Loading...
HomeMy WebLinkAboutTRO4103430.36 (2)NOTE: FOR CURB LOCATIONS AT LITHIA DODGE CHRYSLER, SEE POINT LAYOUT TABLE, THIS SHEET. STA 264-10.35, 78.65' LT LITHIA DODGE CHRYSLER BROWN BEAR., BEGIN CEM. CONC. TRAFFIC CURB o CAR WASH 8 *15' 16 *16.- 9 :14* 4. 5 8. *10* "1 17*- .2 2.- 8 :..7 o. 11 *. *.12.*- 16 D11 16 8 16 00 cr) 00 16 8 6 10 D11A ti Q:) 4f) WALL 2 z,V- 014 25 tij 458.5' R U7 0) STA 26+23.20, 64.18' LT END CEM. CONC. TRAFFIC CURB BEGIN INTEGRAL CURB 26 SEE ALIGNMENT PLANS, SHEET 85 4' R, STA 28+74, 62.10' RT RAINIER AVE S 27 PT, STA 28+72.98, 64.97'RT T, STA 28+45.59, 70,76' RT L STA 28+42.40, 62.51' RT PC, 20' R, STA 28+41.17, 60.76' RT Pr A, P NOTE: BOB BRIDGE SCION PROPERTY RESTORATION AND DRIVEWAY CONNECTION TO BE COMPLETED BY PROPERTY OWNER AT BOB BRIDGE SCION PARCEL. n r--j CN CD CN CONSTRUCTION NOTES 01 MATCH EXI!STING. CONSTRUCT CEMENT CONCRETE EXTRUDED CURB, TYPE 6 PER WSDOT STD PLAN F-10.42-00. ED @) RECONSTRUCT HMA DRIVEWAY. SEE DRIVEWAY SCHEDULE, SHEET 216, AND DETAIL, SHEET 24. Cn Ld RECONSTRUCT CONCRETE DRIVEWAY. SEE DRIVEWAY SCHEDULE, SHEET 216, AND DETAIL, SHEET 24. Ln Ln Q0 CD ' @) RECONSTRUCT HMA PARKING LOT. SEE PARKING AND DRIVEWAY PAVEMENT DETAIL AND HMA WEDGE DETAIL, SHEET 24. 0 @) CONSTRUCT CEMENT CONCRETE SIDEWALK PER WSDOT STANDARD PLAN F-30.10-01 TO MATCH EXISTING CONCRETE WALKWAY. CONSTRUCT CEMENT CONCRETE TRAFFIC CURB PER WSDOT STD PLAN F-10.12-02. Li C") I 1 ADDENDUM NO 2: PARCEL NO 37 FRONTAGE REVISIONS. DDL JLF 12 15 Cn ' INUMBER I REVISION DESCRIPTION I BY I APP. I DATE 5 5 5 6 1 STA 26 7.40, 78. T' PC, 4' R STA U­�Zci-6-3, STA 26+23.64, 6 77 . 06' RT 85.33' RT ST +24.42, 75.89' RT IHOP POINT LAYOUT TABLE BOW 10 BACK OF SIDEWALK 10 SEE SHEET 198 FOR BOW 10 POINTS. G 1A C, WAS 0 5 10 20 40 60 SCALE IN FEET 11-14-11 SURVEYED: KPG DRAWN BY: STA 27+88.07, 62.42' RT PT I \1' STA 27+85.44, 66,1�' RT POINT LAYOUT TABLE LITHIA DODGE CHRYSLER 7 5 CURB AT LITHIA DODGE CHRYSLER CURB AT LITHIA DODGE CHRYSLER STATION OFFSET DESCRIPTION RADIUS STATION OFFSET DESCRIPTION RADIUS 26+23.20 64.18' LT 17 28+02.44 67.66' LT PT -1 2 26+20.39 67.64' LT 18 28+39.78 63.250 L 3 26+38.91 78.74' LT PC 5.00' 19 28+39.98 75.72' LT PC 4.50' 4 26+48.07 74.74' LT PT 20 28+45.36 80.13' LT PT 5 26+48.28 67.87' LT PC 458.50' 21 28+73.87 79.72' LT PC 4.50' 6 26+91.61 68.05' LT 22 28+79.06 75.29' LT PT 7 26+91.59 75.06' LT PC 3.00' 23 28+79.11 71.17' LT PC 4.94 no'j 8 26+95.11 78,06' LT PT 9 27+27.54 78.06' LT PC 3.00, 10 27+31.06 75.06' LT PT 11 27+31.03 68.05' LT 12 27+65.32 1 67.92' LT 13 27+65.37 76.43' LT PC 3.00' 14 27+68.94 79.40' LT PT 15 27+99.62 79.18' LT PC 3.00' 116 1 28+03.12 1 76.16' LT PT Lir-01UN BY. %JLr- 753 9th Avenue N 2502 Jefferson Avenue CHECK BY: NM