HomeMy WebLinkAboutTRO4103430.27FULL DEPTH
rV- i ¢ +el' ' JOINT
\fop
FULL DEPTH
EXPANSION JOINT (TYP) -
CEMENT
(sONCRt TE SIDEWALK
CD
o
U
Ln
Q0
z
0
z
w
� NL;NBER
-
o
�
0
I
a
A a
C1
6'-1 1 /4"
a
Q
<� a I
as
ELECTRICAL COgUIT
STUB -UP a
SEE DETAIL, THIS SHEET.
a a
a a a
a a
a
°
a
a
a
20'-O"
v _ Q.
a a.
a � n
. L_J 4
FUTURE SHELTER ;(- _ _ J
a MOUNT!IG PLATE TO BE
INSTALLED BY OTH' (TYP) a
a
a.
a
PLAN VIEW
a a a,
a a �
a
a
PLACEMENT REFERENCE POINT
SEE PLACEMENT SCHEDULE, THIS SHEET
c
a
a
xn
0
A Ln
I
N
ELECTRICAL CONDUIT I
i r
STUB -UP, SEE DETAIL, I
I >
I I
THIS SHEET I
I CD
#5 ® 12" MAX EACH WAY
I
I
I z
TOP AND BOTTOM.
I I
I
I
SPACE REBAR TO MISS
I I
FUTURE ANCHOR RODS
I
Tr4. I �'— -iir. �. n ® o
°
°
'd�� a •e"
—!- .'a -mi' �� '.�
a.
e°.
u
.. ° d .a .a
U a
° n e °..
'� -. °. d 4
°
.4.
° d
II ° _ d n a
Lle
L.r a' �. • �.
° e d
°
a
(L!E
LIJ
0
4" CSBC
U
SECTION A -A
RAPID RIDE BUS SHELTER FOUNDATION
N TS
FUTURE SHELTER LEG
TO BE INSTALLED BY OTHERS
�- 1" GRS COUPLING
RAPID RIDE
BUS SHELTER FOUNDATION
e .3" PVC .CAP',, a '
4°
° a. .
1" 0 THREADED GRS
TO ELECTRICAL HAND HOLE
SEE ILLUMINATION AND
INTERCONNECT PLANS
FOR SPECIFIC LOCATION
ELECTRICAL CONDUIT STUB -UP
N TS
5'-9" (X 5'-9„)
ELEVATION VIEW
FUTURE SIGN TO BE
INSTALLED BY OTHERS
RAPID RIDE BUS SHELTER FOUNDATION NOTES:
1. MATCH TO EXISTING SIDEWALK SLOPE TO
ASSURE PROPER DRAINAGE OF SURFACE
WATER; 2% MAX CROSS SLOPE.
2. PROVIDE TEN (10) DAYS PRIOR NOTICE
FOR ANY CONSTRUCTION IMPACTS TO
BUS STOPS OR BUS SERVICE. CONTACT
RICHARD GARCIA, KING COUNTY METRO'S
CONSTRUCTION COORDINATOR AT (206)
684-2732,
3. CONTACT METRO INSPECTOR PAUL MILLER
AT (206) 684-2224, 48 HOURS BEFORE
FORMING AND POURING CONCRETE FOR
THE BUS SHELTER FOUNDATION.
4. ANY CONSTRUCTION OR INSTALLATION
ACTIVITIES AFFECTING TRANSIT
OPERATIONS OR FACILITIES MUST BE
COORDINATED THROUGH METRO TRANSIT
CONSTRUCTION INFORMATION CENTER.
FOR NOTIFICATION INFORMATION AND
GUIDELINES, PLEASE VISIT:
HTTP: //WWW.KING000NTY.GOV/TRANSPORTATION/
KCDOT/METROTRANSIT/CONSTRUCTION. ASPX.
RAPID RIDE BUS SHELTER FOUNDATION
PLACEMENT SCHEDULE
STATION
OFFSET
?_
11+89.19
60.50' RT
2
20+07,05
60.50' LT
3
25+74.69
60.40' RT
4
36+16.88
54.50' RT
5
38+78.84
54.50' LT
SECTION C-C
METRO SIGN FOUNDATION
N TS
#4 @ 12" O.C.
