Loading...
HomeMy WebLinkAboutTRO4103430.38 (2)TKOIOF%"i1:1liy1[$I0Oki [*]II ►.'i I o T ® NOTE: [ FOR VETERINI FRONTAGE IMLP 0 d- d- CJ 0 CN d- C11l F-� cr; w �r C> 0 s o, 0 / z w a / 0 Q 0 .a I 0 Ln Ln Qo 0 / z 0 I- z w cn C� w O (Y_ e•� POINT LAYOUT TABLE CURB 3 CURB AT D21 & D23 4 :• STATION OFFSET DESCRIPTION RADIUS 1 36+66.63 61.91' LT PC 2.00' 2 1 36+68.67 60.00' LT PT 3 36+81.53 60.00' LT PC 2.00' 4 36+83.57 58.00' LT PT 5 37+10.07 59.50' LT PC 2.00' 6 37+12.11 61.50' LT PT 7 37+46.03 61.50' LT PC 2.00' 8 37+48.07 1 59.50' LT I PT I A 4%1r I\i T! Ir AA\® MA ICH EXISTING. �5 CONSTRUCT CEMENT CONCRETE EXTRUDED CURB, TYPE 6 PER WSDOT STD PLAN F-10.42-00. �6 RECONSTRUCT HMA DRIVEWAY. SEE DRIVEWAY SCHEDULE, SHEET 216, AND DETAIL, SHEET 24. U7 RECONSTRUCT CEMENT CONCRETE DRIVEWAY. SEE DRIVEWAY SCHEDULE, SHEET 216, AND DETAIL, SHEET 24. RECONSTRUCT HMA PARKING LOT. SEE PARKING AND DRIVEWAY PAVEMENT DETAIL AND HMA WEDGE DETAIL, SHEET 24. O9 CONSTRUCT CEMENT CONCRETE SIDEWALK PER WSDOT STANDARD PLAN F-30.10-01 TO MATCH EXISTING CONCRETE WALKWAY. 12 ADJUST MONITORING WELL TO FINAL GRADE. 16 CONSTRUCT CEMENT CONCRETE TRAFFIC CURB PER WSDOT STD PLAN F-10.12---02. 18 CONSTRUCT CEMENT CONCRETE SIDEWALK PER VETERINARY CLINIC PROPERTY RESTORATION DETAIL, SHEET 206. 20 PAVE AGAINST ROCKERY. 21 CONSTRUCT ASPHALT RAMP AT DOORWAY PER DETAIL, SHEET 207. GENERAL CONSTRUCTION NOTES 1. CONTRACTOR SHALL MAINTAIN CONTINUOUS ACCESS TO ALL PARCELS. ADJUST ALL SURFACE UTILITIES TO FINAL GRADE. CONTRACTOR SHALL NOTIFY BUSINI'mSS OWNERS AT LEAST THREE DAYS PRIOR P") PERFORMING WORK WITHIN THE TEMPORARY CONSTRUCTION EASEMENT, CONTRACTOR SHALL COORDINATE WITH BUSINESS OWNER AND SCHEDULE WORK WITHIN THE TEMPORARY CONSTRUCTION EASEMENT AROUND SPECIAL BUSINESS HOURS. 5. FOR REMOVAL LIMITS, CONSTRUCTION LIMITS; ANDTEMPORARY EROSION AND SEDIMENT CONTROL MEASURES, SEE SITE PREPARATION & TESC PLANS, SHEETS 69-79. 6. FOR CONSTRUCTION PHASING, SEE CONSTRUCTION PHASING PLANS, SHEETS 37- 54. 7. THESE SHEETS CONTAIN BACK OF SIDEWALK LAYOUT POINTS AND WORK 'TO BE COMPLETED BEHIND THE SIDEWALK. FOR TREATMENT OF ROADWAY FEATURES SEE ALIGNMENT PLANS, SHEETS 81-91. 8. FOR WATER SERVICE CONNECTIONS, SEE WATER PLANS, SHEETS 132-141. 9. FOR STORM DRAINAGE CONNECTIONS AND ADJUSTMENTS, SEE STORM DRAINAGE PLANS. 10. FOR TREATMENT OF DRIVEWAYS, SEE DRIVEWAY PLANS AND PROFILES SHEETS 208--216. 11. FOR FRANCHISE UTILITY CONNECTIONS, SEE JOINT UTILITY TRENCH PLANS, SHEETS 164-173. 12. FOR DECORATIVE SIDEWALK PAVEMENT TREATMENTS AND FOR LOCATION OF OTHER URBAN DESIGN FEATURES, SEE URBAN DESIGN DETAILS, SHEETS 269-281. a 13. FOR ALL LOCATIONS WHERE THE BACK OF SIDEWALK IS NOT DEFINED IN THE POINT LAYOUT TABLES, THE TOP BACK OF" SIDEWALK SHALL BE CONSTRUCTED AS DEFINED BY THE ALIGNMENT PROFILES (SHEETS 93-103), TYPICAL SECTIONS (SHEETS 19-23), INTERSECTION CURVE DATA TABLES (SHEETS 81-92), AND PLAN DIMENSIONS SHOWN. 14. CONTRACTOR SHALL ENSURE FINAL GRADE OF COMIMERCIAL HMA MAINTAINS POSITIVE DRAINAGE TO DOWNSTREAM DRAINAGE STRUCTURES, PROPERTY RFSTC)R®TInN I i=ru=mn COMMERCIAL HMA PAVEMENT AREA CEMENT CONCRETE SIDEWALK AND/OR PAVEMENT PROPERTY LINES SAWCUT LINES RIGHT OF WAY LINES l F FeC17AAGTIT I IAICC T=IAIA i CATEGORY SHEET _ RIGHT OF WAY PLANS EXISTING CONDITIONS 13 SITE PREPARATION & TESC PLAN 75 ALIGNMENT PLAN _ 87 ALIGNMENT PROFILE 99 DRAINAGE PLANS 110 _ x DRAINAGE PROFILE 120,121� WATER PLAN 138 WATER PROFILE 152 JOINT UTILITY TRENCH PLAN 170 JOINT UTILITY TRENCH PROFILES __ 186 PROPERTY RESTORATION PLANS - CHANNELIZATION & SIGNING PLAN 223 ILLUMINATION PLANS 234 IRRIGATION PLAN 288 LANDSCAPE PLAN 300