Loading...
HomeMy WebLinkAboutTED4003450.37REVISIONS ACCESS ROAD INVISIBLE STRUCTURE, INC. GRASS B PAVE 2 OR APPROVED EQUAL. INSTALL PER MANUFACTURES RECOMMENDATIONS 24"0 MANHOLE ACCESS T.G.=395.00 CELL #1 381.55 tE=381. 5, 24"0 5'x10' REMOVABLE GRATED OPENING T.G. 396.00 LADDER PER STRUCTURAL PLANS. '00' REMOVABLE RATED OPENING .G. 596.0f- 396.26 OPENING/BAFFLE WALL PER STRUCTURAL PLANS CELL #2 SEE STRUCTURAL PLANS FOR CONSTRUCTION OF WALLS, FLOORS AND GRATING (TYP) ROCK LINING PAD PER DETAIL ON SHEET DT-01 I E = 884-;FS, 18" 384.81 CONTROL STRUCTURE PER SHEET PN-02 5'x10' REMOVABLE GRATED OPENING — T.G. 396.E)E) 396.26 LADDER PER STRUCTURAL PLANS. B DETENTION FACILITY PLAN 100 YR. EL. = Z�� 392.23 BOTTOM OF LID =892.4;- 392.95 24"0 INLET PIPE CELL #3 5'x14' REMOVABLE GRATED OPENING T.G. 396.00 LADDER PER STRUCTURAL PLANS. OPENING PER STRUCTURAL PLANS nnerrn nnC�u►ln CONTRACTOR TO HAND DIG DRAINAGE CHANNEL 2'W WITH 2:1 SLOPES ® 0.50% MIN. TO DAYLIGHT IN BUFFER AREA LADDER PER STRUCTURAL V PLANS. I WETLAND BUFFER I I l I I FINISH GRADE EL. = 395.00 GRATED OPENING T.G. = 396-99- 396.26 378.20 378.25 378.20 378.19 EXTRA CURB/WALL FOR SOIL RETENTION PER STRUCTURAL PLANS STAND PIPE PER DETAIL SHEET PN-02 18"0 OUTLET PIPE 384.81 / CONTRACTOR TO HAND DIG DRAINAGE CHANNEL 2'W WITH 2:1 SIDE SLOPES AT 0.50% MIN, TO ZIwLl- DAYLIGHT IN BUFFER AREA II L� ---------- ROCK LINING PAD PER DETAIL ON SHEET DT-01 SEE STRUCTURAL PLANS FOR CONSTRUCTION OF WALLS AND FOOTINGS (TYP) 381.49 381.48 TOP OF LID=393.75 BOTTOM OF LID -z392-;F l 392.95 GRATED OPENING T.G. = 596..68- 392.26 381.57 381.45 CCC C`r0l I/''rl I0AI of AAIC CnO n VGS SEE STRUCTURAL PLANS FOR CONSTRUCTION OF WALLS, FLOORS AND GRATING (TYP) SCALE: 1 " = 10' 10' 5' 0 10' 20' ETENTION AND WATER QUALITY POND ITEM MIN. EL. MAX. EL. REO'D VOL. DESIGN VOL. AS -BUILT VOL. CELL 1=378.75 DEAD STORAGE CELL 2=381.75 384.75 13,353 CF 24,960 CF 25,459 CF CELL 3=381.75 LIVE STORAGE 384.75 392.21 45,387 CF 46,550 CF 46,3W C*_ NOTES: 1. VAULT OPENING LOCATIONS AND SIZES ARE ESTIMATED. SEE STRUCTURAL PLANS FOR ACTUAL LOCATIONS, OPENING SIZES, AND CONSTRUCTION. 2. VAULT IS TO HAVE APPROXIMATELY 1.25' FOOT OF SOIL ON TOP THAT IS PLANTED WITH GRASS. Or in9: 1aZaI»DIME BOTTOM OF LID EL. PER STRUCTURAL PLANS EXTRA CURB/WALL FOR SOIL RETENTION PER STRUCTURAL PLANS OPENING PER STRUCTURAL PLANS BAFFLE TOP ELEV.=385.75 BOTTOM ELEV.=382.00 D-1A EA 17 SECOND SUBMITTAL 1 01/31/2008 ESM 2 THIRD SUBMITTAL ESM 10/22/2010 3 FOURTH SUBMITTAL ESM 12/06/2010 MYLARS 4 ESM 12/22/2010 5 CONSTRUCTION SET ESM 02/24/2011 6 AS BUILTS ESM 09/12/2011 7 AS BUILT MYLARS ESM 10/19/2011 z O H C9 z 2 V ♦ Q 3 0 z z O U W T V) i 0 Q - z a- M O In mo ��YY c ca � a o U ® Ii z e�w C C co m o .� o` 20 ao E cn N 0) �' rn '2 j -a) >� oc co( E (t 0 c 3_ U c o c � • o °0a cn i5 �, , -.3 V m LL E a� 3 3 °Y 3 cI- 0 rn3 c WV �a L 4233�' \c/ STEM JOB NO.: 1352-001-006 DWG. NAME: PN-01 DESIGNED BY: KAO DRAWN BY: CLC CHECKED BY: DATE: 10/19/2011 DATE OF PRINT: 9 15 OF 31 SHEETS