Seattle, WA 98109 Tacoma, WA 98402 (206) 286-1640 (253) 627-0720 PROJ MGR: JF www.kpg.com FILE: 0655dREST01.dwg 491: B DOCUMENTS APPROVE BY: VZ' I CITY OF RENTON Public Works Department FOR CONSTRUCTION DATE.444 GENERAL CONSTRUCTION NOTES 1 CONTRACTOR SHALL MAINTAIN CONTINUOUS ACCESS TO ALL PARCELS. <_' TC 2. ADJUST ALL SURFACE UTILITIE....' � ) FINAL GRADE, 3. CONTRACTOR SHALL NOTIFY BUSINESS OWNERS AT LEAST THREE DAYS PRIOR TO PERFORMING WORK WITHIN THE TEMPORARY CONSTRUCTION EASEMENT. 4. CONTRACTOR SHALL COORDINATE WITH BUSINESS OWNER AND SCHEDULE WORK WITHIN THE TEMPORARY CONSTRUCTION EASEMENT AROUND SPECIAL BUSINESS HOURS. 5. FOR REMOVAL LIMITS, CONSTRUCTION LIMITS, AND TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES, SEE SITE PREPARATION & TESC PLANS, SHEETS 69-79. 6. FOR CONSTRUCTION PHASING, SEE CONSTRUCTION PHASING PLANS, SHEETS 7-54. 7. THESE SHEETS CONTAIN BACK OF SIDEWALK LAYOUT POINTS AND WORK TO BE COMPLETED BEHIND THE SIDEWALK. FOR TREATMENT OF ROADWAY FEATURES SEE ALIGNMENT PLANS, SHEETS 81-91. 8. FOR WATER SERVICE CONNECTIONS, SEE WATER PLANS, SHEETS 132-141. 9. FOR STORM DRAINAGE CONNECTIONS AND ADJUSTMENTS, SEE STORM DRAINAGE PLANS. 10. FOR TREATMENT OF DRIVEWAYS, SEE DRIVEWAY PLANS AND PROFILES, SHEETS 208-216. 11. FOR FRANCHISE UTILITY CONNECTIONS, SEE JOINT UTILITY TRENCH PLANS, SHEETS 164-173. TIO�j �)F 0-1 12. FOR DECORATIVE SIDEWALK PAVEMENT TREAIMENI' AND FOR IOCA R i ' 3 L U I "I URBAN DESIGN FEATURES, SEE URBAN DESIGN DETAILS, SHEETS 269-281. 13. FOR ALL LOCATIONS WHERE THE BACK OF SIDEWALK IS NOT DEFINED IN THE POINT LAYOUT TABLES, THE TOP BACK OF SIDEWALK SHALL BE CONSTRUCTED AS DEFINED BY THE ALIGNMENT PROFILES (SHEETS 93-103), TYPICAL SECTIONS (SHEETS 19-23), INTERSECTION CURVE DATA TABLES (SHEETS 81-92), AND PLAN DIMENSIONS SHOWN. 14. CONTRACTOR SHALL ENSURE FINAL GRADE OF COMMERCIAL HMA MAINTAINS POSITIVE DRAINAGE TO DOWNSTREAM DRAINAGE STRUCTURES, PROPERTY RESTORATION LEGEND COMMERCIAL HMA PAVEMENT AREA CEMENT CONCRETE SIDEWALK AND/OR PAVEMENT PROPERTY LINES SAWCUT LINES RIGHT OF WAY 1LJNES EASEMENT LINES - - - - - - - - APPROXIMATE CONSTRUCTION LIMITS CORRESPONDING SHEETS RIGHT OF WAY PLANS 11 EXISTING CONDITIONS 59 SITE PREPARATION & TESC PLAN 73 ALIGNMENT PLAN 85 ALIGNMENT PROFILE 97 DRAINAGE PLANS 108 DRAINAGE PROFILE 117-119 WATER PLAN 136 WATER PROFILE 150 JOINT UTILITY TRENCH PLAN 168 JOINT UTILITY TRENCH PROFILES 184 PROPERTY RESTORATION PLANS - CHANNELIZATION & SIGNING PLAN 221 ILLUMINATION PLANS 232 IRRIGATION PLAN 286 LANDSCAPE PLAN 298 RAINIER AVENUE S (SR 167) S GRADY WAY TO S 2ND ST PROPERTY RESTORATION PLANS STA 24+50 TO STA 29+00 DRAWING NO. _1 99 PROJECT NO. TED403430 FED AID NC). -0,',AQ'1_67' D A'.'- E: -NOV 201 SHEET NO. 199 OF 304