Loading...
HomeMy WebLinkAboutTED4003442.6NE 1 /4 OF SECTION 10, TOWNSHIP 23N, RANGE 5E, W.M. on 0 a a I a I P1 11L Lei :4 It Q z Ld 0 Li 7 Z ry � Q W LL W V 0 0 MCC W I' DEPTH 2'- 4' ROCK -� \N 1 3 3SETTLING DEPTH I177 1 SEDIMENT STORAGE vv�� V DEPTH 3W- 1-112' WASHED GRAVEL NOTE: MAY BE CONSTRUCTED BY EXCAVATION OR BY BUILDING A BERM Y PUBLIC WORKS f DEPARTMENT F N'f 4MIN CROSS SECTION NITS SEDIMENT TRAP Call 2 Working Days Before You Dig 1-800-424-5555 Utilities Underground Location Center (ID,MT,ND,OR,WA) r- VOVERFLOWDEPTH OUTFLOW I CHANNEL IF i- CONSTRUCTEDBY B I EXCAVATION. t I 'MAX I` FILTER FABRIC FENCING STD. PLAN - 211.00 MARCH 2O08 g ROCK MUST COMPLETELY COVER THE m / BOTTOM AND SIDES OF THE DITCH it 24"MIN 2:1 SLOPES v" 2'A' ROCK 161 1 , =THE DISTANCE SUCH THAT POINTS p� �I put% A AND B ARE OF EQUAL ELEVATION - it I I -III- -�_ �A __ B III_111=III-III- II �I--111� c -111-III=II1=1III II -III=1 I I-1 I I III � i l- III - NOTES 1. CONDITION OF USE 1.1. WERE CONCENTRATED RUNOFF FROM DISTURBED AREAS TO AND FROM PONDS OR TRAPS 1.2. TO CONVEY RUNOFF INTERCEPTED FROM UNDISTURBED AREAS AROUND THE SITE TO A NON -EROSIVE DISCHARGE POINT. 2. MAINTENANCE STANDARDS 2 1 ANY SEDIMENT DEPOSITION OF MORE THAN 0 5 FEET SHALL BE REMOVED SO THAT THE CHANNEL IS RESTORED TO ITS ORIGINAL DESIGN CAPACITY. 22 THE CHECK DAMS SHALL BE EXAMINED FOR SIGNS OF SCOURING AND EROSION OF THE BED AND BANKS IF SCOURING AND EROSION HAS OCCURRED, AFFECTED AREAS SHALL BE PROTECTED BY RIPRAP OR AN EROSION CONTROL BLANKET- STD. PLAN - 217.40 PUBLIC WORKS CHECK DAMS SPACING AND s1� PART 'IEN'1 DE � SE CTIONS ECT ONS CROSS S � MARCH 2O08 JOINTS 114 FILTER FABRIC SHALL BE SPLICED AT POSTS USE STAPLES, WIRE RINGS, OR EQUIVALENT TO ATTACH FABRIC TO POSTS U 61 MAX POST SPACING MAY BE INCREASED / e TO B' IF WIRE BACKING IS USED 2,2' BY 14 Ga WIRE OR EQUIVALENT. IF S7ANDARD STRENGTH FABRIC USED FILTER FABRIC I.IINIMUL14',X TRENCH ' SACKER L TRENCH WITH NATIVE SOIL 2',4' WOOD POSTS. STEEL FENCE POSTS, REBAR, OR EQUIVALENT NOTES 1. CONDITION OF USE 1 1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS. 1.2 SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR 15 INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW. ANY CONCENTRATED FLOW MOST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND 2. DESIGN AND INSTALLATION SPECIFICATIONS 2. 1. THE GEOTEXTILE USED MOST MET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MOST BE AVAILABLE ON SITE. A05 (ASTM D47511 30100 SIEVE SIZE 10:0 15MIw71 FOR SILT FILM SPIOD SIEVE SIZE 10.300.151WAI FOR OTHER FABRICS WATER PERMITTIVITY(ASTM D491) 007SECA-1MB41MUM R EXiflA ST0.ENGH FABRIC GRAB TEN5ILE STRENCIIT IASTMD46321 "I,:, MIN FO 1001S. MIN. FOR STANDARD STRENGHT FABRIC GRAB TEIISIL2 EL014GATION (ASTM D4632) 30 n MAX. _ UITRAVIOLATE RESISTANCE (ASTM 043551 70 °.E MIN. 2.2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACK114G TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE. 2.3 WHERE THE FENCE IS INSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 2H:1V 2.4 IF A TYPICAL SILT FENCE IS USED, THE STANDARD 4X4 TRENCH MAY NOT BE REDUCED AS LONG AS THE BOTTOM 8 INCHES OF THE SILT FE14CE IS WELL BURIED AND SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE. 3. MAINTENANCE STANDARDS 3A ANY DAMAGE SHALL BE REPAIR IMMEDIATELY. 