Loading...
HomeMy WebLinkAboutTRO4103430.46CD CN z 0 c Q0 i C) C 0 U a 0 / z c� W 0 / a .a I u7 0 z 0 z w U w O a_ Z 1 \ \`� — — - - - - - YANKEE GRILL-'" I .. RIGHT TURN LANE SOUTHBOUND LANE SOUTHBOUND LANE SOUTHBOUND LANE LEFT TURN LANE MEDIAN NORTHBOUND LANE NORTHBOUND NORTHBOUND LANE LANE 2' BUFI 11' 1' BUFFER SECTION A -A 3UFFER I� LANE + SOU ANOUND LA '� � WORK ZONE NORLANOUND NORTHBOUND — 2' ��_ TRAFFISAFETY DRUMS WITH LIGHT SECTION B-B TRAFFIC SAFETY DRUMS WITH LIGHT USA MINI -MART el 7 C� RAINIER AVE S 18 -- f4+oo HARDIE AVE _ � ,. t `&00 3 I 1 1.8 01 AM 0 20 40 80 120 SCALE IN FEET GENERAL CONSTRUCTION CHANNELIZATION NOTES FOR GENERAL CONSTRUCTION CHANNELIZATION NOTES, SEE SHEET 37. CONSTRUCTION CHANNELIZATION LEGEND TRAFFIC SAFETY DRUMS WITH LIGHT MAXIMUM EXTENTS OF WORK ZONE BUSINESS OPEN DURING CONSTRUCTION SIGN, SEE DETAIL SHEET 38. CONSTRUCTION LIMITS DIRECTION OF TRAVEL TEMPORARY CHANNELIZATION NOTES WORKZONE BARRIER, SEE CONSTRUCTION STAGING LEGEND, THIS SHEET O2 PAINTED DOUBLE YELLOW CENTER LINE O3 PAINTED LANE LINE ® PAINTED EDGE LINE O PAINTED WIDE LINE © PAINTED MEDIAN LINE 7O PAINTED TYPE 2L ARROW ® PAINTED TWO-WAY LEFT TURN LINE 10 PAINTED DOTTED EXTENSION LINE. 11 PAINTED STOP LINE. 012 PANTED TYPE 2R ARROW 13 EXISTING CROSSWALK STRIPING TO REMAIN 14 MAINTAIN ADA COMPLIANT PEDESTRIAN ACCESS 55 FOR SIGNAL INSTALLATION, MODIFY RIGHT TURN LANE CONSTRUCTION CHANNELIZATION AND PROVIDE TRAFFIC SAFETY DRUMS WITH LIGHT TO ACCOMMODATE SIGNAL CONSTRUCTION AND AS NECESSARY TO PROTECT NEW SIGNAL EQUIPMENT ONCE CONSTRUCTED. 16 REMOVE EXISTING CROSSWALK CR CHANNELIZATION 17 PAINTED TYPE 1 ARROW TEMPORARY CROSSWALK STRIPINT=343046 1 g PAINTED TYPE 3R ARROW 11-14-11 SURVEYED: KPG �GTACO�`109 t �-- CITY OF RENTON RAINIER . AVENUE S (SR 167) DRAWING NO. 46 DRAWN BY: JLF/KAT _ �" �' BID S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 DESIGN BY: JLF 753 9th Avenue N 2502 Jefferson Avenue Public Works Department FED AID NO.-CM0167(048) CHECK BY: JG Seattle, WA 98109 Tacoma, WA 98402 zo3zo w� DOCUMENTS APPROVED FOR CONSTRUCTION CONSTRUCTION CHANNELIZATION PLANS -STAGE 3 MEDIAN DATE: _Nov2o,1 �F Fo (206) 286-1640 (253) 627-0720 ,off crsTc� � PROJ MGR: JF A SSI�NAL �1yG w NUMBER REVISION DESCRIPTION BY APP. DATE FILE: 0655DCONST03.dwg ww,kpg.com BY: DATE: STA 8+98 TO STA 18+00 SHEET NO. 46 OF 304