CONTRACTOR ACCESS
AND STAG NG AREAS
CLEARING UMITS0
GRAVEL ..
}SIRFACING
X j ASPHALT
S, C
LAT D PAVEMEI'
4.,.
T
15E 46 ;P
15' PE EASEMEN i -'
r ` • h pCC 58 Mpp Y
xk ! SET Ad NAIL �.
` -PID NO 76168r1042-- WA175
6"GEC
4 '
47 �` SLDPE f_ S EN �_
5E45357 2 1 1s4`'
-° IE OF DAMACEn k Rcll
ON ul _15
r '
aCON_
�+ uY C WAIT+ DRIAWAY
. a
Li 144usaI i° G?
TEMPORARY w .�� s ('uITLK x� r.� +[�v �, I < 'rueg:a - d
CONSTRUCTION c f- 142%jAP(E;3"a77 4
n — BRASS � (ROC
EASEMENT TYP) , '
E I_w5---�. AP(Crr � 4
� R
ELEvm t 74 3?
0)N--o 4)
2
5
culls Gur,'Tr
3-
T
Lq , fir.. HN L IF NF:
u
17 END Ex? �
pf p+pE �
R ra -Wt
J N r 3
\01PE EASEMEN �- y. � 4
1 D CLEARING b M!7S
_ S
,.. .
b
TEMPORARY
CONSTRUCTION
EASEMENT
A
t
PLAN
SCALE: 1" 2,r;'
O 100% SUBMITA
NO. REVISION
CONSTRUCTION NOTES:
TESL NOTES:
1
CONTRACTOR TO INSTALL TEMPORARY CREEK BYPASS SYSTEM. BYPASS
1
' 4 IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT,
SYSTEM SHOWN ON THIS DRAWING IS SCHEMATIC AND CONTRACTOR SHALL
AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR UNTL ALL
SUBMIT BYPASS PLAN IN ACCORDANCE WITH THE SPECIFICATIONS FOR
CONSTRUCTION IS APPROVED.
APPROVAL BY THE CITY. LOCATE PIPE AND COFFER DAMS TO ALLOW FOR
CONSTRUCTION OF OTHER MPROVEMENTS INCLUDING HEADWALL, BOULDER
2
THE BOUNDARIES OF THE CONSTRUCTION LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY
CASCADE AND CULVERT BAFFLES. UPON COMPLETION OF PROJECT, ALL
FLAGGED BY THE CONTRACTOR USING YELLOW CONSTRUCTION TAPE WITH 2"X4" WOODEN STAKES
MATERIAL USED FOR THE TEMPORARY BYPASS SHALL BE REMOVED FROM
SPACED AT 20' MAXIMUM PRIOR TO CONSTRUCTION. ELECTRONIC FILES WILL BE PROVIDED TO THE
THE SITE AND THE SITE RESTORED TO PRE -PROJECT CONOITIONS.
CONTRACTOR FOR LOCATION OF THE LIMITS. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE
BEYOND THE CONSTRUCTION LIMITS SHALL BE PERMITTED. THE CONSTRUCTION LIMITS SHALL BE
~2
AT A MINIMUM CREEK BYPASS SHALL BE 36'/24" DIAMETER BUTT —FUSED
MAINTAINED BY THE CONTRACTOR FOR THE DURATION OF CONSTRUCTION. LARGE WOODY OEBR'S
HOPE PIPE THE SECTION UPSTREAM AND OUTSIDE OF THE EXISTING
MAY BE PLACED OUTSIDE THE CONSTRUCTION LIMITS.
CULVERT SHALL BE 36" OIA AT MIN. 2% SLOPE MO SHALL HAVE A
3
THE ESC FACILTTIES SHOWN ON THIS PLAN MUST BE CONSTRUCTEO PRIOR TO OR IN CONJUNCT`ON
MITEREO INLET. 36' PIPE SHALL TRANSITION TO 24" DIA USING SPECIALLY
WITH ALL CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO
MADE FITTING THAT MATCHES INVERTS. 24' PIPE SHALL BE SUPPORTED
SURFACE WATERS, DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED
WITHIN EXISTING CULVERT USING CONTRACTOR—DESIGNEO SYSTEM. BYPASS
PIPE SHALL EXTEND FAR ENOUGH OOWNSTREAM TO ELIMINATE NEED FOR
4.
THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTIC PATED SITE
A DOWNSTREAM COFFER DAM AND SHALL EXTEND FAR ENOUGH THAT
CONDITIONS, DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS
OUTLET ELEVATION IS A MINIMUM OF 2 VERTICAL FEET BELOW WORK AREA
NEEDED FOR CONSTRUCTION SEQUENCING AND UNEXPECTED STORM AND SHALL BE
ELEVATION OF INLET SHALL BE 152.5 FT.
MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G., ADDITIONAL SUMP PUMPS,
3
PROVIDE SAND OR GRAVEL-FILLEO BAG COFFER DAM SYSTEM TO
RELOCATION OF OITCHES AND SILT FENCES, ETC.).
ELEVATION 156.5 FT ON UPSTREAM SIDE OF CULVERT. COFFER DAM
SYSTEM TO BE CONTRACTOR -DESIGNED TO WITHSTAND ANTICIPATED
5.
THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED TO ENSURE
HYDROSTATIC FORCES AND WITHSTAND OVERTOPPING. ALSO SEE GENERAL
CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE
NOTE 1 `
ESC FACILITIES. DAMAGED OR IMPROPERLY FUNCTIONING BMPS SHALL BE REPLACED AT NO
ADOITIONAL COST TO THE CITY.
y
CONNECT 12" TEMPORARY STORM ORAIN TO EXISTING 12" CMP AND
6
ANY AREAS OF EXPOSED SOILS THAT WILL NOT BE DISTURBED FOR TWO DAYS SHALL BE i
DIRECT FLOW TO UPSTREAM SIDE OF COFFER DAM.
IMMEOIATELY STABILIZED WITH THE APPROVED ESC METHODS (E.G., SEED NG, MULCH NG, PLASTIC
Q
INSTALL CATCH BASIN INSERTS {4} AT FIRST CB WEST AND EAST OF
COVERING, ETC.).
°
CULVERT. SEE DETAIL 1 ON DWG C3.
7.
AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITH N
EXCAVATE SUMP AT LOW POINT WHERE FLOWS EXIT EXISTING CULVERT.
A CATCH BASIN. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE
LINE SUMP WITH PLASTIC. DIRECT ANY CONTAMINATED CONSTRUCTION
DOWNSTREAM SYSTEM.
WATER/SEEPAGE (E.G., AFTER SAND BLASTING OPERATIONS OR CONCRETE
WORK) DISCHARGING FROM CULVERT TO SUMP AND PUMP TO HOLDING
8
WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, " SHALL BE APPLIED AT
TANK FOR HAUL TO DISPOSAL SITE UPON REMOVAL OF EXISTING DAMAGED
A MINIMUM THICKNESS OF 2 TO 3 INCHES.
CULVERT SECTION, RELOCATE LINED SUMP TO CAPTURE CULVERT SEEPAGE
USE REINFORCED PLASTIC FABRIC TO COVER STOCKPILED ITEMS WHEN NOT IN USE. THE
AT NEW OUTLET LOCATION.
REINFORCED PLASTIC FABRIC SHALL BE HELD DOWN BY A MINIMUM OF 10LB SANDBAGS PLACED
7
INSTALL TEMPORARY SILT FENCE ACROSS CREEK BOTTOM AND AT TOP OF
EVERY 1 D FEET ALONG THE EDGE AND ACROSS THE P LE.
CHANNEL BANKS ALONG CREEK. SEE DETAIL 2 ON DWG C2. AS
10.
IN ACCORDANCE WITH THE DEPARTMENT OF ECOLOGY REQUIREMENTS, WASTEWATER FROM CEMENT
CONSTRUCTION PROCEEDS, RELOCATE SILT FENCE WHEN NECESSARY AND
CONCRETE, MASONRY, ASPHALT CONCRETE CUTTING OR POURING OPERATIONS, PETROLEUM
AS DIRECTED BY ENGINEER.
