Loading...
HomeMy WebLinkAboutTED4003450.16GRATING 3 `o Co 0 N � T Im z a � N� o � a� 0 o � 0 0 / N n i� m ¢ An 0 0 Cal 2 Working Days Before You Dig LIj 1-800-424-5555 E Utfitiee Underground Location Center 0 (ID,MT,ND,OR,WA) d OVERFLOW ELEV. = 392.21 4"0 ELBOW ELEV=390.30 1.25 ORIFICE 4"0 ELBOW ELEV=389.20 1.55 ORIFICE CLEANOUT GATE: SHEAR GATE 8" DIAMETER MIN. (SEE DETAIL THIS SHEET) _z 0 I 04 z 0 cV SECTION A -A ELEVATION SCALE: 1 "=2'-0" CHECKED FOR COMPLIANCE TO CITY STANDARDS RENTON JOB NO. u HANDHOLDS STANDARD GALVANIZED STEEL LADDER/STEPS 18"0 STANDPIPE PIPE SUPPORT (SEE NOTE 3) 3"x .075" ALUMINUM OR .079" STEEL OUTLET PIPE SEE NOTES 5, 6. 18"o S.D -�j 2' M I N IE=384.75, 18"0 PLAN VIEW SCALE: 1 "=2'-O" BOTTOM OF 1' SECTION OF FROP-T ATTACHED BY GASKETED BAND TO ALLOW REMOVAL. RESTRICTOR PLATE WITH 1.00"0 ORIFICE REMOVABLE W) COUPLING 4"0 PLATE WI II ORIFICE AS SPECIFIED A ELBOW DETAIL NOT TO SCALE NOTES: 1. EXCEPT AS SHOWN OR NOTED, UNITS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS FOR CATCH BASIN TYPE 2, 54" MINIMUM DIAMETER. 2. FOR DETAILS SHOWING GRADE RING, LADDER, STEPS, HANDHOLDS, AND TOP SLABS, SEE STANDARD PLAN "MISCELLANEOUS CATCH BASIN DETAILS". 3. PIPE SUPPORTS AND RESTRICTOR/SEPARATOR SHALL BE OF THE SAME MATERIAL, AND BE ANCHORED AT 3' MAXIMUM SPACING BY 5/8" DIA. STAINLESS STEEL EXPANSION BOLTS OR EMBEDDED 2" IN WALL. 4. THE RESTRICTOR/SEPARATOR SHALL BE FABRICATED FROM .060" ALUMINUM, OR .064 ALUMINIZED STEEL, OR .064" GALVANIZED STEEL PIPE: IN ACCORDANCE WITH AASHTO M 36, M 196, AND M 274, GALVANIZED STEEL SHALL HAVE TREATMENT 1. 5. OUTLET SHALL BE CONNECTED TO CULVERT OR STORM PIPE WITH A STANDARD COUPLING BAND FOR CORRUGATED METAL PIPE, OR GROUTED INTO THE BELL OF CONCRETE PIPE. 6. THE VERTICAL RISER STEM OF THE RESTRICTOR/SEPARATOR SHALL BE THE SAME DIAMETER AS THE HORIZONTAL OUTLET PIPE, WITH AN 8" MINIMUM DIAMETER. 7. FRAME AND LADDER OR STEPS ARE TO BE OFFSET SO THAT: A. CLEANOUT GATE IS VISIBLE FROM TOP. B. CLIMB -DOWN SPACE IS CLEAR OF RISER AND GATE. C. FRAME IS CLEAR OF CURB (IF ANY EXISTS). 8. MULTI -ORIFICE ELBOWS MAY BE LOCATED AS SHOWN OR ALL ON ONE SIDE OF RISER TO ASSURE LADDER CLEARANCE. SIZE OF ELBOWS AND PLACEMENT TO BE DETERMINED BY THE ENGINEER. 9. RESTRICTOR PLATES WITH ORIFICE AS SPECIFIED IN THE CONTRACT PLANS. OMIT PLATE IF FOR OIL POLLUTION ONLY. SPECIFIED OPENING TO BE CUT ROUND AND SMOOTH. 10, CLEANOUT/SHEAR GATE: - ALUMINUM ALLOY PER ASTM B-26-ZG-32A OR CAST IRON ASTM A48 CLASS 30B AS REQUIRED. - LIFT HANDLE EITHER SOLID OR TUBING WITH ADJUSTABLE HOOK AS REQUIRED. - NEOPRENE RUBBER GASKET REQUIRED BETWEEN RISER MOUNTING FLANGE AND GATE FLANGE. - MATING SURFACES OF LID AND BODY TO BE MACHINED FOR PROPER FIT. - FLANGE MOUNTING BOLTS SHALL BE 3/8" DIAMETER STAINLESS STEEL. 