Loading...
HomeMy WebLinkAboutTED4003443.120 0 0 a w U � w rr 4-1 a Q) N 0 o Lo W L) In w C � Q c m d C Vj C 0 0- m m m Q �m m �o� J 0 �z �O 0 w3� �Zo o N 6 N C) op u z o a O Z J 0 7) 0 0 w a- 0f o_ a_ O a 2 U 2 S w > VI Z cn O 2 ¢ O o w Y w U 0 > p a Q 0- 0o ao ao ao 0 0 0 0 w W o A 0 w Q a oc w z O J Z Z Ld w ry o � C) of 0 LLJ U Q w ? U 0 Ld J o_ a- 0 al � w mOf Of m • i • i � �����000�o�0000�000 LEGEND: PROPOSED CLEAN OUT • EXISTING RIDGE LINE/GRADE BREAK - SPOT EL. 62.00 SPOT EL. TYPE 1 CATCH BASIN 0 CURB FLOW DIRECTIONALITY ARROW _olicl� PARKING STRIPE CURB CONCRETE PARKING STRIPE EX. TYPE 1 CB CONCRETE a ° ° b a. HEAVY DUTY ASPHALT LIGHT DUTY ASPHALT GRADING AND STORM DRAINAGE PLAN FOR STORM DRAINAGE NOTES McDONALUS AT RAINIER AVE. S ■ 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRECONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS, DESIGN ENGINEER. RENTON, WA 2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE "1988 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION" PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATIONS (APWA), AS AMENDED BY THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS. / 3. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS WHICH ARE Y DEVIATION FROM THE APPROVED PLANS WILL ON FILE IN THE DEPARTMENT OF PUBLIC WORKS. AN DEV REQUIRE 0 0 WRITTEN APPROVAL FROM THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS, DESIGN ENGINEER OR STORM WATER UTILITY. 4. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 5. DATUM SHALL BE U.S.G.S UNLESS OTHERWISE APPROVED BY CITY OF RENTON DEPARTMENT OF PUBLIC WORKS. I REFERENCE BENCHMARK AND ELEVATION ARE NOTED ON THE PLANS. i --------- 6. ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING -' CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED. 7. INSTALL A 1' CURB i CUT TO ALLOW STOMWATER TO DISCHARGE TO EXISTING,, 8 I -'- CP .'/ 34 75 EX. SWV DISCHARGES TO BjALE Z :100 � �y5 \ \`•--' J� LIGHT DUTYPAVEMENT I � PER DETAIL 6 SHEET z► 10 (TYP) 9. m ti ♦ '/ - I Q \-36.20 35.85 \�, 10. P 11. 36.25 ,� 35 77 s m rn I CJCJ 36.00 �6 C 12. G 36.3 36.2 w 0 1 36. 5 m \ o I / \` 5.42 \� cp 36.43 O , / 36.38 C 13. 36.80 -� 36 t 37.25rn 1 EX. CB AND 8"-136.70 I .40 yG 36 14. MATCH EXISTING 38 EL=42.98 0� / t -� SD TO BE REMOVED 37.28 EXISTING RIVEWAY TO REMAIN , �,��0 ` 37.80 , MATCH EXISTING 1 EL=44.93 sp" ' ' 1 � 15. b. 36.4 ,$ 1 V. �\ 36.6 36.35 MATCH EXISTING EL=35.67 r ! 41.7 1 G 36.70 ------ 00 42.00 0.501 I -R OE Btu 36.80 I I 1 1 ! \-39. 0 `37 5 - BR _�M -y. ®' EXISTING DRIVEWAY TO RE AIN �<, e / i Rtivt-dF-EX. I PO 42.90it H V`Y D TY. PA EMENT _ A_ CB E 0. 5' TO � c� / so9 P IR ET IL 7 EET _ _ _ 37.15 36.30 EL=36.07 Z �- `� ! \ ! C10 iTYP Y - �' 11 MATCH EXISTING \ / 1 -� �I -z� PAVEMENT SWALE 0 1.1%- N `i 1 ,,,� 42.1 / -- fEL=35.50 v // 0 39.85 / 39.15 00 mI -�' 36 5 - 1 / a ! 