FUTURE 6" HIGH STEM WALL
TO BE INSTALLED BY OTHERS
B
JF
CD
as
N
7"
3-9 1 /2"
S-0„
B
_]�O
O
STATION I OFFSE'1 11+61.29 60.50' RT
2 20+29.55 60.50' LT
3_25+58.91 I 60.50' RT_05 ! 39+05.53 54,5
A',
O O
a ELECTRICAL CONDUIT STUB -UP
a SEE DETAIL, THIS SHEET
NCONDUIT
9 1/2"
...
° ° a
2,— 6"
5'--0"
FUTURE 6" HIGH STEM WALL
TO BE INSTALLED BY OTHERS
FLUSH WITH
ADJACENT
FLAT SURFACE
T
FULL DEPTH
EXPANSION JOINT (TYP)
NENERAL NOTE NUMBER.
EE GENERAL NOTES.
METRO SIGN FOUNDATION
PLACEMENT SCHEDULE
#
A',
O O
a ELECTRICAL CONDUIT STUB -UP
a SEE DETAIL, THIS SHEET
NCONDUIT
9 1/2"
...
° ° a
2,— 6"
5'--0"
FUTURE 6" HIGH STEM WALL
TO BE INSTALLED BY OTHERS
FLUSH WITH
ADJACENT
FLAT SURFACE
T
FULL DEPTH
EXPANSION JOINT (TYP)
NENERAL NOTE NUMBER.
EE GENERAL NOTES.
METRO SIGN FOUNDATION
PLACEMENT SCHEDULE
#
STATION
OFFSET
1
12+09.19
1 52.88' RT
2
1 19+81.17
52.88' LT
3
25+93.11
52.78' RT
4
36+31.38
_
46.88' RT
5
38+58.34
46.88' L I
PLAN VIEW
PLACEMENT REFERENCE POINT
SEE PLACEMENT SCHEDULE,
THIS SHEET
ELECTRICAL CONDUIT STUB -UP
(EE DETAIL, THIS SHEET
a
C 4
d
#5 ® 12" MAX
4" CSBC EACH WAY 1 2
BOTH TOP
AND BOTTOM 1" 00 GRS
(PLUGGED UNTIL
SECTION B-B PYLON READY
FOR INSTALLATION)
METRO TECH PYLON FOUNDATION
N TS
METRO TECH PYLON GENERAL NOTES
1. ALL NEW CONDUIT INSTALLED UNDERGROUND SHALL HAVE A MINIMUM
COVER OF 24 INCHES.
2, PLACE 6 INCH WIDE MAGNATEK WARDING TAPE, OR APPROVED EQUAL,
12 INCHES BELOW GRADE OVER ALL C30NDUIT RUNS,
3. STUB UP THE CONDUIT AS INDICATED WITH A COUPLING INSTALLED ON
THE STUBBED UP END WITH THE TOP OF THE COUPLING FLUSH WITH
FINISHED SURFACE. A T HREADED MALE PLUG SHALL BE INSTALLED IN
THE TOP OF THE COUPLING AT THE TIh F �O� �HE O�.J'�D.�T'Oh1'�;Tlr_
WALL PLACEM� IT. WRAi� P° ;�� �"")(; �' IN(" ����,D TCP n :N :, ,E.
CONDUIT WITH DUCT TAPE PRIOR TO POURING CONCREI E.
4. EPDXY ALL JOINTS TO ENSURE WATER CANNOT ENTER THE CONDUIT
THROUGH THE CONNECTION. DO NO-_ EPDXY THE PLUG.
T 343027
11-14-11
ti�� G�IA�O��
_ �Go
�E20320w�
� crsTE� � �
�rsIpNAL E�
SURVEYED: KPG
DRAWN BY: JMDp�
DESIGN BY: KPG
CHECK BY: JLF
PROJ MGR: JF
FILE: 0655DDET01.dwg
753 9th Avenue N 2502 Jefferson Avenue BID
Seaftle; WA 98109 Tacoma, WA 98402 DOCUMENTS
,
206 2861640 253 627 0 20
www.kpg,com
Ad CITY OF RENTON
Public Works Department
APPROVED FOR CONSTRUCTION
BY: DATE:
RAINIER AVENUE S (S R 167)
S G RAD`Y WAY TO S 2N D ST
DETAILS
DRAWING NO. 27
-
PROJECT NO. TED403430
FF-D AID NO.-Ck4rj1 6 s ;,ri/_b;
DA i E: 2011
—NOV
SHEET NO. 27 OF 304
----
REVISION DESCRIPTION
` u '
APP.
DATE