11. ALTERNATE CLEANOUT/SHEAR GATES TO THE DESIGN SHOWN ON DWG. D-27 ARE ACCEPTABLE, PROVIDED THEY MEET THE MATERIAL SPECIFICATIONS ABOVE AND HAVE A SIX BOLT, 10 3/8" BOLT CIRCLE FOR BOLTING TO THE FLANGE CONNECTION. 12. CLEANOUT GATE SHALL NOT OPEN BEYOND THE CLEAR OPENING AS SHOWN ON "MAX OPENING OF GATE" ON DWG. BR05 BY LIMITING HINGE MOVEMENT, STOP TAB, OR SOME OTHER DEVICE. FIRST SUBMITTAL ESM Il 0/ 15/ 2007 SURVEYED: SCALE: VERTIGAL NAVD isae SECOND SUBMITTAL ESM 1/31/200 1'=10� HORIZONTAL- NaD sa3/iss DESIGNED: � 2 THIRD SUBMITTAL ESM 10/22/201 �R� 3 FOURTH SUBMITTAL ESM 12/06/201 DRAWN: a� ONE INCH DATUM 4 MYLARS ESM 12/22/201 CHECKED: AT FULL SCALE IF NOT ONE INCH 1�0. ,REVISION APPR ]APPROVED: SCALE ACCORDINGLY MAXIMUM OPENING OF GATE LIFT HANDLE SHALL BE ATTACHED PER MANUFACTURER'S RECOMMENDATIONS D SIX EVENLY SPACED HOLES FOR BOLTING TO FLANGE CONNECTION LEVEL LINE / ���r ■T ��r�r HANDLE WITH LOCK PIN kDJUSTABLE LOCK HOOK KITH LOCK SCREW ROD OR TUBING, RIABLE LENGTH LIFT HANDLE NOTES: 1. SHEAR GATE SHALL BE ALUMINUM ALLOY PER ASTM B-26-ZG-32a OR CAST IRON ASTM A48 CLASS 30B AS REQUIRED. 2. GATE SHALL BE 8" DIAMETER FOR PIPE 12 INCHES OR LESS IN DIAMETER, 12" DIAMETER FOR PIPES GREATER THAN 12". 3. GATE SHALL BE JOINED TO TEE SECTION BY BOLTING THROUGH FLANGE. 4. LIFT ROD: AS SPECIFIED BY MFR. WITH HANDLE EXTENDING TO WITHIN ONE FOOT OF COVER AND ADJUSTABLE HOOK LOCK FASTENED TO FRAME OR UPPER HANDHOLD. 5. GATE SHALL NOT OPEN BEYOND THE CLEAR OPENING BY LIMITED HINGE MOVEMENT, STOP TAB, OR SOME OTHER DEVICE. 6. NEOPRENE RUBBER GASKET REQUIRED BETWEEN RISER MOUNTING FLANGE AND GATE FLANGE. 7. MATING SURFACES OF LID AND BODY TO BE MACHINED FOR PROPER FIT. 8. FLANGE MOUNTING BOLTS SHALL BE 3/8" DIAMETER STAINLESS STEEL. 9. ALTERNATE SHEAR GATES TO THE DESIGN SHOWN ARE ACCEPTABLE, PROVIDED THEY MEET THE MATERIAL SPECIFICATIONS ABOVE. R=345016 CITY OF GLADCO DEVELOPMENT, L.L.C. ROSEWOOD HIGHLANDS RENTON PEA°" DRAWING N0: Planning/Building/Public works Dept. DETENTION VAULT DETAILS AND NOTES PN-02 SHEET: OF 16 31 V, J Z L I- J C z J Z C T Z W a � C \W Q Lu 0 t r C O � Li W Q C J u) v � 0C rr (k LL LL U u o a 0, `� C n v0 m �z a 1 ® d W vv C C V O 0) rn �N a r> > oC 0 E co p v', .• U sC5 3: V V o 0 p1 - C o 2 � a :� 00_(D v rmLL a� 3 ` 3 � Y 00 3 �� o 03: C W O va' � L v ff-'w 4O C/STE� s�ONAL E� Z2;!# JOB NO : 1352-001-006 DWG. NAME: PN-02 DESIGNED BY: KAO DRAWN BY CLC CHECKED BY: DATE: 12/22/2010 DATE OF PRINT: PN-02 16 OF 31 SHEETS 0 h 0 e Oq 1 n z c 1 w r Y , n 0