PRODUCTS, HYDRAULIC FLUID, SEOIMENT-LADEN WATER, CHEMICALS, OR ANY OTHER TOXIC OR
NSTALL SUMP AND PUMP SYSTEM TO COLLECT ANY LEAKAGE FROM
DELETERIOUS MATERIAL SHALL NOT BE ALLOWED TO ENTER OR SEEP INTO STORM DRAINAGE
COFFERDAM AND PUMP TO UPSTREAM SIDE OF COFFERDAM. SUMP TO BE
SYSTEMS OR SURFACE WATERS. ANY WASTAGE OR WATER COMING IN CONTACT WITH FRESH
M NIMUM OF 3 FT DEEP, WITH PERF PIPE AND BACKF1LLE0 WITH WASHED
CONCRETE SHALL BE COLLECTED IN AN IMPERVIOUS SUMP FOR COMPLETE REMOVAL AND DISPOSAL
ROCK.
TO PREVENT CONTAMINANTS FROM ENTERING GROUND OR SURFACE WATERS.
CONTRACTOR MAY USE EXISTING PAVED AREAS WITHIN EASEMENT FOR
11.
CONTRACTOR SHALL COMPLY WITH ALL APPROVED LOCAL, STATE AND FEOERA: REQUIREMENTS FOR
ACCESS AND STAGING. ANY ADDITIONAL STAGING AREA NEEDED SHALL BE
PROTECTION OF WATER QUALITY. SEE PROJECT SPECIFICATIONS FOR COPIES OF PROJECT PERMITS.
•
CONTRACTOR OBTAINED.
A COPY OF THE APPROVED HYORAUUC PROJECT APPROVAL (HPA) SHALL BE KEPT IN A VISIBLE
r
LOCATION. ALL WORK BELOW THE ORDINARY HIGH WATER LINE (OHWL) SHALT. BE BETWEEN JI NE
1 D
CLEARING LIMITS TO CULVERT INLET IS FOR TEMPORARY ACCESS AND
15, 2008 AND OCTOBER 15, 2008.
INSTALLATION OF TESC FEATURES. NOTE AN EXISTING CMP HALF -PIPE IN
THIS AREA WILL NEED TO BE RESTORED IF DISTURBED.
12.
CONTRACTOR SHALL CAPTURE AND SAFELY REMOVE AND RELOCATE FISH WITHIN THE TEMPORARY
DIVERSION AREA IN ACCORDANCE WITH THE HPA REQUIREMENTS. PRIOR TO INSTALLING TEMPORARY
11
A LARGE CLEARING LIMITS AREA IS PROVIDED IN THIS AREA TO PROVIDE
BYPASS, CONTRACTOR SHALL OBTAIN A WASHINGTON DEPARTMENT OF FISH AND WILDLIFE (WDFW)
CONTRACTOR FLEXIBILITY IN SE! ECTING MAIN POINT OF ACCESS TO WORK
SCIENTIFIC COLLECTING PERM? PER SPEC SECTION 1-07.6 AND INSTALL FISH BLOCK NETTS ANO
AREA. ONCE MAIN POINT OF ACCESS IS SELECTED, CONTRACTOR TO
HAND NET FISH FROM WORK AREA PER PERMIT REQUIREMENTS. CONTRACTOR SHALL HAVE A
REDUCE CLEARING LIMITS TO EXTENT PRACTICAL.
QUALIFIED BIOLOGIST CAPTjRE AND SAFELY MOVE FOOD FISH, GAME FISH, AND OTHER FISH LIFE
FROM THE JOB SITE CONTRACTOR SHALL HAVE FISH CAPTURE AND TRANSPORTATION EQUIPMENT
GENERAL NOTES:
ON THE OER SITE. CAPTURED FISH IMMEDIATELY AND SAFELY TRANSFERRED
THESHALL
TO�FR E�� LOWING WATDWWNSTREAM OF PROJECT s
1.
BYPASS SYSTEM IS SIZED TO PASS MODERATE TO HEAVY FALL STORMS BASED
ON 2 YEARS OF GAGED FLOW. CONTRACTOR SHALL MAINTAIN SUFFICIENT
MATERIALS ON SITE TO RAISE HEIGHT OF COFFER DAM 1.5 FT N CASE OF
LARGE STORM EVENT.
�J�IG mmoku
AS SHOWN ,� ' �'0:: C( T 3u OF
RENTON
rAL W" .. - Planning/Building/Public Works Dept.
iOff OKOM
swu Accerdomy
20 C
1 "-2D'-Ow
Scale
CARR ROAD - PANTHER CREEK
EMERGENCY CULVERT REPAIR PROJECT
TEMPORARY EROSION AND SEDIMENT CONTROL
31414