DOCUMENTS www.kpg,COm - CITY OF RENTON Public Works Department APPROVED FOR CONSTRUCTION BY: '"SDATE:/ f fiA► 4 RAINIER AVENUE S (SR 167) S GRADY WAY TO S 2N D ST URBAN DESIGN DETAILS S GRADY WAY INTERSECTION DRAWING NO. 269 PROJECT NO. TED403430 FED AID NO.-CM0167(048) -- DATE: NOV 2011 SHEET NO. 269 OF 304 NUMBER REVISION DESCRIPTION BY APP. DATE