0 36.35 , D -t.0% t 18 36.95 36.8 36.35 EX. EL=35.73 I / 1 I 4`% Lit0 /42. 5 37.00.,_ 36.2 38.80 38,80 38.6t� I �. 39.2 38.73 ►38.45 ` 3.509� � 3.35% / 77.40 .30 - 37.3 a O t -► 1 \ 37. 6 PVC 0 1.00% MIN. 37.45 1 a MATCH EXISTING FOR ROOF AND FOOTING •C1 �\\ 1.1 It ! a 38.0 t 7'.45 7.80 EL=37.04 DRAINS N a 1 e b� ` 1 AISE RIM OF EX a 4 , B 1.83 TO AN �- a ° a ° >o ,a ° vl r� SDCO o ao 4 .4 / EL=38.73 a ° ° ° N RIM=38.0 a, 38.60 a IE=34.73°8.®0 38.57.56 �? C) C / o a 37.56 0 N •y I I a ° - „ �� ® ° 37.90 a25 LF 8" D.I. �F EX. CB D TO BE ' �O GRADE BREAK �6 INSTALL ® 1.00% I REMOVED MATCH EXISTING A 1-4" _7 DE BREAK 38• EL=36.18 Q �+ AISE RIM OF EX e a° CONCRETE STEP C 1$ TO AN 38.g a 37.56 37.56 ° EXISTING DRIVEWAY TO REMAI `\ �4 E 5 36 37.8 ^ 'ems ° 37.40 37.50 a , 38.4 ° 37.80 F a CB#4 a 37.80 75 \ fir,,• \ �� 60 37.73 37.80 2.75% 37.55 37.5o B# 1 1 .75 \ 39.5 a 4 a 37 ° a MATCH EXISTING CALL BEFORE YOU DIG' 42 a g� a a a _,�. 37.25 EL=36.34 e.o�a 38.0 GB#�3 ° a a ° e d � 37.59 I 1-800-424-5555 \ r 8,41'W 173.5a 37.68 S8 \ \ � RIDGELINE UTILITY CONFLICT NOTE \ CAUTION: THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POT HOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE 0 1-800-424-5555 AND THEN POT HOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. 37.40 37.67 EL=37.80 57 LF 8" DI ® 1.00% GRASS SEED MAY BE APPLIED BY HYDROSEEDING. THE GRASS SEED MIXTURE, OTHER THAN CITY OF RENTON APPROVED STANDARD MIXES, SHALL BE SUBMITTED BY A LANDSCAPE ARCHITECT AND APPROVED BY THE DEPARTMENT OF PUBLIC WORKS, STORM WATER UTILITY. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARE FOUNDATION IN ACCORDANCE WITH SECTION 7-02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. ALL PIPE BEDDING SHALL BE APWA CLASS "C," WITH THE EXCEPTION OF PVC PIPE. ALL TRENCH BACKFILL SHALL BE COMPACTED TO MINIMUM 95 PERCENT FOR PAVEMENT AND STRUCTURAL FILL AND 90 PERCENT OTHERWISE PER ASTM D-1557-70. PEA GRAVEL BEDDING SHALL BE 6 INCHES AND OVER AND UNDER PVC PIPE. STRUCTURES SHALL NOT BE PERMITTED WITHIN 10 FEET OF THE SPRING LINE OF ANY STORM DRAINAGE PIPE, OR 15 FEET FROM THE TOP OF ANY CHANNEL BANK. ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL. OPEN CUT ROAD CROSSINGS AND EXISTING PUBLIC RIGHT-OF-WAY WILL NOT BE ALLOWED UNLESS SPECIFICALLY APPROVED BY CITY OF RENTON DEPARTMENT OF PUBLIC WORKS, DESIGN ENGINEER. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A DEPTH OF 1 FOOT AND MUST MEET THE FOLLOWING SPECIFICATIONS: 4 INCHES TO 8 INCHES/40 PERCENT TO 70 PERCENT PASSING; 2 INCHES TO 4 INCHES ROCK/30 PERCENT TO 40 PERCENT PASSING; AND -2 INCHES ROCK/10 PERCENT TO 20 PERCENT PASSING. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM UNLESS APPROVED BY THE DEPARTMENT OF PUBLIC WORKS, DESIGN ENGINEER OR STORMWATER UTILITY. AN ACCURATELY DIMENSIONED CERTIFIED AS -BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE SUBMITTED TO THE CITY OF RENTON UPON COMPLETION. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMIT BY THE CITY OF RENTON DOES NOT RELIEVE THE OWNER OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY CONNECTED WITH STORM SURFACE WATER DISPOSITION. FURTHER, THE CITY OF RENTON DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDED DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFT, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACT. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AN APPROVED TRAFFIC CONTROL PLAN BY THE TRAFFIC ENGINEERING DIVISION OF THE DEPARTMENT OF PUBLIC WORKS. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-07.23, TRAFFIC CONTROL, SHALL APPLY. CATCH BASIN DATA TABLE CB#1 TYPE 1 RIM=t38.0 IE=t34.40 CUT IN TO EXISTING 6" PVC. VERIFY DEPTH OF 6" PVC PRIOR TO INSTALLING NEW CB CB#2 TYPE 1 RIM=37.25 IE=f35.00 CB#3 TYPE 1 IE=36.84 36.13 CB#4 TYPE 1 W/DOWNTURNED ELBOW RIM=37.40 IE=36.04 EX. CB DATA CB -A CB-G RIM = 47.10 RIM = 35.24 12" CNC N = 41.95 12" CNC SW = 29.09 8" CNC SW = 42.05 12" CNC S = 28.84 12" ADS N = 28.79 CB-B EX. RIM = 36.90 CB-H RAISE RIM TO EL = 38.73 RIM = 34.91 8" CNC NE=35.45 8" CNC E=32.81 6" PVC S = 35.65 CB-1 CB-C RIM = 33.09 EX. RIM = 36.96 12" CNC NE = 29.29 RAISE RIM TO EL = 37.96 CB-J INSTALL SOLID LID RIM = 35.42 6" PVC N = 35.56 8" CNC N = 33.80 CB-D TO BE REMOVED CB-K TO BE REMOVED RIM = 35.64 RIM = 35.91 6" PVC S = 34.49 8" CNC E = 34.31 CB-E CB - L EX. RIM = 35.67 RIM 35.90 RAISE RIM TO EL = 36.07 8" CNC W = 34.10 6" PVC E=33.97 8" CNC NE=33.78 8" CNC W = 33.85 CB-F RIM = 35.17 12" CNC E 30.62 12" CNC N 30.72 12" CNC S`, - 31.12 R-344319 By: Date: By: Date: By: Date By: Date 4 REVISED PIPE SIZES PER CITY CJ HPG 3 BID RELEASE _ _ ----_ REVISED DRIVE-IHRU AJ IH 2 AJ IH 1 REVISED PER CITY COMMENT LETTER DATED 2/19/08 AJ IH - PRE -APPLICATION MEETING AJ IH NO. REVISION BY APPR. 04/29/08 03/31/08 ft O LL O U � J � J W 0 Q Z co O > > a I Cl)W N aaaW) Z F -J � O C'7 Qr r CU L C ) r r V) _w = C7 U z> o z� gN LLJ a ___1 � aLLJ Zw LL Q O N 00 Z z C:) z 00 m N co r 00 > Fr z ww N Q I Ln I Ln Z 0 Z Ln �� w Ln Ln LLJ J - Y � � C-) L J z Q 0 z 'T W ot �� o�yJ•r 4 C CITY OR RENTON 17>EPAR-117MENT 01= PUBLIC WORKS 03/18/08 DESKMD HPG 1 31 08 / / CRJ DATE 03/ 10/08 DRAWN CHECKED HPG SCALE 1"=20' 01/02/08 DATE APPROVED HPG DIRECTOR OF PUBLIC WORKS FILE NO. LUA 03- FIELD BOOK PAGE SHEET C6 OF 14 I 00 I Do I 3 Ib 0 _c I 00 N X z w z w LL w X 0 I n 0 I 0 U cn Q 03 03 0 0 CN E 0 0 C7 a r � o Z o i • "