3.2 iF CONCENTRATED FLOES ARE EVIDENT UPHILL OD THE FENCE, THEY MUST BE 114TERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND. 3.3 IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVED THE TRAP SEDIMENT. 3.4. SEDIMENT MOST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH 35 IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED STD. PLAN - 214.00 PUBLIC WORKS SILT FENCE DEPARTMENT z MARCH 2008 2:1 MAX SLOPE 41 _,1=I LEVEL BOTTOM 1' MIN - _ �I I II I II i t l-Ill-� I I -III_. 2' MIN SWALE SPACING DEPENDS ON SLOPE GRADIENT NOTES 1. CONDITION OF USE 1. 1 REQUIRED AT: 1.1.1 THE TOP OF ALL SLOPES IN EXCESS OF 3H:1V A14D WITH MORE THAN 20 FEET OF VERTICAL RELIEF i 1.2. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELLOW AVERAGE SLOPE SLOPE PERCENT FLOWPATH LENGTH 20H:1V 3"5% 300FEET _ (10T020)HAV 5-10% 200 FEET (4T030)H:IV 10-25% 100 FEET (2TO4)H:1V 25-50% SD FEET 2. DESIGN AND INSTALLATION SPECIFICATIONS 2 1. FOR SLOPES STEEPER THAN 2H:1V WITH MORE THAN 10 FEET OF VERTICAL RELIEF, BENCHES MAY BE CONSTRUCTED OR CLOSER :''ACED INTERCEPTOR SWALES MAY BE USED THE DESIRE MEASURE MOST BE DESIGNED BY AN ENGINEER TO EFFECTIVELY INTERCEPT THE HIGH VELOCITY RUNOFF TO A SEDIMENT POND OR TRAP. 22 CONSTRUCTION TRAFFIC OVER TEMPORARY SWALES SHALL BE MINIMIZED 3. MAINTENANCE STANDARDS 3 1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMMEDIATELY. /OR ES SHALL BE 32 IF THE FACILITY DO NOT REGULARLY RETAIN STORM RUNOFF, THE (' .APACITY AND FREQUENCY OF THE SWALES INCREASED titi o STD. PLAN - 217.10 °I �4 PUBLIC DEPARTMENT INTERCEPTOR SWALE PFNTo2 MARCH 2O08 OF Wnskj0 D.R. STRONG 1 CITY COMMENTS DATED OCT. 6, 2011 CONSULTING ENGINEERS 2 BAYRLTER REVISION 10604 NE 38th PLACE, SUITE 101 3 CITY COMMENTS DATED NOV. 15, 2011, MYLM KIRKLAND, WA 98033 45232 425.827,3063 OFFICE ISTE11 800.962.1402 TOLL FREE jONAI, I•�I�J_ 425.827.2423 FAX REVISION MAX t S DRAINAGE GRAIE - TRIM > GRATE FRAME SEDIIAE14T AND DEBRIS OVERFLOW BYPASS BELOW INLET GRATE DEVICE / FILTERED 1 WATER 4 SECTION VIEW DRA114AGE GRATE _ - RECTANGULAR GRATE SHOWN -- RETRIEVAL SYSTEM (TYR --- (; \j T- BELOW INLET GRATE DEVICE - / �- OVERFLOW BYPASS (TYP ) ISOMETRIC VIEW NOTES I. Size the Below Inlet Grate Device (BIGD) for the storm water structure It will service. 2- The BIGD shall have a buill-In high -Row relief system (overflow bypass) 3. The retrieval system must allow removal of the BIGD without spilling the collected material 4. Perform maintenance In accordance with Standard Specification 8-01 3(15) ��� o -- -- ---- -- STD. PLAN - 216.30 T PUBLIC WORKS CATCH BASIN FILTER DEP.4R1`MENT MARCH 2O08 EROSION CONTROL NOTES & SPECIFICATIONS _ DRIVEWAYS SHALL BE PAVED TO THE EDGE O OF R-C-W PRIOR TO INSTALLATION OF THE CONSTRUCT 1014 ENTRANCE TO AVOID E!' IS,IOG'pi DAIJAGING OF THE ROADWAY IT IS RECOMMENDED Tr THE R = 2 MIN I !� ENTRANCE BE CROWNED SO THAT RUNOFF DRAINS OFF THE PAD moo. INSTALL DRIVEWAY CULVERT IF THERE 15 A ROADSIDE DITCH PRESENT. AS ,- PER CITY ROAD STANDARDS 4'.B' QUARRY SPALLS GEOTEXTILE --� �- 51 12" MIN THICKNESS - `�\� _ � pR0VIDE FULL WIDTH OF `1 NOTES - -... INGRESSIEGRESSAREA 1. CONDITION OF USE 1 1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE GRABTENSILESTREBNGTH(ASTMD4751) 200 PSI MIN, GRAB TENSILE ELONGATION(ASTtA D4632) 30'%MAX. MULL EN BURST STRENGTH (ASTM D37B6 BOAI 400 P51 MIN. AOS (ASTM D4751) 20-45IU.5. STANDARD SIEVE SIZE( 2. DESIGN AND INSTALLATION SPECIFICATIONS 21 HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN ARES THAT WILL BOT BE USED FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL. IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT. 2 2. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE. 2 3. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE THIS CAN SUBSTANTIALLY INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE 3. MAINTENANCE STANDARDS 3 1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS 32 IF THE ENTRANCE IS NOT PREVENTING SEDIMENT BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE 114 THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF THE WHEEL WASH IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASHED WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND 3 3 ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREAT TO PUBLIC SAFETY IF IT NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONDUCTED THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. 34 ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. 3.5 IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL TRAFFIC 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS, DESIGN ENGINEER. 2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING CONSTRUCTION. 3. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR OTHER CONSTRUCTION TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETED AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITTEE. 4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITTEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITTEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 5. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES. 6. DURING THE TIME PERIOD OF NOVEMBER 1 THROUGH MARCH 31, ALL PROJECT DISTURBED SOIL AREAS GREATER THAN 5,000 SQUARE FEET, THAT ARE TO BE LEFT UNWORKED FOR MORE THAN TWELVE (12) HOURS, SHALL BE COVERED BY MULCH, SODDING, OR PLASTIC COVERING. 7. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD OF 30 DAYS OR MORE, ALL DISTURBED AREAS MUST BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR IN QUESTION. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF APRIL THROUGH SEPTEMBER INCLUSIVE. SEEDING MAY PROCEED, HOWEVER, WHENEVER IT IS IN THE INTEREST OF THE PERMITTEE, BUT MUST BE AUGMENTED WITH MULCHING, NETTING, OR OTHER TREATMENT APPROVED BY THE CITY OF RENTON, OUTSIDE THE SPECIFIED TIME PERIOD. 8, A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE, 15' X 100' X 8" OF 4 TO 6 INCH QUARRY SPALLS SHALL BE LOCATED AT ALL POINTS OF VEHICULAR INGRESS AND EGRESS TO THE CONSTRUCTION SITE. 9. CONSTRUCT VERTICAL WALL DETENTION AND WET POND PER PLANS (SEE SHEET C6 ) AND UTILIZE FOR TEMP. SEDIMENT RETENTION. PLUG VAULT OUTLET, PUMP AS NECESSARY, & DISPOSE OF SEDIMENT LADEN WATER IN A MANNER APPROVED BY THE CITY. STD. PLAN - 215.10 PUBLIC' WORKS STABILIZED DEPARTMENT CONSTRUCTION IEb\9TRAGtl' CE MARCH 2008 R=344205 MAJ MAJ 10.15.11 11.22.11 LRJ LRJ SURVEYED: SCALE: AS NOTED VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/183/199? CTY 0EBROOKEFIELD NORTH DATE: 09-06-":}a-•MAJ 0,.04.,2 LRJ DESIGNED: MAJFIELDBOOK: t"6 RENT0N PAGE: DRAWN: CWA 777 ONE INCH DATUMAT DRAWING NO: CHECKED;,•, FULL SCALE - Planning/Building/Public Works Dept. TESC/ GRADING NOTES & DETAILS IF NOT ONE INCH BY DATE APPR I APPROVED SCALE ACCORDINGLY SHEET: C5 OF`) 1 S' -r - A-NNNN A� b� O O z rxn O CD ni.A to z V r Y N