Loading...
HomeMy WebLinkAboutTRO4103430.8 (2)GENERAL JOINT UTILITY TRENCH PLAN NOTES CD N d- N \ n, 0 Ln 0 i z 0 z w ry cn U w D 0 CL -. CD r w w CD CD 00 .Q I-- w z U L%11011I 961■ ID VAULT FRANCHISE UTILITY ID OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN/FROM LEFT CONDUIT OUT/TO RIGHT P18 3-PHASE TRANSFORMER V17 PSE PSE CONTRACTOR 1-4" - Q2 I CONNECT TO EX. SERVICE WIRE BOX - CENTURYLINK CENTURYLINK CONTRACTOR - 26q jP19 j ONE PHASE TRANSFORMER V20 PSE PSE CONTRACTOR 1-2" - -- 4 C18 -------- 2436 MEDIUM DUTY VAULT - COMCAST COMCAST CONTRACTOR 30c,31c 32c,33c P7 REMOVE I V18 PSE CONTRACTOR - - P74 REMOVE VAULT V19 PSE - CONTRACTOR - - Q30 REMOVE VAULT - CENTURYLINK - CONTRACTOR - - Q31 REMOVE VAULT - CENTURYLINK - CONTRACTOR - - I P85 THREE PHASE J-BOX - PSE PSE CONTRACTOR 34p,35p 44p,45p SURVEYED: KPG ti4� GIA 00& SOS WAS 9DRAWN BY: SOD �o DESIGN BY: SOD �2U20 CHECK BY: JLF � w� GrsTERti� ��� PROJ MGR: JF ���G NUMBER REVISION DESCRIPTION BY APP. DATE IDNAL FILE: 0655DJUT01.dwg ]PIllEw"k 753 9th Avenue N 2502 Jefferson Avenue Seattle, WA 98109 Tacoma, WA 98402 (206) 286-1640 (253) 627-0720 www.kpg,com 1 CONSTRUCTION NOTES 1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF' THE DESIGNS BY PSE, COMCAST, CENTURYLINK, :AND CITY OF RENTON. SEE FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE GAS, COMCAST, AND CENTURYLINK. 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTAI_I_ED BY TH�� CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFIP%CA TIONS OF THE FRANCHISE UTILITIES. 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS CONVERSION. 4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR N THE CITY OF RENTON. `- 5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED w FOR THEIR CONVERSION. w 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE o MADE BY THE FRANCHISE UTILITIES. CD N 7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE d PROPERTY OWNER FROM THE RIGHT-OF-WAY TO EXISTING PRIVATE METERS. 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS cn AND PROFILE SHEETS 174-192. ADJUST THE HORIZONTAL ALIGNMENT AND w z VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER F- UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE Z3 4" DIAMETER CONDUIT-CENTURYLINK (2 CONDUIT) Z8 3" DIAMETER CONDUIT-COMCAST (2 CONDUIT) A4" DIAMETER CONDUIT-PSE POWER (2 CONDUIT) A6" DIAMETER CONDUIT-PSE GAS (1 CONDUIT) JOINT UTILITY TRENCH LEGEND FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. -- CITY OF RENTON BID � C Public Works Department DOCUMENTS APPR V D FOR CONSTRUCTION BY: / DATEJ 4,,,��Q "A . UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO AID IN THE LAYOUT OF THE TRENCH, SHEETS 180-192, 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT DANK AND EXISTING UTILITY STRUCTURES NO LONGER IN USE. 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE. POSSIBLE. SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER DESIGN. 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. PLAN 0 5 10 20 40 60 SCALE IN FEET CALL 2 DAYS BEFORE YOU DIG 1-800-424-5555 T=34301 I I CORRESPONDING SHEETS CATEGORY SHEET EXISTING CONDITIONS 14 RIGHT OF WAY PLANS -_ SITE PREPARATION & TESC PI _62 76 ALIGNMENT PLAN -- 88 ALIGNMENT PROFILE 100 DRAINAGE PLANS 111 DRAINAGE PROFILE WATER PLAN --- 12� 2 139 WATER PROFILE 153 JOINT UTILITY TRENCH PLAN - JOINT UTILITY TRENCH PROFILES 187 PROPERTY RESTORATION PLANS 202 CHANNELIZATION & SIGNING PLAN 224 ILLUMINATION PLANS 235 IRRIGATION PLAN 289 LANDSCAPE PLAN 301 RAINIER AVENUE S (SR 167) S GRADY WAY TO S 2ND ST JOINT UTILITY TRENCH PLAN STA 38+00 TO STA 42+00 DRAWING NO. 171 PROJECT NO. TED403430 FED AID NO.-CM0167(048) DATE: NOV 2011 SHEET NO. 171 OF 304_