Loading...
HomeMy WebLinkAboutTRO4103430.9 (2)GENERAL JOINT UTILITY TRENCH PLAN NOTES G:a �J CD 0 0 Ln Ln 0 0 Lr'' z 0 z L� ch� i U Ld 0 01 a_ Od- w w C'n 76 GAS STATION ID P20 VAULT ; THREE PHASE J.--BOX � FRANCHISE UTILITY ID J22 OWNED BY I PSE PROVIDED BY PSE INSTALLED BY CONTRACTOR CONDUIT IN/FROM LEFT 44p,45p CONDUIT OUT/TO RIGHT 36p,37p,38p,39p,1-4" Q12 1 264 TA #924 CENTURYLINK CENTURYLINK CONTRACTOR 24q,25q,26q 27q,28q,29q,30q C19 2436 MEDIUM DUTY VAULT — COMCAST COMCAST CONTRACTOR 32c,33c 34c,35c,36c,37c,38c P21 3 PHASE TRANSFORMER V21 PSE PSE CONTRACTOR 36p,37p — Q22 C-330 PEDESTAL — CENTURYLINK CENTURYLINK CONTRACTOR 27q — C20 17%30" — COMCAST COMCAST CONTRACTOR 36c — Q23 CONNECT TO EX. SERVICE WIRE BOX — CENTURYLINK — CONTRACTOR 28q — C21 17" x30" — COMCAST COMCAST CONTRACTOR — 39c C22 253 TA — COMCAST COMCAST CONTRACTOR 37c,38c,39c 40c,41 c C23 17%30" — COMCAST COMCAST CONTRACTOR 34c,35c — P40 INTERCEPT POINT IP09 PSE — CONTRACTOR 1-4" — P75 REMOVE VAULT V22 PSE — CONTRACTOR — — P76 REMOVE VAULT V20A PSE — CONTRACTOR — — Q32 REMOVE VAULT — CENTURYLINK — CONTRACTOR — — 03 REMOVE VAULT — CENTURYLINK — CONTRACTOR — — 2. 0 5 10 20 40 60 SCALE IN FEET CONSTRUCTION NOTES A3" DIAMETER CONDUIT—COMCAST (7 CONDUIT) JOINT UTILITY TRENCH LEGEND FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. WALL FOOTING SEE WALL PLANS, PROFILES & DETAILS, SHTS 28-35. 3" COMCAST CONDUIT BORE SPACER STEEL BULKHEAD (TYP. BOTH ENDS OF CASING) BORE SPACER (TYP) STEEL CASING WITH 0.25" WALL THICKNESS SECTION A —A NITS NOTES: 1. EXTEND STEEL CASING 4.5' FROM FRONT FACE AND BACK FACE OF WALL OR WALL FOOTING, WHICHEVER IS GREATER. STEEL CASING FOR JOINT UTILITY TRENCH DETAIL NTS 3. .19 a 7. 91 m EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND ALIGNMENT TO THE LIMITS S s0'WN. CONTRACTOF� SHALL PRa:F `1DE Ati.. 'us'=:SvR'p COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDINo. BACKFILL AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE GAS, COMCAST, AND CENTURYLINK. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE FRANCHISE UTILITIES. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS CONVERSION. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR THE CITY OF RENTON. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR CONVERSION. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE MADE BY THE FRANCHISE UTILITIES. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE PROPERTY OWNER FROM THE RIGHT-OF-WAY TO EXISTING PRIVATE METERS. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS AND PROFILE SHEETS 174-192. ADJUST THE HORIZONTAL ALIGNMENT AND VERTICAL PROFILE AS NECESSAR �" A"'v '1D C�.NwI I� T'` ��`iTI~ Fd ICTINI G AND, 1 .5 ,P. s �i� Lii s v .� PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAIN T AINING MINIMIJiM COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE TRENCH '`;EPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO AID IN THE LAYOUT OF THE TRENCH, SHEETS 180-192. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL. EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY STRUCTURES NO LONGER IN USE. INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER DESIGN. 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. 12" DIP, STEEL CASING 2 — 3" COMCAST CONDUIT SEE JOINT UTILITY TRENCH PLANS SHEET 169 T 3430112 RIGHT OF WAY PLANS T—,-5 EXISTING CONDITIONS 63 SITE PREPARATION & TESC PLAN 77 ALIGNMENT PLAN 89 ALIGNMENT PROFILE 101 DRAINAGE PLANS 112 DRAINAGE PROFILE 123 WATER PLAN 140 WATER PROFILE j 154 JOINT UTILITY TRENCH PLAN — JOINT UTILITY TRENCH PROFILES 188 PROPERTY RESTORATION PLANS 203 CHANNELIZATION & SIGNING PLAN 225 ILLUMINATION PLANS 236 IRRIGATION PLAN 290 LANDSCAPE_ PLAN 302 1 11-14-11 osti4� GWAk°�y ti 20 20�o �w � NAL SURVEYED: KPG DRAWN BY: SOD DESIGN BY: SOD CHECK BY: JLF PROJ MGR: JF FILE: 0655DJUT01.dwg K�� BID 753 9th Avenue N 2502 Jefferson Avenue Seattle, WA98109 Tacoma, WA98402 DOCUMENTS (206) 286.1640 (253) 627-0720 www.kpg,com f' RAINIER AVENUE S (S R 1 67) 41,104 �- CITY OF RENTON •� S G RADY WAY TO S 2N D ST Public Works Department JOINT UTILITY TRENCH PLAN APPROV D FOR CONSTRUCTION BY: DATE: i 2G1-� STA 42+00 TO STA 45+00 DRAWING NO. i — PROJECT NO. TED403430 FF.l AID) NO -C 10,016_; =048 DATE: NOV 2011 SHEET NO. 172 OF 304 NUMBER REVISION DESCRIPTION BY APP. DATE